Notice Announcing Filing Priority for Preliminary Permit Applications, 18545 [2011-7860]
Download as PDF
Emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices
Description: Quarterly Land
Acquisition Report of CalPeak Power
LLC.
Filed Date: 03/24/2011.
Accession Number: 20110324–5028.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 14, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
VerDate Mar<15>2010
18:47 Apr 01, 2011
Jkt 223001
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 28, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–7851 Filed 4–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
Lock+ Hydro Friends Fund
XXXIV ......................................
FFP Missouri 5, LLC ..................
Solia 2 Hydroelectric, LLC ..........
13742–000
13757–000
13764–000
On March 24, 2011, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
Project No.
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
Lock+ Hydro Friends Fund XLII
FFP Missouri 10, LLC ................
Solia 7 Hydroelectric, LLC ..........
18545
13739–000
13751–000
13778–000
1. FFP Missouri 5, LLC ..............
2. Solia 2 Hydroelectric, LLC .....
3. Lock+ Hydro Friends Fund
XXXIV ......................................
13757–000
13764–000
13742–000
Dated: March 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–7858 Filed 4–1–11; 8:45 am]
BILLING CODE 6717–01–P
On March 24, 2011, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
Project No.
1. Lock+ Hydro Friends Fund
XLII ..........................................
2. FFP Missouri 10, LLC ............
3. Solia 7 Hydroelectric, LLC .....
13739–000
13751–000
13778–000
Dated: March 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–7860 Filed 4–1–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
Lock+ Hydro Friends Fund
XXXVIII ....................................
FFP Missouri 12, LLC ................
Allegheny 2 Hydro, LLC .............
Three Rivers Hydro LLC ............
13744–000
13755–000
13774–000
13780–000
On March 24, 2011, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 76, Number 64 (Monday, April 4, 2011)]
[Notices]
[Page 18545]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7860]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Filing Priority for Preliminary Permit
Applications
------------------------------------------------------------------------
Project
No.
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XLII............................... 13739-000
FFP Missouri 10, LLC........................................ 13751-000
Solia 7 Hydroelectric, LLC.................................. 13778-000
------------------------------------------------------------------------
On March 24, 2011, the Commission held a drawing to determine
priority among competing preliminary permit applications with identical
filing times. In the event that the Commission concludes that none of
the applicants' plans are better adapted than the others to develop,
conserve, and utilize in the public interest the water resources of the
region at issue, the priority established by this drawing will serve as
the tiebreaker. Based on the drawing, the order of priority is as
follows:
------------------------------------------------------------------------
Project
No.
------------------------------------------------------------------------
1. Lock+ Hydro Friends Fund XLII............................ 13739-000
2. FFP Missouri 10, LLC..................................... 13751-000
3. Solia 7 Hydroelectric, LLC............................... 13778-000
------------------------------------------------------------------------
Dated: March 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-7860 Filed 4-1-11; 8:45 am]