Download as PDF Emcdonald on DSK2BSOYB1PROD with NOTICES Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices Description: Quarterly Land Acquisition Report of CalPeak Power LLC. Filed Date: 03/24/2011. Accession Number: 20110324–5028. Comment Date: 5 p.m. Eastern Time on Thursday, April 14, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, VerDate Mar<15>2010 18:47 Apr 01, 2011 Jkt 223001 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 28, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–7851 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XXXIV ...................................... FFP Missouri 5, LLC .................. Solia 2 Hydroelectric, LLC .......... 13742–000 13757–000 13764–000 On March 24, 2011, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: Project No. Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XLII FFP Missouri 10, LLC ................ Solia 7 Hydroelectric, LLC .......... 18545 13739–000 13751–000 13778–000 1. FFP Missouri 5, LLC .............. 2. Solia 2 Hydroelectric, LLC ..... 3. Lock+ Hydro Friends Fund XXXIV ...................................... 13757–000 13764–000 13742–000 Dated: March 25, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–7858 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P On March 24, 2011, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: Project No. 1. Lock+ Hydro Friends Fund XLII .......................................... 2. FFP Missouri 10, LLC ............ 3. Solia 7 Hydroelectric, LLC ..... 13739–000 13751–000 13778–000 Dated: March 25, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–7860 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XXXVIII .................................... FFP Missouri 12, LLC ................ Allegheny 2 Hydro, LLC ............. Three Rivers Hydro LLC ............ 13744–000 13755–000 13774–000 13780–000 On March 24, 2011, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 76, Number 64 (Monday, April 4, 2011)]
[Notices]
[Page 18545]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7858]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Announcing Filing Priority for Preliminary Permit 
Applications

------------------------------------------------------------------------
                                                                Project
                                                                  No.
------------------------------------------------------------------------
Lock+ Hydro Friends Fund XXXIV..............................   13742-000
FFP Missouri 5, LLC.........................................   13757-000
Solia 2 Hydroelectric, LLC..................................   13764-000
------------------------------------------------------------------------

    On March 24, 2011, the Commission held a drawing to determine 
priority among competing preliminary permit applications with identical 
filing times. In the event that the Commission concludes that none of 
the applicants' plans are better adapted than the others to develop, 
conserve, and utilize in the public interest the water resources of the 
region at issue, the priority established by this drawing will serve as 
the tiebreaker. Based on the drawing, the order of priority is as 
follows:

------------------------------------------------------------------------
                                                                Project
                                                                  No.
------------------------------------------------------------------------
1. FFP Missouri 5, LLC......................................   13757-000
2. Solia 2 Hydroelectric, LLC...............................   13764-000
3. Lock+ Hydro Friends Fund XXXIV...........................   13742-000
------------------------------------------------------------------------


    Dated: March 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-7858 Filed 4-1-11; 8:45 am]
BILLING CODE 6717-01-P