Copper Valley Electric Association; Notice of Scoping Document 2 and Soliciting Scoping Comments for an Oirginal Application for License, 18542 [2011-7780]

Download as PDF 18542 Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: March 28, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7779 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124–002] Emcdonald on DSK2BSOYB1PROD with NOTICES Copper Valley Electric Association; Notice of Scoping Document 2 and Soliciting Scoping Comments for an Oirginal Application for License a. Type of Application: Original License Application. b. Project No.: 13124–002. c. Applicant: Copper Valley Electric Association (Copper Valley) d. Name of Project: Allison Creek Project. e. Location: On the south side of Port Valdez, on the shore opposite from the community of Valdez, Alaska, near the Alyeska Marine Terminal and the terminus of the Trans Alaska Pipeline System (TAPS) in Township 9 South, Range 6 West, Seward Meridian, Alaska. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley Electric Association, P.O. Box 45, Mile 187 Glenn Highway, Glennallen, Alaska 99588, 907–822–3211, allisonlake@cvea.org. h. FERC Contact: Kim A. Nguyen, phone (202) 502–6105; e-mail at kim.nguyen@ferc.gov. i. Deadline for filing scoping comments: April 27, 2011. All VerDate Mar<15>2010 18:47 Apr 01, 2011 Jkt 223001 documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–13124–002) on any comments filed. j. The proposed project would consist of: (1) A 100-foot by 10-foot diversion structure on Allison Creek; (2) a 7,600foot-long, 42-inch-diameter buried/ above-ground steel pipeline; (3) a 40foot by 40-foot powerhouse; (4) two 6,500 kilowatt Pelton turbines; (5) a 150foot-long tailrace; (6) a switchyard; (7) 3.8-mile-long, 34.5 kilovolt transmission line; and (8) appurtenant facilities. k. On April 7, 2010, Copper Valley filed a Notice of Intent (NOI) to file an application for an original license and requested to use the Commission’s Alternative Licensing Process (ALP, which was granted on June 7, 2010. On April 13, 2010, Copper Valley filed a Pre-Application Document (PAD) including a Preliminary Draft Environmental Assessment (PDEA) for the project. Since the filing of the PAD and PDEA, Copper Valley has proposed changes to the project design and has filed a Scoping Document 2 (SD2) describing these modifications and changes to the proposed project. Therefore, we are noticing SD2 and soliciting comments on this new proposal. Under the ALP, Copper Valley plans to file a draft License Application for review and comments in early May 2011, with the final License Application to follow by August 31, 2011. l. SD2 is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address above. Dated: March 28, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7780 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC11–55–000 Applicants: DIRECT ENERGY SERVICES LLC, Gateway Energy Services Corporation, Direct Energy (GW), Inc. Description: Gateway Energy Services Corporation, et al. Joint Application For Authorization of Transaction Under section 203 of the Federal Power Act, and Request for Expedited Consideration. Filed Date: 03/25/2011 Accession Number: 20110325–5156 Comment Date: 5 p.m. Eastern Time on Friday, April 15, 2011 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG11–71–000 Applicants: Summit Texas Clean Energy, LLC Description: Self-Certification of EWG Status of Summit Texas Clean Energy, LLC. Filed Date: 03/24/2011 Accession Number: 20110324–5027 Comment Date: 5 p.m. Eastern Time on Thursday, April 14, 2011 Docket Numbers: EG11–72–000 Applicants: White Stallion Energy Center, LLC Description: Self-Certification of EG or FC of White Stallion Energy Center, LLC. Filed Date: 03/25/2011 Accession Number: 20110325–5109 Comment Date: 5 p.m. Eastern Time on Friday, April 15, 2011 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER07–1195–001 Applicants: Mittal Steel USA, Inc. Description: Amendment to Notice of Non-Material Changes in Status, ArcelorMittal USA Inc. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 76, Number 64 (Monday, April 4, 2011)]
[Notices]
[Page 18542]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7780]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13124-002]


Copper Valley Electric Association; Notice of Scoping Document 2 
and Soliciting Scoping Comments for an Oirginal Application for License

    a. Type of Application: Original License Application.
    b. Project No.: 13124-002.
    c. Applicant: Copper Valley Electric Association (Copper Valley)
    d. Name of Project: Allison Creek Project.
    e. Location: On the south side of Port Valdez, on the shore 
opposite from the community of Valdez, Alaska, near the Alyeska Marine 
Terminal and the terminus of the Trans Alaska Pipeline System (TAPS) in 
Township 9 South, Range 6 West, Seward Meridian, Alaska.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    g. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley 
Electric Association, P.O. Box 45, Mile 187 Glenn Highway, Glennallen, 
Alaska 99588, 907-822-3211, allisonlake@cvea.org.
    h. FERC Contact: Kim A. Nguyen, phone (202) 502-6105; e-mail at 
kim.nguyen@ferc.gov.
    i. Deadline for filing scoping comments: April 27, 2011. All 
documents may be filed electronically via the Internet. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed 
electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. Please include the 
project number (P-13124-002) on any comments filed.
    j. The proposed project would consist of: (1) A 100-foot by 10-foot 
diversion structure on Allison Creek; (2) a 7,600-foot-long, 42-inch-
diameter buried/above-ground steel pipeline; (3) a 40-foot by 40-foot 
powerhouse; (4) two 6,500 kilowatt Pelton turbines; (5) a 150-foot-long 
tailrace; (6) a switchyard; (7) 3.8-mile-long, 34.5 kilovolt 
transmission line; and (8) appurtenant facilities.
    k. On April 7, 2010, Copper Valley filed a Notice of Intent (NOI) 
to file an application for an original license and requested to use the 
Commission's Alternative Licensing Process (ALP, which was granted on 
June 7, 2010. On April 13, 2010, Copper Valley filed a Pre-Application 
Document (PAD) including a Preliminary Draft Environmental Assessment 
(PDEA) for the project. Since the filing of the PAD and PDEA, Copper 
Valley has proposed changes to the project design and has filed a 
Scoping Document 2 (SD2) describing these modifications and changes to 
the proposed project. Therefore, we are noticing SD2 and soliciting 
comments on this new proposal. Under the ALP, Copper Valley plans to 
file a draft License Application for review and comments in early May 
2011, with the final License Application to follow by August 31, 2011.
    l. SD2 is available for inspection and reproduction at the 
Commission's Public Reference Room, located at 888 First Street, NE., 
Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This 
filing may also be viewed on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding 
the last three digits in the docket number field to access the 
document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address above.

    Dated: March 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7780 Filed 4-1-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.