Download as PDF 19338 Federal Register / Vol. 76, No. 67 / Thursday, April 7, 2011 / Notices requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 31, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–8250 Filed 4–6–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–142–000] mstockstill on DSKH9S0YB1PROD with NOTICES Tennessee Gas Pipeline Company; Notice of Application Take notice that on March 18, 2011, Tennessee Gas Pipeline Company (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket No. CP11–142– 000 pursuant to section 7(b) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, requesting authorization to abandon in place and by removal certain inactive supply pipelines, associated meters, and appurtenances located primarily in the East and West Cameron areas in federal offshore waters of the Outer Continental Shelf, Louisiana, referred to as the Southwest Leg Abandonment Project. The facilities to be abandoned include approximately 64.5 miles of 30-inch, 10.5 miles of 24-inch, 13.5 miles of 16inch and 2.5 miles of 10-inch supply pipelines, as well as related meters and associated appurtenances. Tennessee states that the subject facilities have been out of service due to damage received by Hurricane Ike in September 2008, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site web at VerDate Mar<15>2010 19:53 Apr 06, 2011 Jkt 223001 https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420–3299, by facsimile at (713) 420–1473, or by e-mail at tom.joyce@elpaso.com; Susan T. Halbach, Senior Counsel, Tennessee Gas Pipeline Company, 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420–5751, by facsimile at (713) 420–1601, or by e-mail at susan.halbach@elpaso.com; or Debbie Kalisek, Regulatory Analyst, Tennessee Gas Pipeline Company, 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420–3292, by facsimile at (713) 420–1473, or by e-mail at debbie.kalisek@elpaso.com. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 provide copies of their protests only to the party or parties directly involved in the protest. Protests and interventions may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: April 21, 2010. Dated: March 31, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–8247 Filed 4–6–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13–023] Green Island Power Authority; Notice of Authorization for Continued Project Operation On March 2, 2009 Green Island Power Authority, licensee for the Green Island Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Green Island Hydroelectric Project is on the Hudson River in Albany County, New York. The license for Project No. 13 was issued for a period ending March 2, 2011. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a E:\FR\FM\07APN1.SGM 07APN1 Federal Register / Vol. 76, No. 67 / Thursday, April 7, 2011 / Notices DEPARTMENT OF ENERGY be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Tuesday, April 12, 2011. Federal Energy Regulatory Commission Dated: April 1, 2011. Kimberly D. Bose, Secretary. license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 13 is issued to the Green Island Power Authority for a period effective March 3, 2011 through March 2, 2012, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before March 2, 2012, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Green Island Power Authority is authorized to continue operation of the Green Island Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: March 31, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–8249 Filed 4–6–11; 8:45 am] BILLING CODE 6717–01–P [Docket No. PR11–71–001; Docket No. PR11–72–001; Docket No. PR11–73–001; Not Consolidated] [FR Doc. 2011–8300 Filed 4–6–11; 8:45 am] BILLING CODE 6717–01–P mstockstill on DSKH9S0YB1PROD with NOTICES Southcross Gulf Coast Transmission Ltd.; Southcross Mississippi Pipeline, L.P.; Southcross CCNG Transmission Ltd.; Notice of Baseline Filings Take notice that on March 29, 2011, the applicants listed above submitted a revised baseline filing of their Statement of Operating Conditions for services provided under section 311 of the Natural Gas Policy Act of 1978 (‘‘NGPA’’). Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must VerDate Mar<15>2010 19:53 Apr 06, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC11–57–000. Applicants: Morgan Stanley Capital Group Inc., Mitsubishi UFJ Financial Group, Inc. Description: Joint Application for Authorization under section 203 of the Federal Power Act of MS Utilities and MUFG. Filed Date: 03/29/2011. Accession Number: 20110329–5152. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Docket Numbers: EC11–58–000. Applicants: Penta Wind Holding, LLC. Description: Penta Wind Holding, LLC Application for Approval under section PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 19339 203 of the Federal Power Act and Request for Expedited Action. Filed Date: 03/29/2011. Accession Number: 20110329–5153. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–2224–004. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc. submits tariff filing per 35: Compliance Filing—ICAP Demand Curve Tariff Revisions to be effective 12/31/9998. Filed Date: 03/29/2011. Accession Number: 20110329–5142. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Docket Numbers: ER11–2224–004. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc. submits tariff filing per: Supplement to NYISO 3/29/11 ICAP Demand Curve Filing to be effective N/A. Filed Date: 03/30/2011. Accession Number: 20110330–5026. Comment Date: 5 p.m. Eastern Time on Wednesday, April 20, 2011. Docket Numbers: ER11–2528–001. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits tariff filing per 35.17(b): Response to Request for Additional Information (North Buffalo Wind GIA) to be effective 12/10/2010. Filed Date: 03/29/2011. Accession Number: 20110329–5109. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Docket Numbers: ER11–2541–001. Applicants: Louisville Gas and Electric Company. Description: Louisville Gas and Electric Company submits tariff filing per 35: Att C Compliance Filing 3/29/11 to be effective 4/1/2011. Filed Date: 03/29/2011. Accession Number: 20110329–5049. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Docket Numbers: ER11–3026–001. Applicants: Aspen Merchant Energy, LP. Description: Aspen Merchant Energy, LP submits tariff filing per 35.17(b): Supplemental Market Based Rate Filing for Aspen Merchant Energy LP to be effective 3/28/2011. Filed Date: 03/29/2011. Accession Number: 20110329–5067. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. E:\FR\FM\07APN1.SGM 07APN1

Agencies

[Federal Register Volume 76, Number 67 (Thursday, April 7, 2011)]
[Notices]
[Pages 19338-19339]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-8249]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13-023]


Green Island Power Authority; Notice of Authorization for 
Continued Project Operation

    On March 2, 2009 Green Island Power Authority, licensee for the 
Green Island Hydroelectric Project, filed an Application for a New 
License pursuant to the Federal Power Act (FPA) and the Commission's 
regulations thereunder. The Green Island Hydroelectric Project is on 
the Hudson River in Albany County, New York.
    The license for Project No. 13 was issued for a period ending March 
2, 2011. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the 
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee under the terms and 
conditions of the prior license until a new license is issued, or the 
project is otherwise disposed of as provided in section 15 or any other 
applicable section of the FPA. If the project's prior license waived 
the applicability of section 15 of the FPA, then, based on section 9(b) 
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth 
at 18 CFR 16.21(a), if the licensee of such project has filed an 
application for a subsequent license, the licensee may continue to 
operate the project in accordance with the terms and conditions of the 
license after the minor or minor part license expires, until the 
Commission acts on its application. If the licensee of such a project 
has not filed an application for a subsequent license, then it may be 
required, pursuant to 18 CFR 16.21(b), to continue project operations 
until the Commission issues someone else a

[[Page 19339]]

license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 13 is issued to the 
Green Island Power Authority for a period effective March 3, 2011 
through March 2, 2012, or until the issuance of a new license for the 
project or other disposition under the FPA, whichever comes first. If 
issuance of a new license (or other disposition) does not take place on 
or before March 2, 2012, notice is hereby given that, pursuant to 18 
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Green Island Power Authority is authorized to 
continue operation of the Green Island Hydroelectric Project, until 
such time as the Commission acts on its application for a subsequent 
license.

    Dated: March 31, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-8249 Filed 4-6-11; 8:45 am]
BILLING CODE 6717-01-P