Green Island Power Authority; Notice of Authorization for Continued Project Operation, 19338-19339 [2011-8249]
Download as PDF
19338
Federal Register / Vol. 76, No. 67 / Thursday, April 7, 2011 / Notices
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 31, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–8250 Filed 4–6–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–142–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
Tennessee Gas Pipeline Company;
Notice of Application
Take notice that on March 18, 2011,
Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002, filed an
application in Docket No. CP11–142–
000 pursuant to section 7(b) of the
Natural Gas Act (NGA) and Part 157 of
the Commission’s regulations,
requesting authorization to abandon in
place and by removal certain inactive
supply pipelines, associated meters, and
appurtenances located primarily in the
East and West Cameron areas in federal
offshore waters of the Outer Continental
Shelf, Louisiana, referred to as the
Southwest Leg Abandonment Project.
The facilities to be abandoned include
approximately 64.5 miles of 30-inch,
10.5 miles of 24-inch, 13.5 miles of 16inch and 2.5 miles of 10-inch supply
pipelines, as well as related meters and
associated appurtenances. Tennessee
states that the subject facilities have
been out of service due to damage
received by Hurricane Ike in September
2008, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site web at
VerDate Mar<15>2010
19:53 Apr 06, 2011
Jkt 223001
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to Thomas
G. Joyce, Manager, Certificates,
Tennessee Gas Pipeline Company, 1001
Louisiana Street, Houston, Texas 77002,
by telephone at (713) 420–3299, by
facsimile at (713) 420–1473, or by e-mail
at tom.joyce@elpaso.com; Susan T.
Halbach, Senior Counsel, Tennessee Gas
Pipeline Company, 1001 Louisiana
Street, Houston, Texas 77002, by
telephone at (713) 420–5751, by
facsimile at (713) 420–1601, or by e-mail
at susan.halbach@elpaso.com; or Debbie
Kalisek, Regulatory Analyst, Tennessee
Gas Pipeline Company, 1001 Louisiana
Street, Houston, Texas 77002, by
telephone at (713) 420–3292, by
facsimile at (713) 420–1473, or by e-mail
at debbie.kalisek@elpaso.com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
provide copies of their protests only to
the party or parties directly involved in
the protest.
Protests and interventions may be
filed electronically via the Internet in
lieu of paper; see, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Comment Date: April 21, 2010.
Dated: March 31, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–8247 Filed 4–6–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13–023]
Green Island Power Authority; Notice
of Authorization for Continued Project
Operation
On March 2, 2009 Green Island Power
Authority, licensee for the Green Island
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Green Island Hydroelectric Project
is on the Hudson River in Albany
County, New York.
The license for Project No. 13 was
issued for a period ending March 2,
2011. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
E:\FR\FM\07APN1.SGM
07APN1
Federal Register / Vol. 76, No. 67 / Thursday, April 7, 2011 / Notices
DEPARTMENT OF ENERGY
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 12, 2011.
Federal Energy Regulatory
Commission
Dated: April 1, 2011.
Kimberly D. Bose,
Secretary.
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 13 is
issued to the Green Island Power
Authority for a period effective March 3,
2011 through March 2, 2012, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before March 2,
2012, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Green Island Power Authority is
authorized to continue operation of the
Green Island Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: March 31, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–8249 Filed 4–6–11; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. PR11–71–001; Docket No.
PR11–72–001; Docket No. PR11–73–001;
Not Consolidated]
[FR Doc. 2011–8300 Filed 4–6–11; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSKH9S0YB1PROD with NOTICES
Southcross Gulf Coast Transmission
Ltd.; Southcross Mississippi Pipeline,
L.P.; Southcross CCNG Transmission
Ltd.; Notice of Baseline Filings
Take notice that on March 29, 2011,
the applicants listed above submitted a
revised baseline filing of their Statement
of Operating Conditions for services
provided under section 311 of the
Natural Gas Policy Act of 1978
(‘‘NGPA’’).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
VerDate Mar<15>2010
19:53 Apr 06, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–57–000.
Applicants: Morgan Stanley Capital
Group Inc., Mitsubishi UFJ Financial
Group, Inc.
Description: Joint Application for
Authorization under section 203 of the
Federal Power Act of MS Utilities and
MUFG.
Filed Date: 03/29/2011.
Accession Number: 20110329–5152.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Docket Numbers: EC11–58–000.
Applicants: Penta Wind Holding,
LLC.
Description: Penta Wind Holding, LLC
Application for Approval under section
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
19339
203 of the Federal Power Act and
Request for Expedited Action.
Filed Date: 03/29/2011.
Accession Number: 20110329–5153.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2224–004.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc. submits tariff
filing per 35: Compliance Filing—ICAP
Demand Curve Tariff Revisions to be
effective 12/31/9998.
Filed Date: 03/29/2011.
Accession Number: 20110329–5142.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Docket Numbers: ER11–2224–004.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc. submits tariff
filing per: Supplement to NYISO
3/29/11 ICAP Demand Curve Filing to
be effective N/A.
Filed Date: 03/30/2011.
Accession Number: 20110330–5026.
Comment Date: 5 p.m. Eastern Time
on Wednesday, April 20, 2011.
Docket Numbers: ER11–2528–001.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per 35.17(b):
Response to Request for Additional
Information (North Buffalo Wind GIA)
to be effective 12/10/2010.
Filed Date: 03/29/2011.
Accession Number: 20110329–5109.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Docket Numbers: ER11–2541–001.
Applicants: Louisville Gas and
Electric Company.
Description: Louisville Gas and
Electric Company submits tariff filing
per 35: Att C Compliance Filing 3/29/11
to be effective 4/1/2011.
Filed Date: 03/29/2011.
Accession Number: 20110329–5049.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Docket Numbers: ER11–3026–001.
Applicants: Aspen Merchant Energy,
LP.
Description: Aspen Merchant Energy,
LP submits tariff filing per 35.17(b):
Supplemental Market Based Rate Filing
for Aspen Merchant Energy LP to be
effective 3/28/2011.
Filed Date: 03/29/2011.
Accession Number: 20110329–5067.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 76, Number 67 (Thursday, April 7, 2011)]
[Notices]
[Pages 19338-19339]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-8249]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13-023]
Green Island Power Authority; Notice of Authorization for
Continued Project Operation
On March 2, 2009 Green Island Power Authority, licensee for the
Green Island Hydroelectric Project, filed an Application for a New
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Green Island Hydroelectric Project is on
the Hudson River in Albany County, New York.
The license for Project No. 13 was issued for a period ending March
2, 2011. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a
[[Page 19339]]
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 13 is issued to the
Green Island Power Authority for a period effective March 3, 2011
through March 2, 2012, or until the issuance of a new license for the
project or other disposition under the FPA, whichever comes first. If
issuance of a new license (or other disposition) does not take place on
or before March 2, 2012, notice is hereby given that, pursuant to 18
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Green Island Power Authority is authorized to
continue operation of the Green Island Hydroelectric Project, until
such time as the Commission acts on its application for a subsequent
license.
Dated: March 31, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-8249 Filed 4-6-11; 8:45 am]
BILLING CODE 6717-01-P