Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 18745-18746 [2011-7992]
Download as PDF
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 76, No. 65 / Tuesday, April 5, 2011 / Notices
a. Application Type: Non-project use
of project lands and waters
b. Project No.: 2232–588
c. Date Filed: November 3, 2010
d. Applicant: Duke Energy Carolinas,
LLC
e. Name of Project: Catawba-Wateree
Hydroelectric Project
f. Location: The proposed non-project
use would be located on Lake Wateree
in Fairfield County, South Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791a–825r
h. Applicant Contact: Kevin K.
Reagan, Manager, Lake Services, P.O.
Box 1006, Charlotte, NC 28201–1006;
telephone (704) 382–9386.
i. FERC Contact: Jade Alvey: (202)
502–6864; e-mail: Jade.Alvey@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
17, 2011.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2232–588) on any
comments, motions, or
recommendations filed.
k. Description of Request: The
licensee is requesting authorization to
permit James Rion to lease 3.61 acres of
project lands for a commercial marina
(Sutton’s Landing) consisting of eight
cluster docks with a total of ninety-six
boat slips. The proposed marina would
impact a total of approximately 700
linear feet of shoreline within the
project boundary. The slips would
include downward-illuminating
pedestal lights. The licensee is also
requesting a change in the classification
of the shoreline area from ‘‘Existing
Residential Marina’’ to ‘‘True Public
Marina.’’
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
VerDate Mar<15>2010
15:18 Apr 04, 2011
Jkt 223001
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
18745
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–7982 Filed 4–4–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2210–207]
Appalachian Power Company; Notice
of Application for Amendment of
License and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Updated
shoreline management plan
b. Project No: 2210–207
c. Date Filed: January 3, 2011,
supplemented on February 18, 2011
d. Applicant: Appalachian Power
Company
e. Name of Project: Smith Mountain
Pumped Storage Project
f. Location: Headwaters of the
Roanoke River, in Bedford, Campbell,
Franklin, and Pittsylvania Counties,
Virginia
g. Filed Pursuant to: Federal Power
Act, 16 USC 791a—825r
h. Applicant Contact: Elizabeth
Parcell, Appalachian Power Company,
996 Old Franklin Turnpike, Rocky
Mount, VA, 24151
i. FERC Contact: Mark Carter,
telephone (678) 245–3083, e-mail
mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
15, 2011
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
E:\FR\FM\05APN1.SGM
05APN1
srobinson on DSKHWCL6B1PROD with NOTICES
18746
Federal Register / Vol. 76, No. 65 / Tuesday, April 5, 2011 / Notices
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2210–207) on any
comments or motions filed.
k. Description of Application:
Appalachian Power Company (licensee)
filed an updated shoreline management
plan (SMP) for Smith Mountain Lake
and Leesville Lake, the two project
reservoirs. The licensee developed the
proposed SMP pursuant to the project
license. The proposed SMP strives to
balance environmental and recreational
resources with local economic interests,
and includes provisions for shoreline
use classifications, shoreline and lake
use regulations, a permitting program,
and cooperation with appropriate
government agencies and stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field (P–2210) to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
VerDate Mar<15>2010
15:18 Apr 04, 2011
Jkt 223001
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–7992 Filed 4–4–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 459–299]
Union Electric Company, dba
AmerenUE; Notice of Application for
Amendment of License and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 459–299.
c. Date Filed: June 24, 2010.
d. Applicant: Union Electric
Company, dba AmerenUE.
e. Name of Project: Osage
Hydroelectric Project.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
f. Location: The proposed non-project
use would be located near mile marker
19.5 of the Osage River channel on the
Lake of the Ozarks, in Camden County,
Missouri.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Jeff Green,
Shoreline Supervisor, AmerenUE, P.O.
Box 993, Lake Ozark, MO 65049, (573)
365–9214.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8674, or
shana.high@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
29, 2011.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–459–299) on any
comments, motions, or
recommendations filed.
k. Description of Request: The
licensee requests Commission
authorization to permit, after-the-fact,
Kelly’s Port Marina’s use and
maintenance of four commercial docks
at their existing location and in their
current configuration. Two of the docks
have been on the lake over twenty years,
and were permitted by AmerenUE
before the current license requirements.
The other docks were installed and/or
modified without the proper review or
permits. The marina accommodates 94
boats and 20 personal watercraft.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 76, Number 65 (Tuesday, April 5, 2011)]
[Notices]
[Pages 18745-18746]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7992]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2210-207]
Appalachian Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Updated shoreline management plan
b. Project No: 2210-207
c. Date Filed: January 3, 2011, supplemented on February 18, 2011
d. Applicant: Appalachian Power Company
e. Name of Project: Smith Mountain Pumped Storage Project
f. Location: Headwaters of the Roanoke River, in Bedford, Campbell,
Franklin, and Pittsylvania Counties, Virginia
g. Filed Pursuant to: Federal Power Act, 16 USC 791a--825r
h. Applicant Contact: Elizabeth Parcell, Appalachian Power Company,
996 Old Franklin Turnpike, Rocky Mount, VA, 24151
i. FERC Contact: Mark Carter, telephone (678) 245-3083, e-mail
mark.carter@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: April 15, 2011
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration,
[[Page 18746]]
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. Please include the project number (P-2210-207) on
any comments or motions filed.
k. Description of Application: Appalachian Power Company (licensee)
filed an updated shoreline management plan (SMP) for Smith Mountain
Lake and Leesville Lake, the two project reservoirs. The licensee
developed the proposed SMP pursuant to the project license. The
proposed SMP strives to balance environmental and recreational
resources with local economic interests, and includes provisions for
shoreline use classifications, shoreline and lake use regulations, a
permitting program, and cooperation with appropriate government
agencies and stakeholders.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-2210) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7992 Filed 4-4-11; 8:45 am]
BILLING CODE 6717-01-P