Environmental Impacts Statements; Notice of Availability, 18217-18218 [2011-7791]

Download as PDF 18217 Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices The SMP is a comprehensive plan to protect and enhance the two lakes’ natural resources while encouraging economic development activities that complement or have neutral effects on those natural resources in a manner that is consistent with license requirements and project purposes, and to address the needs and interests of stakeholders. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7685 Filed 3–31–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662–012; Project No. 12968– 001] FirstLight Hydro Generating Company, City of Norwich Department of Public Utilities; Notice Updating Procedural Schedule for Licensing Take notice that the Hydropower Licensing Schedule for the Scotland Hydroelectric Project No. 2662 and Scotland Hydroelectric Project No. 12968 has been updated. Subsequent revisions to the schedule may be made as appropriate. Milestone Target date Filing of Additional Information ................................................................................................................................................... Issuance of the Better Adapted Statement Request ................................................................................................................. Notice of Acceptance/Notice of Ready for Evironmental Analysis ............................................................................................ Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................ Filing of the Better Adapted Statement ...................................................................................................................................... Commission issues EA .............................................................................................................................................................. Comments on EA ....................................................................................................................................................................... Modified terms and conditions ................................................................................................................................................... May 8, 2011. May 16, 2011. May 16, 2011. July 15, 2011. July 15, 2011. November 12, 2011. December 12, 2011. February 10, 2012. ENVIRONMENTAL PROTECTION AGENCY [FR Doc. 2011–7681 Filed 3–31–11; 8:45 am] [ER–FRL–8996–2] BILLING CODE 6717–01–P mstockstill on DSKH9S0YB1PROD with NOTICES Dated: March 24, 2011. Kimberly D. Bose, Secretary. Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/21/2011 through 03/25/2011 Pursuant to 40 CFR 1506.9. VerDate Mar<15>2010 20:09 Mar 31, 2011 Jkt 223001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/ nepa/eisdata.html. Including the entire EIS comment letters on the Web site E:\FR\FM\01APN1.SGM 01APN1 mstockstill on DSKH9S0YB1PROD with NOTICES 18218 Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal Recycling Facility Project, Proposal to Develop and Operate a Scrap Metal Shredding and Recycling Facility at the Port of West Sacramento, Yolo County, CA, Comment Period Ends: 05/16/2011, Contact: David W. Tilley 916–617–4645. EIS No. 20110090, Draft EIS, USFS, MN, Federal Hardrock Mineral Prospecting Permits Project, To Conduct Mineral Exploration Drilling and Geophysical Activities on the Superior National Forest, Cook, Lake, St. Louis and Koochiching Counties, MIN, Comment Period Ends: 05/16/2011, Contact: Loretta Cartner 218–626– 4382. EIS No. 20110091, Final EIS, HUD, WA, Sunset Area Community Planned Action, Proposal to Redevelopment of the Sunset Terrace Public Housing Community and Associated Neighborhood Growth and Revitalization, City of Renton, WA, Review Period Ends: 05/02/2011, Contact: Erika Conkling 425–430– 6578. EIS No. 20110092, Draft EIS, TVA, 00, Natural Resource Plan, To Determine How TVA Will Manage Its Natural Resource Over the Next 20 Years, Implementation, AL, GA, KY, MS, NC, TN and VA, Comment Period Ends: 05/16/2011, Contact: Charles P. Nicholson 864–632–3582. EIS No. 20110093, Final EIS, NOAA, 00, Atlantic Sea Scallop Fishery Management Plan, Amendment 15, Implementation of the Annual Catch Limits (ACLs) and Accountability Measures (AMs) to Prevent Overfishing, Gulf of Maine, Georges Bank, Review Period Ends: 05/02/ 2011, Contact: Patricia A. Kurkul 978–281–9250. EIS No. 20110094, Draft EIS, USFS, CA, Kirkwood Meadows Power Line Reliability Project, Proposal to Construct and Operate 34.5 kilovolt (kV) Power Line, Eldorado National Forest, Amador, Eldorado, and Alpine Counties, CA, Comment Period Ends: 05/31/2011, Contact: Susan A. Rodman 530–621–5298. EIS No. 20110095, Draft EIS, USACE, MA, South Coast Rail Project, To Establish Commuter Passenger Transit Service between Boston and the Cities of New Bedford and Fall River, VerDate Mar<15>2010 20:09 Mar 31, 2011 Jkt 223001 Bristol, Plymouth, Norfolk and Suffolk Counties, MA, Comment Period Ends: 05/27/2011, Contact: Alan Anacheka-Nasemann 978–318– 8214. EIS No. 20110096, Final EIS, STB, AK, Port MacKenzie Rail Line Extension Construction and Operation, Alaska Railroad Corporation, Port MacKenzie, AK, Review Period Ends: 05/02/2011, Contact: Dave Navecky 202–245–0294. EIS No. 20110097, Final EIS, FRA, NV, DesertXpress High-Speed Passenger Train Project, Proposes to Construct and Operate High-Speed Passenger Train between Victorville, California and Las Vegas, Nevada, Review Period Ends: 05/02/2011, Contact: Wendy Messenger 202–493–6396. Amended Notices EIS No. 20100076, Final EIS, FRBSF, WA, WITHDRAWN—Federal Reserve Bank of San Francisco, Proposes to Sell the Property at 1015 Second Avenue that is Eligible for Listing on the National Register of Historic Places, located in Seattle, WA, Review Period Ends: 04/19/2010, Contact: Robert Kellar 415–974–2655. Revision to FR Notice Published 03/19/2010: Officially Withdrawn By the Preparing Agency. Dated: March 29, 2011. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2011–7791 Filed 3–31–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9287–6] Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to Salt Lake City, UT Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality to Salt Lake City, UT for three vertical linear motion mixers to be installed in the City’s Water Reclamation Facility anaerobic SUMMARY: PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 digesters. This is a project-specific waiver and only applies to the use of the specified product for the ARRA-funded project being proposed. Any other ARRA project that may wish to use the same product must apply for a separate waiver based on project-specific circumstances. Vertical linear motion mixers are a proprietary mixing technology developed by Enersave Fluid Mixers, Inc. (Enersave) of Ontario, Canada. The City’s waiver request states that the mixer’s drive head is manufactured by Enersave in Canada and the mixer’s vertical drive shaft and hydro-disk will be manufactured in the United States (U.S.). There are no U.S. manufacturers of vertical linear motor mixers that meet the project specifications. The Regional Administrator is making this determination based on the review and recommendation of EPA Region 8’s Technical & Financial Services Unit. Salt Lake City has provided sufficient documentation to support its request. The Assistant Administrator of the Office of Administration and Resources Management has concurred on this decision to make an exception to Section 1605 of ARRA. DATES: Effective Date: April 1, 2011. FOR FURTHER INFORMATION CONTACT: Jody Ostendorf, Recovery Act Coordinator, (303) 312–7814, or Brian Friel, SRF Coordinator, (303) 312–6277, Technical & Financial Services Unit, Water Program, Office of Partnerships & Regulatory Assistance, U.S. EPA Region 8, 1595 Wynkoop St., Denver, CO 80202. SUPPLEMENTARY INFORMATION: In accordance with ARRA Section 1605(c) and pursuant to Section 1605(b)(2) of Public Law 111–5, Buy American requirements, EPA hereby provides notice that it is granting a project waiver to Salt Lake City for the purchase of three vertical linear motion mixers which have a drive head that is manufactured by Enersave in Canada. This manufactured good will be used as part of Salt Lake City’s Water Reclamation Facility’s capacity upgrades. Section 1605 of the ARRA requires that none of the appropriated funds may be used for the construction, alteration, maintenance, or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project are produced in the United States, or unless a waiver is provided to the recipient by the head of the appropriate agency, in this case EPA. A waiver may be provided if EPA determines that (1) Applying these requirements would be inconsistent E:\FR\FM\01APN1.SGM 01APN1

Agencies

[Federal Register Volume 76, Number 63 (Friday, April 1, 2011)]
[Notices]
[Pages 18217-18218]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7791]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8996-2]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 03/21/2011 through 03/25/2011
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA met this mandate by publishing weekly notices 
of availability of EPA comments, which includes a brief summary of 
EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS 
comment letters on the Web site

[[Page 18218]]

satisfies the Section 309(a) requirement to make EPA's comments on EISs 
available to the public. Accordingly, on March 31, 2010, EPA 
discontinued the publication of the notice of availability of EPA 
comments in the Federal Register.

EIS No. 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal 
Recycling Facility Project, Proposal to Develop and Operate a Scrap 
Metal Shredding and Recycling Facility at the Port of West Sacramento, 
Yolo County, CA, Comment Period Ends: 05/16/2011, Contact: David W. 
Tilley 916-617-4645.
EIS No. 20110090, Draft EIS, USFS, MN, Federal Hardrock Mineral 
Prospecting Permits Project, To Conduct Mineral Exploration Drilling 
and Geophysical Activities on the Superior National Forest, Cook, Lake, 
St. Louis and Koochiching Counties, MIN, Comment Period Ends: 05/16/
2011, Contact: Loretta Cartner 218-626-4382.
EIS No. 20110091, Final EIS, HUD, WA, Sunset Area Community Planned 
Action, Proposal to Redevelopment of the Sunset Terrace Public Housing 
Community and Associated Neighborhood Growth and Revitalization, City 
of Renton, WA, Review Period Ends: 05/02/2011, Contact: Erika Conkling 
425-430-6578.
EIS No. 20110092, Draft EIS, TVA, 00, Natural Resource Plan, To 
Determine How TVA Will Manage Its Natural Resource Over the Next 20 
Years, Implementation, AL, GA, KY, MS, NC, TN and VA, Comment Period 
Ends: 05/16/2011, Contact: Charles P. Nicholson 864-632-3582.
EIS No. 20110093, Final EIS, NOAA, 00, Atlantic Sea Scallop Fishery 
Management Plan, Amendment 15, Implementation of the Annual Catch 
Limits (ACLs) and Accountability Measures (AMs) to Prevent Overfishing, 
Gulf of Maine, Georges Bank, Review Period Ends: 05/02/2011, Contact: 
Patricia A. Kurkul 978-281-9250.
EIS No. 20110094, Draft EIS, USFS, CA, Kirkwood Meadows Power Line 
Reliability Project, Proposal to Construct and Operate 34.5 kilovolt 
(kV) Power Line, Eldorado National Forest, Amador, Eldorado, and Alpine 
Counties, CA, Comment Period Ends: 05/31/2011, Contact: Susan A. Rodman 
530-621-5298.
EIS No. 20110095, Draft EIS, USACE, MA, South Coast Rail Project, To 
Establish Commuter Passenger Transit Service between Boston and the 
Cities of New Bedford and Fall River, Bristol, Plymouth, Norfolk and 
Suffolk Counties, MA, Comment Period Ends: 05/27/2011, Contact: Alan 
Anacheka-Nasemann 978-318-8214.
EIS No. 20110096, Final EIS, STB, AK, Port MacKenzie Rail Line 
Extension Construction and Operation, Alaska Railroad Corporation, Port 
MacKenzie, AK, Review Period Ends: 05/02/2011, Contact: Dave Navecky 
202-245-0294.
EIS No. 20110097, Final EIS, FRA, NV, DesertXpress High-Speed Passenger 
Train Project, Proposes to Construct and Operate High-Speed Passenger 
Train between Victorville, California and Las Vegas, Nevada, Review 
Period Ends: 05/02/2011, Contact: Wendy Messenger 202-493-6396.

Amended Notices

EIS No. 20100076, Final EIS, FRBSF, WA, WITHDRAWN--Federal Reserve Bank 
of San Francisco, Proposes to Sell the Property at 1015 Second Avenue 
that is Eligible for Listing on the National Register of Historic 
Places, located in Seattle, WA, Review Period Ends: 04/19/2010, 
Contact: Robert Kellar 415-974-2655. Revision to FR Notice Published 
03/19/2010: Officially Withdrawn By the Preparing Agency.

    Dated: March 29, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2011-7791 Filed 3-31-11; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.