Notice of Quarterly Report (October 1, 2010-December 31, 2010), 19131-19147 [2011-8104]
Download as PDF
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Signed at Washington, DC, on March 31,
2011.
David Michaels,
Assistant Secretary of Labor for Occupational
Safety and Health.
[FR Doc. 2011–8120 Filed 4–5–11; 8:45 am]
BILLING CODE 4510–26–P
MILLENNIUM CHALLENGE
CORPORATION
[MCC FR 11–03]
Notice of Quarterly Report (October 1,
2010–December 31, 2010)
Millennium Challenge
Corporation.
SUMMARY: The Millennium Challenge
Corporation (MCC) is reporting for the
quarter October 1, 2010 through
December 31, 2010, on assistance
provided under section 605 of the
Millennium Challenge Act of 2003 (22
AGENCY:
19131
U.S.C. 7701 et seq.), as amended (the
Act), and on transfers or allocations of
funds to other federal agencies under
section 619(b) of the Act. The following
report will be made available to the
public by publication in the Federal
Register and on the Internet Web site of
the MCC (https://www.mcc.gov) in
accordance with section 612(b) of the
Act.
Dated: March 29, 2011.
T. Charles Cooper,
Vice President, Congressional and Public
Affairs, Millennium Challenge Corporation.
ASSISTANCE PROVIDED UNDER SECTION 605
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Madagascar
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Madagascar
Total obligation: $87,998,166
Total Quarterly Expenditures1: $12,976
$30,123,098
Increase Land Titling
and Security.
$29,304,770
Financial Sector Reform
Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Land Tenure Project .....
$25,705,099
Increase Competition in
the Financial Sector.
$23,535,781
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00103
Fmt 4703
Measures
Sfmt 4703
Area secured with land certificates or titles in the
Zones.
Legal and regulatory reforms adopted.
Number of land documents inventoried in the
Zones and Antananarivo.
Number of land documents restored in the
Zones and Antananarivo.
Number of land documents digitized in the
Zones and Antananarivo.
Average time for Land Services Offices to issue
a duplicate copy of a title.
Average cost to a user to obtain a duplicate
copy of a title from the Land Services Offices.
Number of land certificates delivered in the
Zones during the period.
Number of new guichets fonciers operating in
the Zones.
The 256 Plan Local d’Occupation Foncier—Local
Plan of Land Occupation (PLOFs) are completed.
Volume of funds processed annually by the national payment system.
Number of accountants and financial experts
registered to become CPA.
Number of Central Bank branches capable of accepting auction tenders.
Outstanding value of savings accounts from
CEM in the Zones.
Number of MFIs participating in the Refinancing
and Guarantee funds.
Maximum check clearing delay.
Network equipment and integrator.
Real time gross settlement system (RTGS).
Telecommunication facilities.
Retail payment clearing system.
Number of CEM branches built in the Zones.
Number of savings accounts from CEM in the
Zones.
Percent of Micro-Finance Institution (MFI) loans
recorded in the Central Bank database.
E:\FR\FM\06APN1.SGM
06APN1
19132
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Objectives
Agricultural Business Investment Project.
$13,687,987
Program Administration 2
and Control, Monitoring and Evaluation.
Pending subsequent reports 3.
Cumulative
expenditures
Improve Agricultural
Projection Technologies and Market
Capacity in Rural
Areas.
$13,582,534
$18,481,991
Measures
Number of farmers receiving technical assistance.
Number of marketing contracts of ABC clients.
Number of farmers employing technical assistance.
Value of refinancing loans and guarantees
issued to participating MFIs (as a measure of
value of agricultural and rural loans).
`
Number of Mnistere de l’Agriculture, de l’Elevage
ˆ
et de la Peche- Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in
marketing and investment promotion.
Number of people receiving information from Agricultural Business Center (ABCs) on business
opportunities.
$17,802,882
$1,368,813
FY2010 Madagascar post-compact disbursement related to final payment of audit expenses.
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Honduras
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Honduras
Rural Development
Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Transportation Project ...
Measures
Total obligation: $205,000,000
Total Quarterly Expeditures1: $7,025,275
$68,273,380
Increase the productivity
and business skills of
farmers who operate
small and mediumsize farms and their
employees.
$68,197,673
$120,591,240
Reduce transportation
costs between targeted production centers and national, regional and global markets.
$121,211,917
Number of program farmers harvesting highvalue horticulture crops.
Number of hectares harvesting high-value horticulture crops.
Number of business plans prepared by program
farmers with assistance from the implementing
entity.
Total value of net sales.
Total number of recruited farmers receiving technical assistance.
Value of loans disbursed to farmers, agribusiness, and other producers and vendors in
the horticulture industry, including Program
Farmers, cumulative to date, Trust Fund Resources.
Number of loans disbursed (disaggregated by
trust fund, leveraged from trust fund, and institutions receiving technical assistance from
ACDI–VOCA).
Number of hectares under irrigation.
Number of farmers connected to the community
irrigation system.
Freight shipment cost from Tegucigalpa to Puerto Cortes.
Average annual daily traffic volume—CA–5.
International roughness index (IRI)—CA–5.
Kilometers of road upgraded—CA–5.
Percent of contracted road works disbursed—
CA–5.
Average annual daily traffic volume—secondary
roads.
International roughness index (IRI)—secondary
roads
Kilometers of road upgraded—secondary roads.
Average annual daily traffic volume—rural roads.
Average speed—Cost per journey (rural roads)
Kilometers of road upgraded—rural roads.
Percent disbursed for contracted studies.
Value of signed contracts for feasibility, design,
supervision and program mgmt contracts.
Kilometers (km) of roads under design.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Objectives
Cumulative
expenditures
19133
Measures
Number of Construction works and supervision
contracts signed.
Kilometers (km) of roads under works contracts.
Program Administration,2 and Control,
Monitoring and Evaluation.
Pending subsequent reports 3.
Projects
$16,135,380
$15,081,707
$0
Obligated
Objectives
Cumulative
expenditures
Country: Cape Verde
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Cape Verde
Total obligation: $110,078,488
Total Quarterly Expenditures1: $2,055,100
$12,031,549
Increase agricultural
production in three
targeted watershed
areas on three islands.
$11,264,926
Infrastructure Improvement Project.
$82,630,208
Increase integration of
the internal market
and reduce transportation costs.
$78,967,304
Private Sector Development Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Watershed and Agricultural Support Project.
$1,931,223
Spur private sector development on all islands through increased investment in
the priority sectors
and through financial
sector reform.
$1,595,002
Program Administration,2 and Control,
Monitoring and Evaluation.
Pending subsequent reports 3.
$13,485,508
VerDate Mar<15>2010
16:52 Apr 05, 2011
Measures
Productivity: Horticulture, Paul watershed.
Productivity: Horticulture, Faja watershed.
Productivity: Horticulture, Mosteiros watershed.
Number of farmers adopting drip irrigation: All
intervention watersheds (Paul, Faja and
Mosteiros) (incremental).
Area irrigated with drip irrigation: All intervention
watersheds (Paul, Faja and Mosteiros) (incremental).
Irrigation Works: Percent contracted works disbursed. All intervention watersheds (Paul, Faja
and Mosteiros) (incremental).
Number of reservoirs constructed in all intervention watersheds (Paul, Faja and Mosteiros) (incremental).
Number of farmers that have completed training
in at least 3 of 5 core agricultural disciplines:
All intervention watersheds (Paul, Faja and
Mosteiros) (incremental).
Travel time ratio: percentage of beneficiary population further than 30 minutes from nearest
market.
Kilometers of roads rehabilitated.
Percent of contracted Santiago Roads works disbursed (cumulative).
Percent of contracted Santo Antao Bridge works
disbursed (cumulative).
Port of Praia: percent of contracted port works
disbursed (cumulative).
Cargo village: percent of contracted works disbursed (cumulative).
Quay 2 improvements: percent of contracted
works disbursed (cumulative).
Access road: percent of contracted works disbursed (cumulative).
MFI portfolio at risk, adjusted (level).
$12,509,672
$516,776
Jkt 223001
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
19134
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Nicaragua
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Nicaragua
Total obligation: $113,478,345
Total Quarterly Expenditures1: $ 1,561,680
$7,180,454
Increase Investment by
strengthening property
rights.
$6,289,228
Transportation Project ...
$58,000,000
Reduce transportation
costs between Leon
and Chinandega and
national, regional and
global markets.
$54,867,252
Rural Development
Project.
$32,875,845
Increase the value
added of farms and
enterprises in the region.
$30,603,852
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
mstockstill on DSKH9S0YB1PROD with NOTICES
Property Regularization
Project.
$15,422,046
VerDate Mar<15>2010
16:52 Apr 05, 2011
Measures
Automated database of registry and cadastre installed in the 10 municipalities of Leon.
Value of land, urban.
Value of land, rural.
Time to conduct a land transaction.
Number of additional parcels with a registered
title, urban.
Number of additional parcels with a registered
title, rural.
Area covered by cadastral mapping.
Cost to conduct a land transaction.
Annual Average daily traffic volume: N1 Section
R1.
Annual Average daily traffic volume: N1 Section
R2.
Annual Average daily traffic volume: Port
Sandino (S13).
Annual
Average
daily
traffic
volume:
Villanueva—Guasaule Annual.
Average daily traffic volume: Somotillo-Cinco
Pinos (S1).
´
Annual average daily traffic volume: Leon˜
Poneloya-Las Penitas.
International Roughness Index: N–I Section R1.
International Roughness Index: N–I Section R2.
International Roughness Index: Port Sandino
(S13).
International roughness index: Villanueva—
Guasaule.
International roughness index: Somotillo-Cinco
Pinos.
´
International roughness index: Leon-Poneloya˜
Las Penitas.
Kilometers of NI upgraded: R1 and R2 and S13.
Kilometers of NI upgraded: Villanueva—
Guasaule.
Kilometers of S1 road upgraded.
Kilometers of S9 road upgraded.
Number of beneficiaries with business plans.
Numbers of manzanas (1 Manzana = 1.7 hectares), by sector, harvesting higher-value
crops.
Number of beneficiaries with business plans prepared with assistance of Rural Business Development Project.
Number of beneficiaries implementing Forestry
business plans under Improvement of Water
Supplies Activity.
Number of Manzanas reforested.
Number of Manzanas with trees planted.
$14,172,209
$1,496,404
Jkt 223001
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Georgia
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Georgia
19135
Measures
Total obligation: $395,300,000
Total Quarterly Expenditures1: $20,153,289
Regional Infrastructure
Rehabilitation Project.
$313,250,000
Key Regional Infrastructure Rehabilitated.
$266,179,261
Regional Enterprise Development Project.
$52,530,800
Enterprises in Regions
Developed.
$45,474,493
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
$29,519,200
Household savings from Infrastructure Rehabilitation Activities.
Savings in vehicle operating costs (VOC).
International roughness index (IRI).
Annual average daily traffic (AADT).
Travel Time.
Road paved/completed.
Construction Works completed (Contract 1).
Construction Works completed (Contract 2).
Signed contracts for feasibility and/or design
studies.
Percent of contracted studies disbursed.
Kilometers of roads under design.
Signed contracts for road works.
Kilometers of roads under works contracts.
Sites rehabilitated (phases I, II, III)—pipeline.
Construction works completed (phase II)—pipeline.
Savings in household expenditures for all RID
subprojects.
Population Served by all RID subprojects.
RID Subprojects completed.
Value of RID Grant Agreements signed.
Value of project works and goods contracts
Signed.
RID subprojects with works initiated.
Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF).
Household net income—ADA and GRDF.
Jobs created—ADA.
Firm income—ADA.
Household net income—ADA.
Beneficiaries (direct and indirect)—ADA.
Grant agreements signed—ADA.
Increase in gross revenues of portfolio companies (PC).
Increase in portfolio company employees.
Increase in wages paid to the portfolio company
employees.
Portfolio companies (PC).
Funds disbursed to the portfolio companies.
$22,483,134
$7,304,772
November 2008, MCC and the Georgian Government signed a Compact amendment making up to $100 million of additional funds available to
the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and
Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered
into force on January 30, 2009.
Projects
Obligated
Objectives
Cumulative
expenditures
mstockstill on DSKH9S0YB1PROD with NOTICES
Country: Vanuatu
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Vanuatu
Transportation Infrastructure Project.
VerDate Mar<15>2010
16:52 Apr 05, 2011
$60,090,228
Jkt 223001
Facilitate transportation
to increase tourism
and business development.
PO 00000
Frm 00107
Fmt 4703
Measures
Total obligation: $65,690,000
Total Quarterly Expenditures1: $1,209,129
$59,601,565
Sfmt 4703
Traffic volume (average annual daily traffic)—
Efate: Ring Road.
Traffic Volume (average annual daily traffic)—
Santo: East Coast Road.
Kilometers of road upgraded—Efate: Ring Road.
Kilometers of roads upgraded—Santo: East
Coast Road.
Percent of contracted roads works disbursed
(USD disbursed): Total (Cumulative).
E:\FR\FM\06APN1.SGM
06APN1
19136
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
Projects
Cumulative
expenditures
Objectives
$5,599,772
$4,416,275
$19,948
Obligated
Cumulative
expenditures
Objectives
Country: Armenia
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Armenia
$152,709,208
Increase agricultural
productivity Improve
and Quality of Irrigation.
$94,721,567
Rural Road Rehabilitation Project.
$67,100,000
Better access to economic and social infrastructure.
$7,870,944
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
$15,840,792
$79
Obligated
Cumulative
expenditures
Objectives
Expand Access to Financial Services.
$6,227,768
Access to Justice
Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
$19,650,000
$34,250,521
Improved Ability of Justice System to Enforce Contracts and
Reconcile Claims.
$6,654,143
Jkt 223001
PO 00000
Frm 00108
Fmt 4703
Measures
Total obligation: $307,298,040
Total Quarterly Expenditures1: $37,758,677
Access to Financial
Services Project.
16:52 Apr 05, 2011
Training/technical assistance provided for OnFarm Water Management.
Training/technical assistance provided for PostHarvest Processing.
Loans Provided.
Percent of contracted works disbursed.
Value of signed contracts for irrigation works.
Number of farmers using better on-farm water
management.
Number of enterprises using improved techniques.
Value of irrigation feasibility and/or detailed design contracts signed.
Additional Land irrigated under project.
Percent of contracted irrigation feasibility and/or
design studies disbursed.
Average annual daily traffic on Pilot Roads.
International roughness index for Pilot Roads.
Road Sections Rehabilitated—Pilot Roads.
Pilot Roads: Percent of Works Completed.
$10,516,317
Country: Benin
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Benin
VerDate Mar<15>2010
Measures
Total obligation: $235,650,000
Total Quarterly Expenditures1: $17,769,018
Irrigated Agriculture
Project (Agriculture
and Water).
Projects
Measures
Sfmt 4703
Volume of credits granted by the Micro-Finance
Institutions (MFI).
Volume of saving collected by the Micro-Finance
Institutions.
Average portfolio at risk >90 days of microfinance institutions at the national level.
Operational self-sufficiency of MFIs at the national level.
Number of institutions receiving grants through
the Facility.
Number of MFIs inspected by CSSFD.
Average time to enforce a contract.
Percent of firms reporting confidence in the judicial system.
Passage of new legal codes.
Average time required for Tribunaux de premiere
instance—arbitration centers and courts of first
instance (TPI) to reach a final decision on a
case.
Average time required for Court of Appeals to
reach a final decision on a case.
Percent of cases resolved in TPI per year.
Percent of cases resolved in Court of Appeals
per year.
Number of Courthouses completed.
Average time required to register a business
´ ´
(societe).
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Access to Land Project
Cumulative
expenditures
Objectives
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
Projects
Strengthen property
rights and increase investment in rural and
urban land.
$18,760,887
$171,059,550
Access to Markets
Project.
$35,645,826
Improve Access to Markets through Improvements to the Port of
Cotonou.
$96,786,669
$46,692,143
mstockstill on DSKH9S0YB1PROD with NOTICES
16:52 Apr 05, 2011
Average time required to register a business
(sole proprietorship).
Total value of investment in targeted urban land
parcels.
Total value of investment in targeted rural land
parcels.
Average cost required to convert occupancy permit to land title through systematic process.
Share of respondents perceiving land security in
the PH–TF or PFR areas.
Number of preparatory studies completed.
Number of Legal and Regulatory Reforms Adopted.
Amount of Equipment Purchased.
Number of new land titles obtained by transformation of occupancy permit.
Number of land certificates issued within MCA—
Benin implementation.
Number of PFRs established with MCA Benin
implementation.
Number of permanent stations installed.
Number of stakeholders Trained.
Number of communes with new cadastres.
Number of operational land market information
systems.
Volume of merchandise traffic through the Port
Autonome de Cotonou.
Bulk ship carriers waiting times at the port.
Port design-build contract awarded.
Port crime levels (number of thefts).
Average time to clear customs.
Port meets—international port security standards
(ISPS).
$283,061
Cumulative
expenditures
Objectives
Country: Ghana
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Ghana
VerDate Mar<15>2010
Measures
$29,028,322
Obligated
Agriculture Project .........
19137
$212,597,378
Jkt 223001
Enhance Profitability of
cultivation, services to
agriculture and product handling in support of the expansion
of commercial agriculture among groups
of smallholder farms.
PO 00000
Frm 00109
Fmt 4703
Measures
Total obligation: $547,009,000
Total Quarterly Expenditures1: $53,662,034
$118,885,684
Sfmt 4703
Number of farmers trained in Commercial Agriculture.
Number of agribusinesses assisted.
Number of preparatory land studies completed.
Legal and Regulatory land reforms adopted.
Number of landholders reached by public outreach efforts.
Number of hectares under production.
Number of personnel trained.
Number of buildings rehabilitated/constructed.
Value of equipment purchased.
Feeder Roads International Roughness Index.
Feeder Roads Annualized Average Daily Traffic.
Value of signed contracts for feasibility and/or
design studies of Feeder Roads.
Percent of contracted design/feasibility studies
completed for Feeder Roads.
Value of signed works contracts for Feeder
Roads.
Percent of contracted Feeder Road works disbursed.
Value of loans disbursed to clients from agriculture loan fund.
Value of signed contracts for feasibility and/or
design studies (irrigation).
Percent of contracted (design/feasibility) studies
complete (irrigation).
E:\FR\FM\06APN1.SGM
06APN1
19138
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Rural Development
Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Transportation Project ...
VerDate Mar<15>2010
16:52 Apr 05, 2011
Obligated
Objectives
Cumulative
expenditures
$73,390,556
Strengthen the rural institutions that provide
services complementary to, and supportive
of, agricultural and
agriculture business
development.
$46,142,299
$216,235,347
Reduce the transportation costs affecting
agriculture commerce
at sub-regional levels.
$93,326,799
Jkt 223001
PO 00000
Frm 00110
Fmt 4703
Sfmt 4703
Measures
Value of signed contracts for irrigation works (irrigation).
Rural hectares mapped.
Percent of contracted irrigation works disbursed.
Percent of people aware of their land rights in
Pilot Land Registration Areas.
Total number of parcels surveyed in the Pilot
Land Registration Areas (PLRAs).
Volume of products passing through post-harvest
treatment.
Number of students enrolled in schools affected
by Education Facilities Sub-Activity.
Number of schools rehabilitated.
Number of basic school blocks constructed to
Ministry of Education (MOE) construction
standards.
Distance to collect water.
Time to collect water.
Incidence of guinea worm.
Average number of days lost due to guinea
worm.
Number of people affected by Water and Sanitation Facilities Sub-Activity.
Number of stand-alone boreholes/wells/nonconventional water systems constructed/rehabilitated.
Number of small-town water systems designed
and due diligence completed for construction.
Number of pipe extension projects designed and
due diligence completed for construction.
Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity.
Trunk Roads International roughness index.
N1 International Roughness Index.
N1 Annualized Average Daily Traffic.
N1 Kilometers of road upgraded.
Value of signed contracts for feasibility and/or
design studies of the N1.
Percent of contracted design/feasibility studies
completed of the N1.
Value of signed contracts for road works N1, Lot
1.
Value of signed contracts for road works N1, Lot
2.
Trunk Roads Annualized Average Daily Traffic.
Trunk Roads Kilometers of roads completed.
Percent of contracted design/feasibility studies
completed of Trunk Roads.
Percent of contracted Trunk Road works disbursed.
Ferry Activity: annualized average daily traffic
vehicles.
Ferry Activity: annual average daily traffic (passengers).
Landing stages rehabilitated.
Ferry terminal upgraded.
Rehabilitation of Akosombo Floating Dock completed.
Rehabilitation of landing stages completed.
Percent of contracted road works disbursed: N1,
Lot 2.
Percent of contracted road works disbursed: N1,
Lot 2.
Percent of contracted work disbursed: ferry and
floating dock.
Percent of contracted work disbursed: landings
and terminals.
Value of signed contracts for feasibility and/or
design studies of Trunk Roads.
Value of signed contracts for Trunk Roads.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Program Administration,2 Due Diligence,
Monitoring and Evaluation.
Pending subsequent reports 3.
Projects
Cumulative
expenditures
Objectives
$44,785,719
19139
Measures
$29,624,036
$341,182
Obligated
Cumulative
expenditures
Objectives
Country: El Salvador
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA El Salvador
Measures
Total obligation: $460,940,000
Total Quarterly Expenditures1: $27,896,592
Human Development
Project.
$101,753,001
Increase human and
physical capital of
residents of the Northern Zone to take advantage of employment and business
opportunities.
$39,303,357
Connectivity Project ......
$248,822,000
Reduce travel cost and
time within the Northern Zone, with the
rest of the country,
and within the region.
$99,760,888
Productive Development
Project.
Program Administration2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
$71,824,000
$36,985,024
$38,540,999
Employment rate of graduates of middle technical schools.
Graduation rates of middle technical schools.
Middle technical schools remodeled and
equipped.
Scholarships granted to students of middle technical schools.
Students of non-formal training.
Cost of water.
Time collecting water.
Households benefiting with water solutions built.
Potable water and basic sanitation systems with
construction contracts signed.
Cost of electricity.
Households benefiting with a connection to the
electricity network.
Household benefiting with the installation of isolated solar systems.
Kilometers of new electrical lines with construction contracts signed.
Population benefiting from strategic infrastructure.
Number of hectares under production with MCC
support.
Number of beneficiaries of technical assistance
and training—Agriculture.
Number of beneficiaries of technical assistance
and training—Agribusiness.
Value of Agricultural Loans to Farmers/Agribusiness.
Average annual daily traffic.
International roughness index.
Kilometers of roads rehabilitated.
$17,241,351
Kilometers of roads with Construction Initiated.
Projects
$0
Obligated
Cumulative
expenditures
Objectives
Country: Mali
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Mali
mstockstill on DSKH9S0YB1PROD with NOTICES
Bamako Senou Airport
Improvement Project.
$181,254,263
Measures
Total obligation: $460,811,164
Total Quarterly Expenditures1: $27,024,327
$35,384,813
Employment at airport.
Signature of design contract.
Average number of weekly flights (arrivals).
Passenger traffic (annual average).
Percent works complete.
Time required for passenger processing at departures and arrivals.
Percent works complete.
Percent of airport management and maintenance
plan implemented.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00111
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
19140
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Alatona Irrigation Project
Objectives
$234,884,675
Cumulative
expenditures
Increase the agricultural
production and productivity in the
Alatona zone of the
ON.
$113,956,663
Measures
Airport meets Federal Aviation Administration
(FAA) and International Civil Aviation Organization (ICAO) security standards.
Technical assistance delivered to project.
Main season rice yields.
International roughness index (IRI) on the NionoGoma Coura Route.
Average daily vehicle count.
Percentage works completed on Niono-Goma
Coura road.
Number of hectares of land irrigated in the
Alatona Canal.
Irrigation system efficiency on Alatona Canal
during the rainy season and the dry season.
Completion rate of work on the construction of
the main system (B03).
Percentage of contracted irrigation construction
works disbursed.
Number of titles registered in the land registration office of the Alatona zone.
Number market gardens allocated in Alatona
zones (for PAPs) (market garden parcels allotted to PAP women).
Decree transferring legal control of the project
impact area is passed.
Contractor implementing the ‘‘Mapping of Agricultural and Communal Land Parcels’’ contract
is mobilized.
Net school enrollment rate (in Alatona zone).
Percent of Alatona population with access to
drinking water.
Number of schools available in Alatona.
Number of health centers available in the
Alatona.
Number of affected people who have been compensate.
Resettlement Census verified.
Adoption of Rate of Extension Techniques.
Area planted with rice during the rainy season.
Area planted with shallots during dry season.
Number of farmers trained.
Water management system design and capacity
building strategy implemented.
Amount of credit extended to Alatona farmers.
Number of farmers accessing grant assistance
for first loan from financial institutions.
Financial institution partners identified (report on
assessment of the financial institutions in the
Office du Niger—Office of Niger zone (ON
zone).
Loan Portfolio quality of Alatona MFIs: portfolio
at risk.
Industrial Park Project ...
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
mstockstill on DSKH9S0YB1PROD with NOTICES
Projects
$2,643,432
$42,028,793
Terminated ....................
$2,637,472
$23,009,671
$595,909
Obligated
Objectives
Cumulative
expenditures
Country: Mongolia
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Mongolia
Property Rights Project
VerDate Mar<15>2010
16:52 Apr 05, 2011
$27,201,061
Jkt 223001
Increase security and
capitalization of land
assets held by lowerincome Mongolians,
and increased periurban herder productivity and incomes.
PO 00000
Frm 00112
Fmt 4703
Total obligation: $284,911,363
Total Quarterly Expenditures1: $8,665,430
$4,359,517
Sfmt 4703
Measures
Number of studies completed.
Legal and regulatory reforms adopted.
Number of landholders reached by public outreach efforts.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Vocational Education
Project.
Objectives
$47,355,638
Health Project ................
$38,974,817
Roads Project ................
Energy and Environmental Project.
Rail Project ....................
Program Administration 2
and Control, Monitoring and Evaluation.
Pending subsequent reports 3.
$79,750,000
$46,966,205
$369,560
$44,294,082
Cumulative
expenditures
Increase employment
and income among
unemployed and underemployed Mongolians.
$3,874,128
19141
Measures
Training to Leaseholders—Intensive and SemiIntensive Farming.
Number of Buildings rehabilitated/constructed.
Value of equipment purchased.
Rural hectares Mapped.
Urban Parcels Mapped.
Leaseholds Awarded.
Hashaa Plots Directly Registered by the Property
Rights Project.
Rate of employment of TVET Graduates.
Students completing newly designed long-term
programs.
$8,133,305
$8,434,083
$1,541,021
Increase the adoption of
behaviors that reduce
non-communicable
diseases (NCDIs)
among target populations and improved
medical treatment and
control of NCDIs.
TBD ...............................
TBD ...............................
Terminated ....................
Percent of active teachers receiving certification
training.
Technical and vocational education and training
(TVET) legislation passed.
Diabetes and hypertension controlled.
Percentage of cancer cases diagnosed in early
stages.
Road and traffic safety activity finalized and key
interventions developed.
TBD.
TBD.
$369,560
$11,896,484
Terminated.
$357,801
In late 2009, the MCC’s Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road
project.
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Mozambique
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Mozambique
Water Supply and Sanitation Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Road Rehabilitation
Project.
VerDate Mar<15>2010
16:52 Apr 05, 2011
$203,585,393
$176,307,480
Jkt 223001
Increase access to reliable and quality water
and sanitation facilities.
PO 00000
Frm 00113
Fmt 4703
Total obligation: $506,924,053
Total Quarterly Expenditures1: $4,595,841
$6,922,726
Increase access to productive resources and
markets.
$3,497,298
Sfmt 4703
Measures
Percent of urban population with improved water
sources.
Time to get to non-private water source.
Percent of urban population with improved sanitation facilities.
Percent of rural population with access to improved water sources.
Number of private household water connections
in urban areas.
Number of Rural water points constructed.
Number of standpipes in urban areas.
Final detailed design for 5 towns submitted.
Final detailed design for 3 cities submitted.
Kilometers of road rehabilitated.
´
Percent of Namialo—Rio Lurio Road—Metoro
feasibility, design, and supervision contract
disbursed.
Percent of Rio Ligonha-Nampula feasibility, design, and supervision contract disbursed.
Percent of Chimuara-Nicoadala feasibility, design, and supervision contract disbursed.
´
Percent of Namialo—Rio Lurio Road construction contract disbursed.
´
Percent of Rio Lurio—Metoro Road construction
contract disbursed.
E:\FR\FM\06APN1.SGM
06APN1
19142
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Land Tenure Project .....
Farmer Income Support
Project.
Objectives
$39,068,307
$18,400,117
Cumulative
expenditures
Establish efficient, secure land access for
households and investors.
$8,874,069
Improve coconut productivity and diversification into cash
crop.
$4,818,852
Measures
Percent of Rio Ligonha—Nampula Road construction contract disbursed.
Percent of Chimuara-Nicoadala Road construction contract disbursed.
Average annual daily traffic volume.
Average annual daily traffic volume.
Average annual daily traffic volume.
Average annual daily traffic volume.
Change in International Roughness Index (IRI)—
Namialo—Rio Lurio Road.
Change in International Roughness Index (IRI)—
on Rio Ligonha-Nampula Road.
Change in International Roughness Index (IRI)—
on Rio Lurio-Metoro Road.
Change in International Roughness Index (IRI)—
on Chimuara-Nicoadala Road.
Total number of officials and residents reached
with land strategy and policy awareness and
outreach messages.
Time to get land usage rights (DUAT), urban.
Time to get land usage rights (DUAT), rural.
Number of buildings rehabilitated or built.
Total value of procured equipment and materials.
Number of people trained.
Rural hectares mapped in Site Specific Activity.
Rural hectares mapped in Community Land
Fund Initiative.
Urban parcels mapped.
Rural hectares formalized through Site Specific
Activity.
Rural hectares formalized through Community
Land Fund Initiative.
Urban parcels formalized.
Number of communities delimited.
Number of households having land formalized,
rural.
Number of households having land formalized,
urban.
Number of diseased or dead palm trees cleared.
Number of coconut seedlings planted
Hectares under production.
Number of farmers trained in pest and disease
control.
Number of farmers trained in crop diversification
technologies.
Income from coconuts and coconut products (estates).
Income from coconuts and coconuts products
(households).
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
Projects
$69,562,756
$14,971,583
$641,587
Obligated
Objectives
Cumulative
expenditures
mstockstill on DSKH9S0YB1PROD with NOTICES
Country: Lesotho
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Lesotho
Water Project ................
$164,027,999
Improve the water supply for industrial and
domestic needs, and
enhance rural livelihoods through improved watershed
management.
Measures
Total Obligation: $362,551,000
Total Quarterly Expenditures1: $20,235,490
$20,665,287
School days lost due to water borne diseases.
Diarrhea notification at health centers.
Time saved due to access to water source.
Rural household (HH) provided with access to
improved water supply.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00114
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Health Project ................
Private Sector Development Project.
Objectives
$122,398,000
$36,470,318
Cumulative
expenditures
Increase access to lifeextending ART and
essential health services by providing a
sustainable delivery
platform.
$20,391,636
Stimulate investment by
improving access to
credit, reducing transaction costs and increasing the participation of women in the
economy.
$7,219,420
19143
Measures
Rural HH provided with access to improved ventilated latrines.
Rural population with knowledge of good hygiene principles.
Urban HH with access to potable water supply.
Number of enterprises connected to water network.
Households connected to improved water network.
Cubic meters of treated water from metolong
dam delivered through a conveyance system
to Water and Sewerage Authority (WASA).
Hydrological flows variability.
Reclaimed area.
People with HIV still alive 12 months after initiation of treatment.
TB notification (per 100,000 pop.).
Percentage of PLWA receiving ARV treatment
(by age & sex).
Deliveries conducted in the health centers.
Immunization coverage rate.
Average time (days) required to enforce a contract.
Value of commercial cases.
Cases referred to ADR that are successfully
completed.
Portfolio of loans.
Loan processing time.
Performing loans.
Electronic payments—salaries.
Electronic payments—pensions.
Debit/smart cards issued.
Mortgage bonds registered.
Value of registered mortgage bonds.
Clearing time—Country.
Clearing time—Maseru.
Time to complete transfer of land rights.
Land transactions recorded.
Land parcels regularized and registered.
People trained on gender equality and economic
rights.
ID cards issued.
Monetary cost of a lease transaction.
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
Projects
$39,654,682
$16,807,335
$7,597
Obligated
Objectives
Cumulative
expenditures
Country: Morocco
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Morocco
Total obligation: $697,500,000
Total Quarterly Expenditures1: $16,235,188
Fruit Tree Productivity
Project.
mstockstill on DSKH9S0YB1PROD with NOTICES
Measures
$300,896,445
Reduce volatility of agricultural production
and increase volume
of fruit agricultural
production.
$54,073,820
Small Scale Fisheries
Project.
$116,168,027
Improve quality of fish
moving through domestic channels and
assure the sustainable use of fishing resources.
$7,628,045
Number of farmers trained.
Number of agribusinesses assisted.
Number of hectares under production.
Value of agricultural production.
Landing sites and ports rehabilitated.
Mobile fish vendors using new equipments.
Fishing boats using new landing sites.
Average price of fish at auction markets.
Average price of fish at wholesale.
Average price of fish at ports.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
19144
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Artisan and Fez Medina
Project.
Objectives
$111,873,858
Enterprise Support
Project.
$33,850,000
Financial Services
Project.
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
$46,200,000
Projects
Cumulative
expenditures
Increase value added to
tourism and artisan
sectors.
$5,083,742
mstockstill on DSKH9S0YB1PROD with NOTICES
Construction and rehabilitation of Fez Medina
Sites.
Tourist receipts in Fez.
Training of potters.
Number of enterprises in pilot project receiving
coaching.
Value added per enterprise.
Survival rate after two years.
$19,458,039
$88,511,670
TBD.
$22,819,549
$50,964
Objectives
Cumulative
expenditures
Country: Tanzania
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Tanzania
Transport Sector Project
Average revenue of SME pottery workshops.
$5,957,147
Improved survival rate
of new SMEs and
INDH-funded income
generating activities;
increased revenue for
new SMEs and INDHfunded income generating activities.
TBD ...............................
Obligated
Energy Sector Project ...
Measures
$206,042,428
$368,847,429
Increase value added to
businesses.
Increase cash crop revenue and aggregate
visitor spending.
Measures
Total obligation: $698,136,001
Total Quarterly Expenditures1: $50,430,174
$38,537,389
$70,094,338
New power customers: Kigoma.
New power customers: Morogoro.
New power customers: Tanga.
New power customers: Mbeya.
New power customers: Iringa.
New power customers: Dodoma.
New power customers: Mwanza.
New power customers: Zanzibar.
Energy generation—Kigoma.
Transmission capacity: Kigoma.
Transmission capacity: Morogoro.
Transmission capacity: Tanga.
Transmission capacity: Mbeya.
Transmission capacity: Iringa.
Transmission capacity: Dodoma.
Transmission capacity: Mwanza.
Transmission capacity: Zanzibar.
Percentage disbursed for design and supervision
contract Consulting Engineer (CE) year 1
budgeted: Distribution Rehabilitation and extension activity.
Percentage disbursed for design and supervision
contract Consulting Engineer (CE) year 1
budgeted; Zanzibar Interconnector activity.
Percentage disbursed for design and supervision
contract Consulting Engineer (CE) year 1
budgeted; Malagarasi hydropower and Kigoma
distribution activity.
International
roughness
index:
Tunduma
Sumbawanga.
International roughness index: Tanga Horohoro.
International roughness index: Namtumbo
Songea.
International roughness index: Peramiho Mbinga.
Annual
average
daily
traffic:
Tunduma
Sumbawanga.
Annual average daily traffic: Tanga Horohoro.
Annual average daily traffic: Namtumbo Songea.
Annual average daily traffic: Peramiho Mbinga.
Kilometers
upgraded/completed:
Tunduma
Sumbawanga.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Water Sector Project .....
Objectives
$65,692,144
Cumulative
expenditures
Increase investment in
human and physical
capital and to reduce
the prevalence of
water-related disease.
$3,284,750
19145
Measures
Kilometers
upgraded/completed:
Tanga
Horohoro.
Kilometers
upgraded/completed:
Namtumbo
Songea.
Kilometers
upgraded/completed:
Peramiho
Mbinga.
Percent disbursed on construction works:
Tunduma Sumbawanga.
Percent disbursed on construction works: Tanga
Horohoro.
Percent disbursed on construction works:
Namtumbo Songea.
Percent disbursed on construction works:
Peramiho Mbinga.
Percent disbursed for feasibility and/or design
studies: Tunduma Sumbawanga.
Percent disbursed for feasibility and/or design
studies: Tanga Horohoro.
Percent disbursed for feasibility and/or design
studies: Namtumbo Songea.
Percent disbursed for feasibility and/or design
studies: Peramiho Mbinga.
International roughness index: Pemba.
Average annual daily traffic: Pemba.
Kilometers upgraded/completed: Pemba.
Percent disbursed on construction works:
Pemba.
Signed contracts for construction works (Zanzibar Rural Roads).
Percent disbursed on signed contracts for feasibility and/or design studies: Pemba.
Passenger arrivals: Mafia Island.
Percentage of upgrade complete: Mafia Island.
Percent disbursed on construction works: Mafia
Island.
Number of households using improved source
for drinking water (Dar es Salaam).
Number of households using improved source
for drinking water (Morogoro).
Number of businesses using improved water
source (Dar es Salaam).
Number of businesses using improved water
source (Morogoro).
Volume of water produced (Lower Ruvu).
Volume of water produced (Morogoro).
Percent disbursed on Feasibility Design Update
contract Lower Ruvu Plant Expansion.
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
Projects
$57,554,000
$15,382,170
$206,197
Obligated
Objectives
Cumulative
expenditures
Country: Burkina Faso
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Burkina Faso
mstockstill on DSKH9S0YB1PROD with NOTICES
Roads Project ................
$194,130,681
Rural Land Governance
Project.
$59,934,615
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
Enhance access to markets through investments in the road network.
Increase investment in
land and rural productivity through improved land tenure
security and land
management.
PO 00000
Frm 00117
Fmt 4703
Measures
Total obligation: $480,943,569
Total Quarterly Expenditures1: $4,817,464
$3,055,661
$6,348,245
Sfmt 4703
To Be Determined (TBD).
TBD.
E:\FR\FM\06APN1.SGM
06APN1
19146
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Objectives
Agriculture Development
Project.
$141,910,059
Bright II Schools Project
$28,829,669
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
Cumulative
expenditures
$56,138,545
Projects
Expand the productive
use of land in order to
increase the volume
and value of agricultural production in
project zones.
Increase primary school
completion rates.
$6,518,953
TBD.
$14,756,395
TBD.
$16,054,831
$12,034,926
Obligated
Objectives
Cumulative
expenditures
Country: Namibia
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Namibia
Education Project ..........
$144,976,557
Tourism Project .............
$66,959,292
Agriculture Project .........
$47,550,008
Program Administration 2
and Control, Monitoring and Evaluation.
Pending Subsequent
Report 3.
$44,991,959
Projects
Improve the education
sector’s effectiveness,
efficiency and quality.
Increase incomes and
create employment
opportunities by improving the marketing,
management and infrastructure of Etosha
National Park.
Sustainably improve the
economic performance and profitability
of the livestock sector
and increase the volume of the indigenous
natural products for
export.
Measures
Total obligation: $304,477,816
Total Quarterly Expenditures1: $7,083,896
$8,875,295
TBD.
$4,718,437
TBD.
$4,834,237
TBD.
$8,477,524
$3,189,460
Obligated
Objectives
Cumulative
expenditures
Country: Moldova
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Moldova
Road Rehabilitation
Project.
Transition to High Value
Agriculture Project.
Program Administration 2
and Monitoring and
Evaluation.
Measures
Measures
Total obligation: $262,000,000
Total Quarterly Expenditures1: ¥$55,865
$132,840,000
$94,350
To Be Determined (TBD).
$101,773,402
$0
TBD.
$27,386,598
$0
TBD.
The negative quarterly expenditure for Moldova is related to expense accruals. The accruals will be reversed in 2011 and applied to various
projects and activities.
mstockstill on DSKH9S0YB1PROD with NOTICES
Projects
Obligated
Objectives
Cumulative
expenditures
Country: Senegal
Year: 2011
Quarter 1
Entity to which the assistance is provided: MCA Moldova
Road Rehabilitation
Project.
Transition to High Value
Agriculture Project.
Program Administration 2
and Monitoring and
Evaluation.
VerDate Mar<15>2010
16:52 Apr 05, 2011
Measures
Total obligation: $540,000,000
Total Quarterly Expenditures1: $446,752
$324,712,499
$0
To Be Determined (TBD).
$170,008,860
$0
TBD.
$45,278,641
$1,353,733
TBD.
Jkt 223001
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 76, No. 66 / Wednesday, April 6, 2011 / Notices
Projects
Obligated
Cumulative
expenditures
Objectives
Pending Subsequent
Report 3.
19147
Measures
$46,835
1 Expenditures
are the sum of cash outlays and quarterly accruals for work completed but not yet paid or invoiced.
administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such
in subsequent quarterly report(s).
2 Program
3 These
619(b) Transfer or Allocation of Funds
U.S. Agency to which funds were transferred or allocated
Amount
USAID .......................................................................................
$0
[FR Doc. 2011–8104 Filed 4–5–11; 8:45 am]
BILLING CODE 9211–03–P
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[Notice (11–030)]
Aerospace Safety Advisory Panel;
Meeting.
National Aeronautics and
Space Administration (NASA).
ACTION: Notice of meeting.
AGENCY:
In accordance with the
Federal Advisory Committee Act, Public
Law 92–463, as amended, the National
Aeronautics and Space Administration
announce a forthcoming meeting of the
Aerospace Safety Advisory Panel.
DATES: Friday, April 29, 2011, from 11
p.m. to 1 p.m.
ADDRESSES: Kennedy Space Center
Visitor Complex, Astronaut Encounter
Theatre, SR 405, Kennedy Space Center,
FL 32899.
FOR FURTHER INFORMATION CONTACT: Ms.
Kathy Dakon, Aerospace Safety
Advisory Panel Executive Director,
National Aeronautics and Space
Administration, Washington, DC 20546,
(202) 358–0732.
SUPPLEMENTARY INFORMATION: The
Aerospace Safety Advisory Panel will
hold its 2nd Quarterly Meeting for 2011.
This discussion is pursuant to carrying
out its statutory duties for which the
Panel reviews, identifies, evaluates, and
advises on those program activities,
systems, procedures, and management
activities that can contribute to program
risk. Priority is given to those programs
that involve the safety of human flight.
The agenda will include Kennedy Space
Center Overview; Updates on Safety
Mission Assurance; Safety Metrics and
Commercial Space. The meeting will be
open to the public up to the seating
capacity of the room. Seating will be on
a first-come basis. Visitors will be
requested to sign a visitor’s register.
mstockstill on DSKH9S0YB1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:52 Apr 05, 2011
Jkt 223001
Description of program or project
Threshold Program.
Photographs will only be permitted
during the first 10 minutes of the
meeting. During the first 30 minutes of
the meeting, members of the public may
make a 5-minute verbal presentation to
the Panel on the subject of safety in
NASA. To do so, please contact Ms.
Susan Burch at susan.burch@nasa.gov
at least 48 hours in advance. Any
member of the public is permitted to file
a written statement with the Panel at the
time of the meeting. Verbal
presentations and written comments
should be limited to the subject of safety
in NASA.
March 30, 2011.
P. Diane Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2011–8059 Filed 4–5–11; 8:45 am]
BILLING CODE 7510–13–P
This meeting will be held on
April 6, 2011, from 8:30 a.m. to
4:30 p.m.
ADDRESSES: 700 Pennsylvania Avenue,
NW., Washington, DC 20408–0001.
FOR FURTHER INFORMATION CONTACT:
Charles Piercy, Acting Assistant
Archivist for the Office of Information
Services, National Archives and Records
Administration, 8601 Adelphi Road,
College Park, Maryland 20740, (301)
837–1583.
SUPPLEMENTARY INFORMATION:
DATES:
Agenda
(1) Opening Remarks
(2) ERA Status Updates
(3) Subcommittee Breakouts
(4) Adjournment
Dated: March 31, 2011.
Mary Ann Hadyka,
Committee Management Officer.
[FR Doc. 2011–8215 Filed 4–5–11; 8:45 am]
BILLING CODE 7515–01–P
NATIONAL ARCHIVES AND RECORDS
ADMINISTRATION
Advisory Committee on the Electronic
Records Archives (ACERA)
National Archives and Records
Administration.
ACTION: Notice of meeting change.
AGENCY:
In accordance with the
Federal Advisory Committee Act, as
amended (5 U.S.C. Appendix 2), the
National Archives and Records
Administration (NARA) announces an
agenda change for the Advisory
Committee on the Electronic Records
Archives (ACERA). The meeting has
been consolidated into one day. This
meeting will be open to the public.
However, due to space limitations and
access procedures, the name and
telephone number of individuals
planning to attend must be submitted to
the Electronic Records Archives
Program at era.program@nara.gov. This
meeting will be recorded for
transcription purposes.
SUMMARY:
PO 00000
Frm 00119
Fmt 4703
Sfmt 4703
NATIONAL SCIENCE FOUNDATION
Proposal Review Panel for Physics;
Notice of Meeting
In accordance with the Federal
Advisory Committee Act (Pub. L. 92–
463, as amended), the National Science
Foundation announces the following
meeting.
Name: LIGO Laboratory Annual
Review at Livingston Observatory for
Physics.
Date and Time: Monday, April 25,
2011; 8 a.m.–6:30 p.m.; Tuesday, April
26, 2011; 8 a.m.–5:30 p.m.; Wednesday,
April 27, 2011; 8:15 a.m.–11 a.m.
Place: LIGO site at Livingston,
Louisiana.
Type of Meeting: Partially Closed.
Contact Person: Thomas Carruthers,
Program Director, Division of Physics,
National Science Foundation, (703)
292–7373.
Purpose of Meeting: To provide an
evaluation of the project construction
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 76, Number 66 (Wednesday, April 6, 2011)]
[Notices]
[Pages 19131-19147]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-8104]
=======================================================================
-----------------------------------------------------------------------
MILLENNIUM CHALLENGE CORPORATION
[MCC FR 11-03]
Notice of Quarterly Report (October 1, 2010-December 31, 2010)
AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for
the quarter October 1, 2010 through December 31, 2010, on assistance
provided under section 605 of the Millennium Challenge Act of 2003 (22
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or
allocations of funds to other federal agencies under section 619(b) of
the Act. The following report will be made available to the public by
publication in the Federal Register and on the Internet Web site of the
MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act.
Dated: March 29, 2011.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge
Corporation.
Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Madagascar Year: 2011 Quarter 1 Total obligation: $87,998,166
Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures\1\: $12,976
----------------------------------------------------------------------------------------------------------------
Land Tenure Project............ $30,123,098 Increase Land $29,304,770 Area secured with land
Titling and certificates or
Security. titles in the Zones.
Legal and regulatory
reforms adopted.
Number of land
documents inventoried
in the Zones and
Antananarivo.
Number of land
documents restored in
the Zones and
Antananarivo.
Number of land
documents digitized
in the Zones and
Antananarivo.
Average time for Land
Services Offices to
issue a duplicate
copy of a title.
Average cost to a user
to obtain a duplicate
copy of a title from
the Land Services
Offices.
Number of land
certificates
delivered in the
Zones during the
period.
Number of new guichets
fonciers operating in
the Zones.
The 256 Plan Local
d'Occupation Foncier--
Local Plan of Land
Occupation (PLOFs)
are completed.
Financial Sector Reform Project $25,705,099 Increase $23,535,781 Volume of funds
Competition in processed annually by
the Financial the national payment
Sector. system.
Number of accountants
and financial experts
registered to become
CPA.
Number of Central Bank
branches capable of
accepting auction
tenders.
Outstanding value of
savings accounts from
CEM in the Zones.
Number of MFIs
participating in the
Refinancing and
Guarantee funds.
Maximum check clearing
delay.
Network equipment and
integrator.
Real time gross
settlement system
(RTGS).
Telecommunication
facilities.
Retail payment
clearing system.
Number of CEM branches
built in the Zones.
Number of savings
accounts from CEM in
the Zones.
Percent of Micro-
Finance Institution
(MFI) loans recorded
in the Central Bank
database.
[[Page 19132]]
Agricultural Business $13,687,987 Improve $13,582,534 Number of farmers
Investment Project. Agricultural receiving technical
Projection assistance.
Technologies and Number of marketing
Market Capacity contracts of ABC
in Rural Areas. clients.
Number of farmers
employing technical
assistance.
Value of refinancing
loans and guarantees
issued to
participating MFIs
(as a measure of
value of agricultural
and rural loans).
Number of
Mnist[egrave]re de
l'Agriculture, de
l'Elevage et de la
P[ecirc]che- Ministry
of Agriculture,
Livestock, and
Fishing (MAEP) agents
trained in marketing
and investment
promotion.
Number of people
receiving information
from Agricultural
Business Center
(ABCs) on business
opportunities.
Program Administration \2\ and $18,481,991 $17,802,882
Control, Monitoring and
Evaluation.
Pending subsequent reports \3\. $1,368,813
----------------------------------------------------------------------------------------------------------------
FY2010 Madagascar post-compact disbursement related to final payment of audit expenses.
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Honduras Year: 2011 Quarter 1 Total obligation: $205,000,000
Entity to which the assistance is provided: MCA Honduras Total Quarterly Expeditures\1\: $7,025,275
----------------------------------------------------------------------------------------------------------------
Rural Development Project...... $68,273,380 Increase the $68,197,673 Number of program
productivity and farmers harvesting
business skills high-value
of farmers who horticulture crops.
operate small Number of hectares
and medium-size harvesting high-value
farms and their horticulture crops.
employees. Number of business
plans prepared by
program farmers with
assistance from the
implementing entity.
Total value of net
sales.
Total number of
recruited farmers
receiving technical
assistance.
Value of loans
disbursed to farmers,
agribusiness, and
other producers and
vendors in the
horticulture
industry, including
Program Farmers,
cumulative to date,
Trust Fund Resources.
Number of loans
disbursed
(disaggregated by
trust fund, leveraged
from trust fund, and
institutions
receiving technical
assistance from ACDI-
VOCA).
Number of hectares
under irrigation.
Number of farmers
connected to the
community irrigation
system.
Transportation Project......... $120,591,240 Reduce $121,211,917 Freight shipment cost
transportation from Tegucigalpa to
costs between Puerto Cortes.
targeted Average annual daily
production traffic volume--CA-5.
centers and International
national, roughness index
regional and (IRI)--CA-5.
global markets. Kilometers of road
upgraded--CA-5.
Percent of contracted
road works disbursed--
CA-5.
Average annual daily
traffic volume--
secondary roads.
International
roughness index
(IRI)--secondary
roads
Kilometers of road
upgraded--secondary
roads.
Average annual daily
traffic volume--rural
roads.
Average speed--Cost
per journey (rural
roads)
Kilometers of road
upgraded--rural
roads.
Percent disbursed for
contracted studies.
Value of signed
contracts for
feasibility, design,
supervision and
program mgmt
contracts.
Kilometers (km) of
roads under design.
[[Page 19133]]
Number of Construction
works and supervision
contracts signed.
Kilometers (km) of
roads under works
contracts.
Program Administration,\2\ and $16,135,380 $15,081,707
Control, Monitoring and
Evaluation.
Pending subsequent reports \3\. $0
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Cape Verde Year: 2011 Quarter 1 Total obligation: $110,078,488
Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Expenditures\1\: $2,055,100
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural $12,031,549 Increase $11,264,926 Productivity:
Support Project. agricultural Horticulture, Paul
production in watershed.
three targeted Productivity:
watershed areas Horticulture, Faja
on three islands. watershed.
Productivity:
Horticulture,
Mosteiros watershed.
Number of farmers
adopting drip
irrigation: All
intervention
watersheds (Paul,
Faja and Mosteiros)
(incremental).
Area irrigated with
drip irrigation: All
intervention
watersheds (Paul,
Faja and Mosteiros)
(incremental).
Irrigation Works:
Percent contracted
works disbursed. All
intervention
watersheds (Paul,
Faja and Mosteiros)
(incremental).
Number of reservoirs
constructed in all
intervention
watersheds (Paul,
Faja and Mosteiros)
(incremental).
Number of farmers that
have completed
training in at least
3 of 5 core
agricultural
disciplines: All
intervention
watersheds (Paul,
Faja and Mosteiros)
(incremental).
Infrastructure Improvement $82,630,208 Increase $78,967,304 Travel time ratio:
Project. integration of percentage of
the internal beneficiary
market and population further
reduce than 30 minutes from
transportation nearest market.
costs. Kilometers of roads
rehabilitated.
Percent of contracted
Santiago Roads works
disbursed
(cumulative).
Percent of contracted
Santo Antao Bridge
works disbursed
(cumulative).
Port of Praia: percent
of contracted port
works disbursed
(cumulative).
Cargo village: percent
of contracted works
disbursed
(cumulative).
Quay 2 improvements:
percent of contracted
works disbursed
(cumulative).
Access road: percent
of contracted works
disbursed
(cumulative).
Private Sector Development $1,931,223 Spur private $1,595,002 MFI portfolio at risk,
Project. sector adjusted (level).
development on
all islands
through
increased
investment in
the priority
sectors and
through
financial sector
reform.
Program Administration,\2\ and $13,485,508 $12,509,672
Control, Monitoring and
Evaluation.
Pending subsequent reports \3\. $516,776
----------------------------------------------------------------------------------------------------------------
[[Page 19134]]
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Nicaragua Year: 2011 Quarter 1 Total obligation: $113,478,345
Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Expenditures\1\: $ 1,561,680
----------------------------------------------------------------------------------------------------------------
Property Regularization Project $7,180,454 Increase $6,289,228 Automated database of
Investment by registry and cadastre
strengthening installed in the 10
property rights. municipalities of
Leon.
Value of land, urban.
Value of land, rural.
Time to conduct a land
transaction.
Number of additional
parcels with a
registered title,
urban.
Number of additional
parcels with a
registered title,
rural.
Area covered by
cadastral mapping.
Cost to conduct a land
transaction.
Transportation Project......... $58,000,000 Reduce $54,867,252 Annual Average daily
transportation traffic volume: N1
costs between Section R1.
Leon and Annual Average daily
Chinandega and traffic volume: N1
national, Section R2.
regional and Annual Average daily
global markets. traffic volume: Port
Sandino (S13).
Annual Average daily
traffic volume:
Villanueva--Guasaule
Annual.
Average daily traffic
volume: Somotillo-
Cinco Pinos (S1).
Annual average daily
traffic volume:
Le[oacute]n-Poneloya-
Las Pe[ntilde]itas.
International
Roughness Index: N-I
Section R1.
International
Roughness Index: N-I
Section R2.
International
Roughness Index: Port
Sandino (S13).
International
roughness index:
Villanueva--Guasaule.
International
roughness index:
Somotillo-Cinco
Pinos.
International
roughness index:
Le[oacute]n-Poneloya-
Las Pe[ntilde]itas.
Kilometers of NI
upgraded: R1 and R2
and S13.
Kilometers of NI
upgraded: Villanueva--
Guasaule.
Kilometers of S1 road
upgraded.
Kilometers of S9 road
upgraded.
Rural Development Project...... $32,875,845 Increase the $30,603,852 Number of
value added of beneficiaries with
farms and business plans.
enterprises in Numbers of manzanas (1
the region. Manzana = 1.7
hectares), by sector,
harvesting higher-
value crops.
Number of
beneficiaries with
business plans
prepared with
assistance of Rural
Business Development
Project.
Number of
beneficiaries
implementing Forestry
business plans under
Improvement of Water
Supplies Activity.
Number of Manzanas
reforested.
Number of Manzanas
with trees planted.
Program Administration,\2\ Due $15,422,046 $14,172,209
Diligence, Monitoring and
Evaluation.
Pending subsequent reports \3\. $1,496,404
----------------------------------------------------------------------------------------------------------------
[[Page 19135]]
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Georgia Year: 2011 Quarter 1 Total obligation: $395,300,000
Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures\1\: $20,153,289
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure $313,250,000 Key Regional $266,179,261 Household savings from
Rehabilitation Project. Infrastructure Infrastructure
Rehabilitated. Rehabilitation
Activities.
Savings in vehicle
operating costs
(VOC).
International
roughness index
(IRI).
Annual average daily
traffic (AADT).
Travel Time.
Road paved/completed.
Construction Works
completed (Contract
1).
Construction Works
completed (Contract
2).
Signed contracts for
feasibility and/or
design studies.
Percent of contracted
studies disbursed.
Kilometers of roads
under design.
Signed contracts for
road works.
Kilometers of roads
under works
contracts.
Sites rehabilitated
(phases I, II, III)--
pipeline.
Construction works
completed (phase II)--
pipeline.
Savings in household
expenditures for all
RID subprojects.
Population Served by
all RID subprojects.
RID Subprojects
completed.
Value of RID Grant
Agreements signed.
Value of project works
and goods contracts
Signed.
RID subprojects with
works initiated.
Regional Enterprise Development $52,530,800 Enterprises in $45,474,493 Jobs Created by
Project. Regions Agribusiness
Developed. Development Activity
(ADA) and by Georgia
Regional Development
Fund (GRDF).
Household net income--
ADA and GRDF.
Jobs created--ADA.
Firm income--ADA.
Household net income--
ADA.
Beneficiaries (direct
and indirect)--ADA.
Grant agreements
signed--ADA.
Increase in gross
revenues of portfolio
companies (PC).
Increase in portfolio
company employees.
Increase in wages paid
to the portfolio
company employees.
Portfolio companies
(PC).
Funds disbursed to the
portfolio companies.
Program Administration,\2\ Due $29,519,200 $22,483,134
Diligence, Monitoring and
Evaluation.
Pending subsequent reports \3\. $7,304,772
----------------------------------------------------------------------------------------------------------------
November 2008, MCC and the Georgian Government signed a Compact amendment making up to $100 million of
additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works
in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the
original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30,
2009.
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Vanuatu Year: 2011 Quarter 1 Total obligation: $65,690,000
Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Expenditures\1\: $1,209,129
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure $60,090,228 Facilitate $59,601,565 Traffic volume
Project. transportation (average annual daily
to increase traffic)--Efate: Ring
tourism and Road.
business Traffic Volume
development. (average annual daily
traffic)--Santo: East
Coast Road.
Kilometers of road
upgraded--Efate: Ring
Road.
Kilometers of roads
upgraded--Santo: East
Coast Road.
Percent of contracted
roads works disbursed
(USD disbursed):
Total (Cumulative).
[[Page 19136]]
Program Administration,\2\ Due $5,599,772 $4,416,275
Diligence, Monitoring and
Evaluation.
Pending subsequent reports \3\. $19,948
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives expenditures Measures
----------------------------------------------------------------------------------------------------------------
Country: Armenia Year: 2011 Quarter 1 Total obligation: $235,650,000
Entity to which the assistance is provided: MCA Armenia Total Quarterly Expenditures\1\: $17,769,018
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project $152,709,208 Increase $94,721,567 Training/technical
(Agriculture and Water). agricultural assistance provided
productivity for On-Farm Water
Improve and Management.
Quality of Training/technical
Irrigation. assistance provided
for Post-Harvest
Processing.
Loans Provided.
Percent of contracted
works disbursed.
Value of signed
contracts for
irrigation works.
Number of farmers
using better on-farm
water management.
Number of enterprises
using improved
techniques.
Value of irrigation
feasibility and/or
detailed design
contracts signed.
Additional Land
irrigated under
project.
Percent of contracted
irrigation
feasibility and/or
design studies
disbursed.
Rural Road Rehabilitation $67,100,000 Better access to $7,870,944 Average annual daily
Project. economic and traffic on Pilot
social Roads.
infrastructure. International
roughness index for
Pilot Roads.
Road Sections
Rehabilitated--Pilot
Roads.
Pilot Roads: Percent
of Works Completed.
Program Administration,\2\ Due $15,840,792 $10,516,317
Diligence, Monitoring and
Evaluation.
Pending subsequent reports \3\.