Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 18745-18746 [2011-7992]

Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 76, No. 65 / Tuesday, April 5, 2011 / Notices a. Application Type: Non-project use of project lands and waters b. Project No.: 2232–588 c. Date Filed: November 3, 2010 d. Applicant: Duke Energy Carolinas, LLC e. Name of Project: Catawba-Wateree Hydroelectric Project f. Location: The proposed non-project use would be located on Lake Wateree in Fairfield County, South Carolina. g. Filed Pursuant to: Federal Power Act, 16 USC 791a–825r h. Applicant Contact: Kevin K. Reagan, Manager, Lake Services, P.O. Box 1006, Charlotte, NC 28201–1006; telephone (704) 382–9386. i. FERC Contact: Jade Alvey: (202) 502–6864; e-mail: Jade.Alvey@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 17, 2011. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–2232–588) on any comments, motions, or recommendations filed. k. Description of Request: The licensee is requesting authorization to permit James Rion to lease 3.61 acres of project lands for a commercial marina (Sutton’s Landing) consisting of eight cluster docks with a total of ninety-six boat slips. The proposed marina would impact a total of approximately 700 linear feet of shoreline within the project boundary. The slips would include downward-illuminating pedestal lights. The licensee is also requesting a change in the classification of the shoreline area from ‘‘Existing Residential Marina’’ to ‘‘True Public Marina.’’ l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ VerDate Mar<15>2010 15:18 Apr 04, 2011 Jkt 223001 link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 18745 other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 17, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7982 Filed 4–4–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2210–207] Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Updated shoreline management plan b. Project No: 2210–207 c. Date Filed: January 3, 2011, supplemented on February 18, 2011 d. Applicant: Appalachian Power Company e. Name of Project: Smith Mountain Pumped Storage Project f. Location: Headwaters of the Roanoke River, in Bedford, Campbell, Franklin, and Pittsylvania Counties, Virginia g. Filed Pursuant to: Federal Power Act, 16 USC 791a—825r h. Applicant Contact: Elizabeth Parcell, Appalachian Power Company, 996 Old Franklin Turnpike, Rocky Mount, VA, 24151 i. FERC Contact: Mark Carter, telephone (678) 245–3083, e-mail mark.carter@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 15, 2011 All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, E:\FR\FM\05APN1.SGM 05APN1 srobinson on DSKHWCL6B1PROD with NOTICES 18746 Federal Register / Vol. 76, No. 65 / Tuesday, April 5, 2011 / Notices using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–2210–207) on any comments or motions filed. k. Description of Application: Appalachian Power Company (licensee) filed an updated shoreline management plan (SMP) for Smith Mountain Lake and Leesville Lake, the two project reservoirs. The licensee developed the proposed SMP pursuant to the project license. The proposed SMP strives to balance environmental and recreational resources with local economic interests, and includes provisions for shoreline use classifications, shoreline and lake use regulations, a permitting program, and cooperation with appropriate government agencies and stakeholders. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–2210) to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title VerDate Mar<15>2010 15:18 Apr 04, 2011 Jkt 223001 ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 17, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7992 Filed 4–4–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 459–299] Union Electric Company, dba AmerenUE; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No: 459–299. c. Date Filed: June 24, 2010. d. Applicant: Union Electric Company, dba AmerenUE. e. Name of Project: Osage Hydroelectric Project. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 f. Location: The proposed non-project use would be located near mile marker 19.5 of the Osage River channel on the Lake of the Ozarks, in Camden County, Missouri. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Jeff Green, Shoreline Supervisor, AmerenUE, P.O. Box 993, Lake Ozark, MO 65049, (573) 365–9214. i. FERC Contact: Any questions on this notice should be addressed to Shana High at (202) 502–8674, or shana.high@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 29, 2011. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–459–299) on any comments, motions, or recommendations filed. k. Description of Request: The licensee requests Commission authorization to permit, after-the-fact, Kelly’s Port Marina’s use and maintenance of four commercial docks at their existing location and in their current configuration. Two of the docks have been on the lake over twenty years, and were permitted by AmerenUE before the current license requirements. The other docks were installed and/or modified without the proper review or permits. The marina accommodates 94 boats and 20 personal watercraft. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via e- E:\FR\FM\05APN1.SGM 05APN1

Agencies

[Federal Register Volume 76, Number 65 (Tuesday, April 5, 2011)]
[Notices]
[Pages 18745-18746]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7992]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2210-207]


Appalachian Power Company; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Updated shoreline management plan
    b. Project No: 2210-207
    c. Date Filed: January 3, 2011, supplemented on February 18, 2011
    d. Applicant: Appalachian Power Company
    e. Name of Project: Smith Mountain Pumped Storage Project
    f. Location: Headwaters of the Roanoke River, in Bedford, Campbell, 
Franklin, and Pittsylvania Counties, Virginia
    g. Filed Pursuant to: Federal Power Act, 16 USC 791a--825r
    h. Applicant Contact: Elizabeth Parcell, Appalachian Power Company, 
996 Old Franklin Turnpike, Rocky Mount, VA, 24151
    i. FERC Contact: Mark Carter, telephone (678) 245-3083, e-mail 
mark.carter@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: April 15, 2011
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration,

[[Page 18746]]

using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. Please include the project number (P-2210-207) on 
any comments or motions filed.
    k. Description of Application: Appalachian Power Company (licensee) 
filed an updated shoreline management plan (SMP) for Smith Mountain 
Lake and Leesville Lake, the two project reservoirs. The licensee 
developed the proposed SMP pursuant to the project license. The 
proposed SMP strives to balance environmental and recreational 
resources with local economic interests, and includes provisions for 
shoreline use classifications, shoreline and lake use regulations, a 
permitting program, and cooperation with appropriate government 
agencies and stakeholders.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-2210) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment application. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: March 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7992 Filed 4-4-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.