Environmental Impacts Statements; Notice of Availability, 18217-18218 [2011-7791]
Download as PDF
18217
Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices
The SMP is a comprehensive plan to
protect and enhance the two lakes’
natural resources while encouraging
economic development activities that
complement or have neutral effects on
those natural resources in a manner that
is consistent with license requirements
and project purposes, and to address the
needs and interests of stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–7685 Filed 3–31–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–012; Project No. 12968–
001]
FirstLight Hydro Generating Company,
City of Norwich Department of Public
Utilities; Notice Updating Procedural
Schedule for Licensing
Take notice that the Hydropower
Licensing Schedule for the Scotland
Hydroelectric Project No. 2662 and
Scotland Hydroelectric Project No.
12968 has been updated. Subsequent
revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of Additional Information ...................................................................................................................................................
Issuance of the Better Adapted Statement Request .................................................................................................................
Notice of Acceptance/Notice of Ready for Evironmental Analysis ............................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................
Filing of the Better Adapted Statement ......................................................................................................................................
Commission issues EA ..............................................................................................................................................................
Comments on EA .......................................................................................................................................................................
Modified terms and conditions ...................................................................................................................................................
May 8, 2011.
May 16, 2011.
May 16, 2011.
July 15, 2011.
July 15, 2011.
November 12, 2011.
December 12, 2011.
February 10, 2012.
ENVIRONMENTAL PROTECTION
AGENCY
[FR Doc. 2011–7681 Filed 3–31–11; 8:45 am]
[ER–FRL–8996–2]
BILLING CODE 6717–01–P
mstockstill on DSKH9S0YB1PROD with NOTICES
Dated: March 24, 2011.
Kimberly D. Bose,
Secretary.
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/21/2011 through 03/25/2011
Pursuant to 40 CFR 1506.9.
VerDate Mar<15>2010
20:09 Mar 31, 2011
Jkt 223001
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
E:\FR\FM\01APN1.SGM
01APN1
mstockstill on DSKH9S0YB1PROD with NOTICES
18218
Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110089, Draft EIS, HUD, CA,
West Coast Recycling Group Metal
Recycling Facility Project, Proposal to
Develop and Operate a Scrap Metal
Shredding and Recycling Facility at
the Port of West Sacramento, Yolo
County, CA, Comment Period Ends:
05/16/2011, Contact: David W. Tilley
916–617–4645.
EIS No. 20110090, Draft EIS, USFS, MN,
Federal Hardrock Mineral Prospecting
Permits Project, To Conduct Mineral
Exploration Drilling and Geophysical
Activities on the Superior National
Forest, Cook, Lake, St. Louis and
Koochiching Counties, MIN,
Comment Period Ends: 05/16/2011,
Contact: Loretta Cartner 218–626–
4382.
EIS No. 20110091, Final EIS, HUD, WA,
Sunset Area Community Planned
Action, Proposal to Redevelopment of
the Sunset Terrace Public Housing
Community and Associated
Neighborhood Growth and
Revitalization, City of Renton, WA,
Review Period Ends: 05/02/2011,
Contact: Erika Conkling 425–430–
6578.
EIS No. 20110092, Draft EIS, TVA, 00,
Natural Resource Plan, To Determine
How TVA Will Manage Its Natural
Resource Over the Next 20 Years,
Implementation, AL, GA, KY, MS,
NC, TN and VA, Comment Period
Ends: 05/16/2011, Contact: Charles P.
Nicholson 864–632–3582.
EIS No. 20110093, Final EIS, NOAA, 00,
Atlantic Sea Scallop Fishery
Management Plan, Amendment 15,
Implementation of the Annual Catch
Limits (ACLs) and Accountability
Measures (AMs) to Prevent
Overfishing, Gulf of Maine, Georges
Bank, Review Period Ends: 05/02/
2011, Contact: Patricia A. Kurkul
978–281–9250.
EIS No. 20110094, Draft EIS, USFS, CA,
Kirkwood Meadows Power Line
Reliability Project, Proposal to
Construct and Operate 34.5 kilovolt
(kV) Power Line, Eldorado National
Forest, Amador, Eldorado, and Alpine
Counties, CA, Comment Period Ends:
05/31/2011, Contact: Susan A.
Rodman 530–621–5298.
EIS No. 20110095, Draft EIS, USACE,
MA, South Coast Rail Project, To
Establish Commuter Passenger Transit
Service between Boston and the Cities
of New Bedford and Fall River,
VerDate Mar<15>2010
20:09 Mar 31, 2011
Jkt 223001
Bristol, Plymouth, Norfolk and
Suffolk Counties, MA, Comment
Period Ends: 05/27/2011, Contact:
Alan Anacheka-Nasemann 978–318–
8214.
EIS No. 20110096, Final EIS, STB, AK,
Port MacKenzie Rail Line Extension
Construction and Operation, Alaska
Railroad Corporation, Port
MacKenzie, AK, Review Period Ends:
05/02/2011, Contact: Dave Navecky
202–245–0294.
EIS No. 20110097, Final EIS, FRA, NV,
DesertXpress High-Speed Passenger
Train Project, Proposes to Construct
and Operate High-Speed Passenger
Train between Victorville, California
and Las Vegas, Nevada, Review Period
Ends: 05/02/2011, Contact: Wendy
Messenger 202–493–6396.
Amended Notices
EIS No. 20100076, Final EIS, FRBSF,
WA, WITHDRAWN—Federal Reserve
Bank of San Francisco, Proposes to
Sell the Property at 1015 Second
Avenue that is Eligible for Listing on
the National Register of Historic
Places, located in Seattle, WA, Review
Period Ends: 04/19/2010, Contact:
Robert Kellar 415–974–2655. Revision
to FR Notice Published 03/19/2010:
Officially Withdrawn By the
Preparing Agency.
Dated: March 29, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2011–7791 Filed 3–31–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9287–6]
Notice of a Project Waiver of Section
1605 (Buy American Requirement) of
the American Recovery and
Reinvestment Act of 2009 (ARRA) to
Salt Lake City, UT
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The EPA is hereby granting a
project waiver of the Buy American
requirements of ARRA Section 1605
under the authority of Section
1605(b)(2) iron, steel, and the relevant
manufactured goods are not produced in
the United States in sufficient and
reasonably available quantities and of a
satisfactory quality to Salt Lake City, UT
for three vertical linear motion mixers to
be installed in the City’s Water
Reclamation Facility anaerobic
SUMMARY:
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
digesters. This is a project-specific
waiver and only applies to the use of the
specified product for the ARRA-funded
project being proposed. Any other
ARRA project that may wish to use the
same product must apply for a separate
waiver based on project-specific
circumstances. Vertical linear motion
mixers are a proprietary mixing
technology developed by Enersave Fluid
Mixers, Inc. (Enersave) of Ontario,
Canada. The City’s waiver request states
that the mixer’s drive head is
manufactured by Enersave in Canada
and the mixer’s vertical drive shaft and
hydro-disk will be manufactured in the
United States (U.S.). There are no U.S.
manufacturers of vertical linear motor
mixers that meet the project
specifications. The Regional
Administrator is making this
determination based on the review and
recommendation of EPA Region 8’s
Technical & Financial Services Unit.
Salt Lake City has provided sufficient
documentation to support its request.
The Assistant Administrator of the
Office of Administration and Resources
Management has concurred on this
decision to make an exception to
Section 1605 of ARRA.
DATES: Effective Date: April 1, 2011.
FOR FURTHER INFORMATION CONTACT: Jody
Ostendorf, Recovery Act Coordinator,
(303) 312–7814, or Brian Friel, SRF
Coordinator, (303) 312–6277, Technical
& Financial Services Unit, Water
Program, Office of Partnerships &
Regulatory Assistance, U.S. EPA Region
8, 1595 Wynkoop St., Denver, CO
80202.
SUPPLEMENTARY INFORMATION:
In accordance with ARRA Section
1605(c) and pursuant to Section
1605(b)(2) of Public Law 111–5, Buy
American requirements, EPA hereby
provides notice that it is granting a
project waiver to Salt Lake City for the
purchase of three vertical linear motion
mixers which have a drive head that is
manufactured by Enersave in Canada.
This manufactured good will be used as
part of Salt Lake City’s Water
Reclamation Facility’s capacity
upgrades.
Section 1605 of the ARRA requires
that none of the appropriated funds may
be used for the construction, alteration,
maintenance, or repair of a public
building or public work unless all of the
iron, steel, and manufactured goods
used in the project are produced in the
United States, or unless a waiver is
provided to the recipient by the head of
the appropriate agency, in this case
EPA. A waiver may be provided if EPA
determines that (1) Applying these
requirements would be inconsistent
E:\FR\FM\01APN1.SGM
01APN1
Agencies
[Federal Register Volume 76, Number 63 (Friday, April 1, 2011)]
[Notices]
[Pages 18217-18218]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7791]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8996-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 03/21/2011 through 03/25/2011
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA met this mandate by publishing weekly notices
of availability of EPA comments, which includes a brief summary of
EPA's comment letters, in the Federal Register. Since February 2008,
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site
[[Page 18218]]
satisfies the Section 309(a) requirement to make EPA's comments on EISs
available to the public. Accordingly, on March 31, 2010, EPA
discontinued the publication of the notice of availability of EPA
comments in the Federal Register.
EIS No. 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal
Recycling Facility Project, Proposal to Develop and Operate a Scrap
Metal Shredding and Recycling Facility at the Port of West Sacramento,
Yolo County, CA, Comment Period Ends: 05/16/2011, Contact: David W.
Tilley 916-617-4645.
EIS No. 20110090, Draft EIS, USFS, MN, Federal Hardrock Mineral
Prospecting Permits Project, To Conduct Mineral Exploration Drilling
and Geophysical Activities on the Superior National Forest, Cook, Lake,
St. Louis and Koochiching Counties, MIN, Comment Period Ends: 05/16/
2011, Contact: Loretta Cartner 218-626-4382.
EIS No. 20110091, Final EIS, HUD, WA, Sunset Area Community Planned
Action, Proposal to Redevelopment of the Sunset Terrace Public Housing
Community and Associated Neighborhood Growth and Revitalization, City
of Renton, WA, Review Period Ends: 05/02/2011, Contact: Erika Conkling
425-430-6578.
EIS No. 20110092, Draft EIS, TVA, 00, Natural Resource Plan, To
Determine How TVA Will Manage Its Natural Resource Over the Next 20
Years, Implementation, AL, GA, KY, MS, NC, TN and VA, Comment Period
Ends: 05/16/2011, Contact: Charles P. Nicholson 864-632-3582.
EIS No. 20110093, Final EIS, NOAA, 00, Atlantic Sea Scallop Fishery
Management Plan, Amendment 15, Implementation of the Annual Catch
Limits (ACLs) and Accountability Measures (AMs) to Prevent Overfishing,
Gulf of Maine, Georges Bank, Review Period Ends: 05/02/2011, Contact:
Patricia A. Kurkul 978-281-9250.
EIS No. 20110094, Draft EIS, USFS, CA, Kirkwood Meadows Power Line
Reliability Project, Proposal to Construct and Operate 34.5 kilovolt
(kV) Power Line, Eldorado National Forest, Amador, Eldorado, and Alpine
Counties, CA, Comment Period Ends: 05/31/2011, Contact: Susan A. Rodman
530-621-5298.
EIS No. 20110095, Draft EIS, USACE, MA, South Coast Rail Project, To
Establish Commuter Passenger Transit Service between Boston and the
Cities of New Bedford and Fall River, Bristol, Plymouth, Norfolk and
Suffolk Counties, MA, Comment Period Ends: 05/27/2011, Contact: Alan
Anacheka-Nasemann 978-318-8214.
EIS No. 20110096, Final EIS, STB, AK, Port MacKenzie Rail Line
Extension Construction and Operation, Alaska Railroad Corporation, Port
MacKenzie, AK, Review Period Ends: 05/02/2011, Contact: Dave Navecky
202-245-0294.
EIS No. 20110097, Final EIS, FRA, NV, DesertXpress High-Speed Passenger
Train Project, Proposes to Construct and Operate High-Speed Passenger
Train between Victorville, California and Las Vegas, Nevada, Review
Period Ends: 05/02/2011, Contact: Wendy Messenger 202-493-6396.
Amended Notices
EIS No. 20100076, Final EIS, FRBSF, WA, WITHDRAWN--Federal Reserve Bank
of San Francisco, Proposes to Sell the Property at 1015 Second Avenue
that is Eligible for Listing on the National Register of Historic
Places, located in Seattle, WA, Review Period Ends: 04/19/2010,
Contact: Robert Kellar 415-974-2655. Revision to FR Notice Published
03/19/2010: Officially Withdrawn By the Preparing Agency.
Dated: March 29, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2011-7791 Filed 3-31-11; 8:45 am]
BILLING CODE 6560-50-P