Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 76, No. 52 / Thursday, March 17, 2011 / Notices Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Lisa A. Connolly, General Manager, Rates and Certificates, Bobcat Gas Storage, P.O. Box 1642, Houston, TX 77251– 1642, phone (713) 627–4102, e-mail laconnolly@spectraenergy.com. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, VerDate Mar<15>2010 15:48 Mar 16, 2011 Jkt 223001 888 First Street, NE., Washington, DC 20426. Comment Date: March 24, 2011. Dated: March 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–6197 Filed 3–16–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12756–003] BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P–12756–003. c. Date filed: July 26, 2010. d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer’s (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Douglas A. Spalding, BOST3 Hydroelectric Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; (952) 544–8133. i. FERC Contact: Jeanne Edwards (202) 502–6181, or by e-mail at Jeanne.edwards@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 1–866–208–3676, or for TTY, PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 14653 (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The proposed project would utilize the Corps’ existing Red River Lock and Dam No. 3, and be operated consistent with the Corps’ current operating manual. The proposed project consists of: (1) An excavated headrace channel to convey water from the upstream Pool No. 3 of the Red River into the powerhouse; (2) an excavated tailrace channel to discharge water from the powerhouse to the downstream Pool No. 2 of the Red River; (3) a 301-foot-long by 90-foot-wide concrete powerhouse located on the right (west) abutment of the Corps’ Lock and Dam No. 3; (4) one 36.2-megawatt (MW) horizontal Kaplan bulb turbine/generator unit; (5) one 2,300-foot-long, 13.2-kilovolt (kV) overhead transmission line which crosses the river and connects to a Central Louisiana Electric Company substation located on the opposite side of the river; and (6) appurtenant facilities. The proposed project would generate about 172,779 megawatt-hours (MWh) annually, which would be sold to a local utility. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. E:\FR\FM\17MRN1.SGM 17MRN1 srobinson on DSKHWCL6B1PROD with NOTICES 14654 Federal Register / Vol. 76, No. 52 / Thursday, March 17, 2011 / Notices n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ or ‘‘COMPETING APPLICATION;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. CP11–111–000] [Docket No. RP11–1745–001] UGI Storage Company; Notice of Filing Take notice that on March 9, 2011, UGI Storage Company (UGI) submitted an amendment to its January 31, 2011, filing. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Wednesday, March 16, 2011. Dated: March 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–6199 Filed 3–16–11; 8:45 am] BILLING CODE 6717–01–P Dated: March 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–6198 Filed 3–16–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 15:48 Mar 16, 2011 Jkt 223001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 Gulfstream Natural Gas System, L.L.C. Notice of Request Under Blanket Authorization Take notice that on March 1, 2011, Gulfstream Natural Gas System, L.L.C. (Gulfstream) filed a prior notice request pursuant to sections 157.205, 157.208, and 157.212 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act, and Gulfstream’s blanket certificate issued in Docket No. CP00–8, et al., for authorization to construct, own, operate and maintain a new receipt point on Gulfstream’s existing system to receive natural gas from Gulf LNG Pipeline, LLC in Jackson County, Mississippi. Specifically, Gulfstream proposes to design and construct, one 30-inch tie-in assembly connecting the outlet of the Gulf LNG Pipeline facilities to Gulfstream’s 36-inch diameter Line No. 060, electronic gas measurement equipment, and chromatograph and other gas analyzers at the receipt point, which Gulfstream will own, all as more fully set forth in the application, which is open to the public for inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this prior notice should be directed to Lisa A. Connolly, General Manager, Rates and Certificates, Gulfstream Natural Gas System, L.L.C., 5400 Westheimer Court, P.O. Box 1642, Houston, TX 77251– 1642, telephone No. (713) 627–4102, and e-mail: laconnolly@spectraenergy.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days E:\FR\FM\17MRN1.SGM 17MRN1

Agencies

[Federal Register Volume 76, Number 52 (Thursday, March 17, 2011)]
[Notices]
[Pages 14653-14654]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6198]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12756-003]


BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application 
Accepted for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: P-12756-003.
    c. Date filed: July 26, 2010.
    d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3).
    e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric 
Project.
    f. Location: The proposed project would be located at the existing 
Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red 
River, in Natchitoches Parish near the City of Colfax, Louisiana.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Douglas A. Spalding, BOST3 Hydroelectric 
Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; 
(952) 544-8133.
    i. FERC Contact: Jeanne Edwards (202) 502-6181, or by e-mail at 
Jeanne.edwards@ferc.gov.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The proposed project would utilize the Corps' existing Red River 
Lock and Dam No. 3, and be operated consistent with the Corps' current 
operating manual. The proposed project consists of: (1) An excavated 
headrace channel to convey water from the upstream Pool No. 3 of the 
Red River into the powerhouse; (2) an excavated tailrace channel to 
discharge water from the powerhouse to the downstream Pool No. 2 of the 
Red River; (3) a 301-foot-long by 90-foot-wide concrete powerhouse 
located on the right (west) abutment of the Corps' Lock and Dam No. 3; 
(4) one 36.2-megawatt (MW) horizontal Kaplan bulb turbine/generator 
unit; (5) one 2,300-foot-long, 13.2-kilovolt (kV) overhead transmission 
line which crosses the river and connects to a Central Louisiana 
Electric Company substation located on the opposite side of the river; 
and (6) appurtenant facilities. The proposed project would generate 
about 172,779 megawatt-hours (MWh) annually, which would be sold to a 
local utility.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.

[[Page 14654]]

    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on or before the specified deadline date for 
the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

    Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-6198 Filed 3-16-11; 8:45 am]
BILLING CODE 6717-01-P