Wediko Children's Services; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 18541-18542 [2011-7779]
Download as PDF
Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices
procedures, existing and proposed, so as
to provide recommendations, advice,
suggestions and opinions to the
NNMCAB regarding waste management
operations at the Los Alamos site.
Tentative Agenda:
• Welcome and Introductions.
• Committee Business Items.
• Presentation: Update on Technical
Area-21 Cleanup Under the American
Recovery and Reinvestment Act.
• Bus Tour of TA–21.
• Wrap-up Discussion and
Adjournment.
Public Participation: The NNMCAB’s
EMS&R and WM Committees welcome
the attendance of the public at their
combined committee meeting and will
make every effort to accommodate
persons with physical disabilities or
special needs. If you require special
accommodations due to a disability,
please contact Menice Santistevan at
least seven days in advance of the
meeting at the telephone number listed
above. Written statements may be filed
with the Committees either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Menice
Santistevan at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at:
https://plus44.safe-order.net/nnmcab//
2-meetings/board-minutes.htm.
Emcdonald on DSK2BSOYB1PROD with NOTICES
Issued at Washington, DC on March 29,
2011.
LaTanya Butler,
Acting Deputy Committee Management
Officer.
[FR Doc. 2011–7892 Filed 4–1–11; 8:45 am]
BILLING CODE 6405–01–P
VerDate Mar<15>2010
18:47 Apr 01, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI11–4–000]
Wediko Children’s Services; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and/or Motions
To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI11–4–000.
c. Date Filed: March 21, 2011.
d. Applicant: Wediko Children’s
Services.
e. Name of Project: Wediko Children’s
Services Hydroelectric Project.
f. Location: The Wediko Children’s
Services Hydroelectric Project will be
located on Black Pond Brook, near the
town of Windsor, Hillsborough County,
New Hampshire.
g. Filed Pursuant to: section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Dennis P.
Calcutt, Wediko Children’s Services, 11
Bobcat Blvd, Winsor, NH 03244;
Telephone: (603) 478–5236; e-mail:
https://www.dcalcutt@Wediko-nh.org.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and motions: May 2, 2011.
All documents should be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be filed with:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. Please include the
docket number (DI11–4–000) on any
comments, protests, and/or motions
filed.
k. Description of Project: The run-ofriver Wediko Children’s Services
Hydroelectric Project would consist of:
(1) An existing pond with a surface area
of 260-acre-feet; (2) an existing 91-footlong, 11-foot-high dam; (3) a proposed
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
18541
350-foot-long, 18-to-24-inch-diameter
above-ground steel penstock, routed
along a previous penstock alignment to
the powerhouse; (4) a proposed
powerhouse, containing a 16–18-kW
turbine, switchgear, and auxiliary
equipment; (5) an existing tailrace,
returning flows to Black Pond Brook;
and (6) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the proposed project. The
Commission also determines whether or
not the project: (1) Would be located on
a navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, and/or
Motions to Intervene—Anyone may
submit comments, a protest, and a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, and/or motions to intervene
must be received on or before the
E:\FR\FM\04APN1.SGM
04APN1
18542
Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices
specified comment date for the
particular application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: March 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–7779 Filed 4–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13124–002]
Emcdonald on DSK2BSOYB1PROD with NOTICES
Copper Valley Electric Association;
Notice of Scoping Document 2 and
Soliciting Scoping Comments for an
Oirginal Application for License
a. Type of Application: Original
License Application.
b. Project No.: 13124–002.
c. Applicant: Copper Valley Electric
Association (Copper Valley)
d. Name of Project: Allison Creek
Project.
e. Location: On the south side of Port
Valdez, on the shore opposite from the
community of Valdez, Alaska, near the
Alyeska Marine Terminal and the
terminus of the Trans Alaska Pipeline
System (TAPS) in Township 9 South,
Range 6 West, Seward Meridian, Alaska.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Robert A.
Wilkinson, CEO, Copper Valley Electric
Association, P.O. Box 45, Mile 187
Glenn Highway, Glennallen, Alaska
99588, 907–822–3211,
allisonlake@cvea.org.
h. FERC Contact: Kim A. Nguyen,
phone (202) 502–6105; e-mail at
kim.nguyen@ferc.gov.
i. Deadline for filing scoping
comments: April 27, 2011. All
VerDate Mar<15>2010
18:47 Apr 01, 2011
Jkt 223001
documents may be filed electronically
via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–13124–002) on any
comments filed.
j. The proposed project would consist
of: (1) A 100-foot by 10-foot diversion
structure on Allison Creek; (2) a 7,600foot-long, 42-inch-diameter buried/
above-ground steel pipeline; (3) a 40foot by 40-foot powerhouse; (4) two
6,500 kilowatt Pelton turbines; (5) a 150foot-long tailrace; (6) a switchyard; (7)
3.8-mile-long, 34.5 kilovolt transmission
line; and (8) appurtenant facilities.
k. On April 7, 2010, Copper Valley
filed a Notice of Intent (NOI) to file an
application for an original license and
requested to use the Commission’s
Alternative Licensing Process (ALP,
which was granted on June 7, 2010. On
April 13, 2010, Copper Valley filed a
Pre-Application Document (PAD)
including a Preliminary Draft
Environmental Assessment (PDEA) for
the project. Since the filing of the PAD
and PDEA, Copper Valley has proposed
changes to the project design and has
filed a Scoping Document 2 (SD2)
describing these modifications and
changes to the proposed project.
Therefore, we are noticing SD2 and
soliciting comments on this new
proposal. Under the ALP, Copper Valley
plans to file a draft License Application
for review and comments in early May
2011, with the final License Application
to follow by August 31, 2011.
l. SD2 is available for inspection and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
This filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/efiling.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address above.
Dated: March 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–7780 Filed 4–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–55–000
Applicants: DIRECT ENERGY
SERVICES LLC, Gateway Energy
Services Corporation, Direct Energy
(GW), Inc.
Description: Gateway Energy Services
Corporation, et al. Joint Application For
Authorization of Transaction Under
section 203 of the Federal Power Act,
and Request for Expedited
Consideration.
Filed Date: 03/25/2011
Accession Number: 20110325–5156
Comment Date: 5 p.m. Eastern Time
on Friday, April 15, 2011
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG11–71–000
Applicants: Summit Texas Clean
Energy, LLC
Description: Self-Certification of EWG
Status of Summit Texas Clean Energy,
LLC.
Filed Date: 03/24/2011
Accession Number: 20110324–5027
Comment Date: 5 p.m. Eastern Time
on Thursday, April 14, 2011
Docket Numbers: EG11–72–000
Applicants: White Stallion Energy
Center, LLC
Description: Self-Certification of EG or
FC of White Stallion Energy Center,
LLC.
Filed Date: 03/25/2011
Accession Number: 20110325–5109
Comment Date: 5 p.m. Eastern Time
on Friday, April 15, 2011
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER07–1195–001
Applicants: Mittal Steel USA, Inc.
Description: Amendment to Notice of
Non-Material Changes in Status,
ArcelorMittal USA Inc.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 76, Number 64 (Monday, April 4, 2011)]
[Notices]
[Pages 18541-18542]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7779]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI11-4-000]
Wediko Children's Services; Notice of Declaration of Intention
and Soliciting Comments, Protests, and/or Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI11-4-000.
c. Date Filed: March 21, 2011.
d. Applicant: Wediko Children's Services.
e. Name of Project: Wediko Children's Services Hydroelectric
Project.
f. Location: The Wediko Children's Services Hydroelectric Project
will be located on Black Pond Brook, near the town of Windsor,
Hillsborough County, New Hampshire.
g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Dennis P. Calcutt, Wediko Children's
Services, 11 Bobcat Blvd, Winsor, NH 03244; Telephone: (603) 478-5236;
e-mail: http:nh.org">//www.dcalcutt@Wediko-nh.org.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or E-mail address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and motions: May 2,
2011.
All documents should be filed electronically via the Internet. See
18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be filed with: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. Please include the docket number
(DI11-4-000) on any comments, protests, and/or motions filed.
k. Description of Project: The run-of-river Wediko Children's
Services Hydroelectric Project would consist of: (1) An existing pond
with a surface area of 260-acre-feet; (2) an existing 91-foot-long, 11-
foot-high dam; (3) a proposed 350-foot-long, 18-to-24-inch-diameter
above-ground steel penstock, routed along a previous penstock alignment
to the powerhouse; (4) a proposed powerhouse, containing a 16-18-kW
turbine, switchgear, and auxiliary equipment; (5) an existing tailrace,
returning flows to Black Pond Brook; and (6) appurtenant facilities.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the interests of interstate or foreign
commerce would be affected by the proposed project. The Commission also
determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676,
or TTY, contact (202) 502-8659. A copy is also available for inspection
and reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, and/or Motions to Intervene--Anyone may
submit comments, a protest, and a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, and/or motions to intervene must be received on or before the
[[Page 18542]]
specified comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: March 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7779 Filed 4-1-11; 8:45 am]
BILLING CODE 6717-01-P