Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests, 18214-18215 [2011-7686]

Download as PDF mstockstill on DSKH9S0YB1PROD with NOTICES 18214 Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices f. Location: The project is located in south-central Idaho on the Snake River from river mile 612.5 to river mile 617.1 in Twin Falls and Jerome counties. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: L. Lewis Wardle, Licensing Program Coordinator, Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 83702, (208) 388–2964, lwardle@idahopower.com. i. FERC Contact: Dr. Mark Ivy, (202) 502–6156, mark.ivy@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 25, 2011. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P– 2778–062) on any comments, motions, or recommendations filed. k. Description of the Application: Idaho Power Company, licensee of the Shoshone Falls Hydroelectric Project, has filed a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage project lands including control of noxious weeds, protection and enhancement of riparian habitats, and protection and enhancement of shoreline habitats in a manner that is consistent with license requirements and project purposes, and to address the needs and interests of stakeholders. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. VerDate Mar<15>2010 20:09 Mar 31, 2011 Jkt 223001 For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 Dated: March 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7682 Filed 3–31–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2055–087] Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2055–087. c. Date Filed: December 22, 2010. d. Applicant: Idaho Power. e. Name of Project: C.J. Strike Hydroelectric Project. f. Location: The project is located in south-western Idaho on the Snake River from river mile 525 near Hammett to river mile 493 near Grand View in Owyhee and Elmore counties. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: L. Lewis Wardle, Licensing Program Coordinator, Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 83702, (208) 388–2964, lwardle@idahopower.com. i. FERC Contact: Dr. Mark Ivy, (202) 502–6156, mark.ivy@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 25, 2011. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P– 2055–087) on any comments, motions, or recommendations filed. E:\FR\FM\01APN1.SGM 01APN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices k. Description of the Application: Idaho Power Company, licensee of the C.J. Strike Hydroelectric Project, has filed a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage project lands including control of noxious weeds, protection and enhancement of riparian habitats, and protection and enhancement of shoreline habitats in a manner that is consistent with license requirements and project purposes, and to address the needs and interests of stakeholders. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or VerDate Mar<15>2010 20:09 Mar 31, 2011 Jkt 223001 intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7686 Filed 3–31–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13102–001] Birch Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 13102–001. c. Dated Filed: February 2, 2011. d. Submitted by: Birch Power Company. e. Name of Project: Demopolis Lock and Dam Hydroelectric Project. f. Location: On the Tombigbee River, in Marengo and Sumter Counties, Alabama. The project would occupy United States land, administered by the U.S. Army Corps of Engineers, for a transmission line and other ancillary facilities. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations h. Potential Applicant Contact: Nicholas E. Josten, 2742 Saint Charles PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 18215 Avenue, Idaho Falls, ID 83404; (208) 528–6152; e-mail—gsense@cableone.net i. FERC Contact: Jennifer Adams at (202) 502–8087; or e-mail at jennifer.adams@ferc.gov. j. Birch Power Company filed its request to use the Traditional Licensing Process on February 1, 2011. Birch Power Company provided public notice of its request on February 5, 2011. In a letter dated March 25, 2011, the Director of the Office of Energy Projects approved Birch Power Company’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Alabama State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. Birch Power Company filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. n. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7684 Filed 3–31–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\01APN1.SGM 01APN1

Agencies

[Federal Register Volume 76, Number 63 (Friday, April 1, 2011)]
[Notices]
[Pages 18214-18215]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7686]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2055-087]


Idaho Power; Notice of Availability of Land Management Plan 
Update for the Shoshone Falls Project and Soliciting Comments, Motions 
To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Land Management Plan Update.
    b. Project No.: 2055-087.
    c. Date Filed: December 22, 2010.
    d. Applicant: Idaho Power.
    e. Name of Project: C.J. Strike Hydroelectric Project.
    f. Location: The project is located in south-western Idaho on the 
Snake River from river mile 525 near Hammett to river mile 493 near 
Grand View in Owyhee and Elmore counties.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: L. Lewis Wardle, Licensing Program 
Coordinator, Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 
83702, (208) 388-2964, lwardle@idahopower.com.
    i. FERC Contact: Dr. Mark Ivy, (202) 502-6156, mark.ivy@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: April 25, 2011.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments.
    Please include the project number (P-2055-087) on any comments, 
motions, or recommendations filed.

[[Page 18215]]

    k. Description of the Application: Idaho Power Company, licensee of 
the C.J. Strike Hydroelectric Project, has filed a Land Management Plan 
(LMP) update for the project. The LMP is a comprehensive plan to manage 
project lands including control of noxious weeds, protection and 
enhancement of riparian habitats, and protection and enhancement of 
shoreline habitats in a manner that is consistent with license 
requirements and project purposes, and to address the needs and 
interests of stakeholders.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment application. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: March 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7686 Filed 3-31-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.