FirstLight Hydro Generating Company, City of Norwich Department of Public Utilities; Notice Updating Procedural Schedule for Licensing, 18217 [2011-7681]

Download as PDF 18217 Federal Register / Vol. 76, No. 63 / Friday, April 1, 2011 / Notices The SMP is a comprehensive plan to protect and enhance the two lakes’ natural resources while encouraging economic development activities that complement or have neutral effects on those natural resources in a manner that is consistent with license requirements and project purposes, and to address the needs and interests of stakeholders. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–7685 Filed 3–31–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662–012; Project No. 12968– 001] FirstLight Hydro Generating Company, City of Norwich Department of Public Utilities; Notice Updating Procedural Schedule for Licensing Take notice that the Hydropower Licensing Schedule for the Scotland Hydroelectric Project No. 2662 and Scotland Hydroelectric Project No. 12968 has been updated. Subsequent revisions to the schedule may be made as appropriate. Milestone Target date Filing of Additional Information ................................................................................................................................................... Issuance of the Better Adapted Statement Request ................................................................................................................. Notice of Acceptance/Notice of Ready for Evironmental Analysis ............................................................................................ Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................ Filing of the Better Adapted Statement ...................................................................................................................................... Commission issues EA .............................................................................................................................................................. Comments on EA ....................................................................................................................................................................... Modified terms and conditions ................................................................................................................................................... May 8, 2011. May 16, 2011. May 16, 2011. July 15, 2011. July 15, 2011. November 12, 2011. December 12, 2011. February 10, 2012. ENVIRONMENTAL PROTECTION AGENCY [FR Doc. 2011–7681 Filed 3–31–11; 8:45 am] [ER–FRL–8996–2] BILLING CODE 6717–01–P mstockstill on DSKH9S0YB1PROD with NOTICES Dated: March 24, 2011. Kimberly D. Bose, Secretary. Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/21/2011 through 03/25/2011 Pursuant to 40 CFR 1506.9. VerDate Mar<15>2010 20:09 Mar 31, 2011 Jkt 223001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/ nepa/eisdata.html. Including the entire EIS comment letters on the Web site E:\FR\FM\01APN1.SGM 01APN1

Agencies

[Federal Register Volume 76, Number 63 (Friday, April 1, 2011)]
[Notices]
[Page 18217]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-7681]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2662-012; Project No. 12968-001]


FirstLight Hydro Generating Company, City of Norwich Department 
of Public Utilities; Notice Updating Procedural Schedule for Licensing

    Take notice that the Hydropower Licensing Schedule for the Scotland 
Hydroelectric Project No. 2662 and Scotland Hydroelectric Project No. 
12968 has been updated. Subsequent revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of Additional Information.....  May 8, 2011.
Issuance of the Better Adapted         May 16, 2011.
 Statement Request.
Notice of Acceptance/Notice of Ready   May 16, 2011.
 for Evironmental Analysis.
Filing of recommendations,             July 15, 2011.
 preliminary terms and conditions,
 and fishway prescriptions.
Filing of the Better Adapted           July 15, 2011.
 Statement.
Commission issues EA.................  November 12, 2011.
Comments on EA.......................  December 12, 2011.
Modified terms and conditions........  February 10, 2012.
------------------------------------------------------------------------


    Dated: March 24, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7681 Filed 3-31-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.