Wediko Children's Services; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 18541-18542 [2011-7779]

Download as PDF Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices procedures, existing and proposed, so as to provide recommendations, advice, suggestions and opinions to the NNMCAB regarding waste management operations at the Los Alamos site. Tentative Agenda: • Welcome and Introductions. • Committee Business Items. • Presentation: Update on Technical Area-21 Cleanup Under the American Recovery and Reinvestment Act. • Bus Tour of TA–21. • Wrap-up Discussion and Adjournment. Public Participation: The NNMCAB’s EMS&R and WM Committees welcome the attendance of the public at their combined committee meeting and will make every effort to accommodate persons with physical disabilities or special needs. If you require special accommodations due to a disability, please contact Menice Santistevan at least seven days in advance of the meeting at the telephone number listed above. Written statements may be filed with the Committees either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Menice Santistevan at the address or telephone number listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Menice Santistevan at the address or phone number listed above. Minutes and other Board documents are on the Internet at: https://plus44.safe-order.net/nnmcab// 2-meetings/board-minutes.htm. Emcdonald on DSK2BSOYB1PROD with NOTICES Issued at Washington, DC on March 29, 2011. LaTanya Butler, Acting Deputy Committee Management Officer. [FR Doc. 2011–7892 Filed 4–1–11; 8:45 am] BILLING CODE 6405–01–P VerDate Mar<15>2010 18:47 Apr 01, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI11–4–000] Wediko Children’s Services; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI11–4–000. c. Date Filed: March 21, 2011. d. Applicant: Wediko Children’s Services. e. Name of Project: Wediko Children’s Services Hydroelectric Project. f. Location: The Wediko Children’s Services Hydroelectric Project will be located on Black Pond Brook, near the town of Windsor, Hillsborough County, New Hampshire. g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Dennis P. Calcutt, Wediko Children’s Services, 11 Bobcat Blvd, Winsor, NH 03244; Telephone: (603) 478–5236; e-mail: https://www.dcalcutt@Wediko-nh.org. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and motions: May 2, 2011. All documents should be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI11–4–000) on any comments, protests, and/or motions filed. k. Description of Project: The run-ofriver Wediko Children’s Services Hydroelectric Project would consist of: (1) An existing pond with a surface area of 260-acre-feet; (2) an existing 91-footlong, 11-foot-high dam; (3) a proposed PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 18541 350-foot-long, 18-to-24-inch-diameter above-ground steel penstock, routed along a previous penstock alignment to the powerhouse; (4) a proposed powerhouse, containing a 16–18-kW turbine, switchgear, and auxiliary equipment; (5) an existing tailrace, returning flows to Black Pond Brook; and (6) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, and/or Motions to Intervene—Anyone may submit comments, a protest, and a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, and/or motions to intervene must be received on or before the E:\FR\FM\04APN1.SGM 04APN1 18542 Federal Register / Vol. 76, No. 64 / Monday, April 4, 2011 / Notices specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: March 28, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7779 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124–002] Emcdonald on DSK2BSOYB1PROD with NOTICES Copper Valley Electric Association; Notice of Scoping Document 2 and Soliciting Scoping Comments for an Oirginal Application for License a. Type of Application: Original License Application. b. Project No.: 13124–002. c. Applicant: Copper Valley Electric Association (Copper Valley) d. Name of Project: Allison Creek Project. e. Location: On the south side of Port Valdez, on the shore opposite from the community of Valdez, Alaska, near the Alyeska Marine Terminal and the terminus of the Trans Alaska Pipeline System (TAPS) in Township 9 South, Range 6 West, Seward Meridian, Alaska. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley Electric Association, P.O. Box 45, Mile 187 Glenn Highway, Glennallen, Alaska 99588, 907–822–3211, allisonlake@cvea.org. h. FERC Contact: Kim A. Nguyen, phone (202) 502–6105; e-mail at kim.nguyen@ferc.gov. i. Deadline for filing scoping comments: April 27, 2011. All VerDate Mar<15>2010 18:47 Apr 01, 2011 Jkt 223001 documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P–13124–002) on any comments filed. j. The proposed project would consist of: (1) A 100-foot by 10-foot diversion structure on Allison Creek; (2) a 7,600foot-long, 42-inch-diameter buried/ above-ground steel pipeline; (3) a 40foot by 40-foot powerhouse; (4) two 6,500 kilowatt Pelton turbines; (5) a 150foot-long tailrace; (6) a switchyard; (7) 3.8-mile-long, 34.5 kilovolt transmission line; and (8) appurtenant facilities. k. On April 7, 2010, Copper Valley filed a Notice of Intent (NOI) to file an application for an original license and requested to use the Commission’s Alternative Licensing Process (ALP, which was granted on June 7, 2010. On April 13, 2010, Copper Valley filed a Pre-Application Document (PAD) including a Preliminary Draft Environmental Assessment (PDEA) for the project. Since the filing of the PAD and PDEA, Copper Valley has proposed changes to the project design and has filed a Scoping Document 2 (SD2) describing these modifications and changes to the proposed project. Therefore, we are noticing SD2 and soliciting comments on this new proposal. Under the ALP, Copper Valley plans to file a draft License Application for review and comments in early May 2011, with the final License Application to follow by August 31, 2011. l. SD2 is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address above. Dated: March 28, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7780 Filed 4–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC11–55–000 Applicants: DIRECT ENERGY SERVICES LLC, Gateway Energy Services Corporation, Direct Energy (GW), Inc. Description: Gateway Energy Services Corporation, et al. Joint Application For Authorization of Transaction Under section 203 of the Federal Power Act, and Request for Expedited Consideration. Filed Date: 03/25/2011 Accession Number: 20110325–5156 Comment Date: 5 p.m. Eastern Time on Friday, April 15, 2011 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG11–71–000 Applicants: Summit Texas Clean Energy, LLC Description: Self-Certification of EWG Status of Summit Texas Clean Energy, LLC. Filed Date: 03/24/2011 Accession Number: 20110324–5027 Comment Date: 5 p.m. Eastern Time on Thursday, April 14, 2011 Docket Numbers: EG11–72–000 Applicants: White Stallion Energy Center, LLC Description: Self-Certification of EG or FC of White Stallion Energy Center, LLC. Filed Date: 03/25/2011 Accession Number: 20110325–5109 Comment Date: 5 p.m. Eastern Time on Friday, April 15, 2011 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER07–1195–001 Applicants: Mittal Steel USA, Inc. Description: Amendment to Notice of Non-Material Changes in Status, ArcelorMittal USA Inc. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 76, Number 64 (Monday, April 4, 2011)]
[Notices]
[Pages 18541-18542]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7779]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI11-4-000]


Wediko Children's Services; Notice of Declaration of Intention 
and Soliciting Comments, Protests, and/or Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.
    b. Docket No: DI11-4-000.
    c. Date Filed: March 21, 2011.
    d. Applicant: Wediko Children's Services.
    e. Name of Project: Wediko Children's Services Hydroelectric 
Project.
    f. Location: The Wediko Children's Services Hydroelectric Project 
will be located on Black Pond Brook, near the town of Windsor, 
Hillsborough County, New Hampshire.
    g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Dennis P. Calcutt, Wediko Children's 
Services, 11 Bobcat Blvd, Winsor, NH 03244; Telephone: (603) 478-5236; 
e-mail: http:nh.org">//www.dcalcutt@Wediko-nh.org.
    i. FERC Contact: Any questions on this notice should be addressed 
to Henry Ecton, (202) 502-8768, or E-mail address: 
henry.ecton@ferc.gov.
    j. Deadline for filing comments, protests, and motions: May 2, 
2011.
    All documents should be filed electronically via the Internet. See 
18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be filed with: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. Please include the docket number 
(DI11-4-000) on any comments, protests, and/or motions filed.
    k. Description of Project: The run-of-river Wediko Children's 
Services Hydroelectric Project would consist of: (1) An existing pond 
with a surface area of 260-acre-feet; (2) an existing 91-foot-long, 11-
foot-high dam; (3) a proposed 350-foot-long, 18-to-24-inch-diameter 
above-ground steel penstock, routed along a previous penstock alignment 
to the powerhouse; (4) a proposed powerhouse, containing a 16-18-kW 
turbine, switchgear, and auxiliary equipment; (5) an existing tailrace, 
returning flows to Black Pond Brook; and (6) appurtenant facilities.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the interests of interstate or foreign 
commerce would be affected by the proposed project. The Commission also 
determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the Web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, 
or TTY, contact (202) 502-8659. A copy is also available for inspection 
and reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, and/or Motions to Intervene--Anyone may 
submit comments, a protest, and a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, .211, .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, and/or motions to intervene must be received on or before the

[[Page 18542]]

specified comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: March 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7779 Filed 4-1-11; 8:45 am]
BILLING CODE 6717-01-P