BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 14653-14654 [2011-6198]
Download as PDF
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 76, No. 52 / Thursday, March 17, 2011 / Notices
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Lisa
A. Connolly, General Manager, Rates
and Certificates, Bobcat Gas Storage,
P.O. Box 1642, Houston, TX 77251–
1642, phone (713) 627–4102, e-mail
laconnolly@spectraenergy.com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
VerDate Mar<15>2010
15:48 Mar 16, 2011
Jkt 223001
888 First Street, NE., Washington, DC
20426.
Comment Date: March 24, 2011.
Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–6197 Filed 3–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12756–003]
BOST3 Hydroelectric Company, LLC
(BOST3); Notice of Application
Accepted for Filing and Soliciting
Motions To Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–12756–003.
c. Date filed: July 26, 2010.
d. Applicant: BOST3 Hydroelectric
Company, LLC (BOST3).
e. Name of Project: Red River Lock &
Dam No. 3 Hydroelectric Project.
f. Location: The proposed project
would be located at the existing Army
Corps of Engineer’s (Corps) Red River
Lock & Dam No. 3 on the Red River, in
Natchitoches Parish near the City of
Colfax, Louisiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Douglas A.
Spalding, BOST3 Hydroelectric
Company, LLC, 8441 Wayzata Blvd.,
Suite 101, Golden Valley, MN 55426;
(952) 544–8133.
i. FERC Contact: Jeanne Edwards
(202) 502–6181, or by e-mail at
Jeanne.edwards@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll
free at 1–866–208–3676, or for TTY,
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
14653
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize
the Corps’ existing Red River Lock and
Dam No. 3, and be operated consistent
with the Corps’ current operating
manual. The proposed project consists
of: (1) An excavated headrace channel to
convey water from the upstream Pool
No. 3 of the Red River into the
powerhouse; (2) an excavated tailrace
channel to discharge water from the
powerhouse to the downstream Pool No.
2 of the Red River; (3) a 301-foot-long
by 90-foot-wide concrete powerhouse
located on the right (west) abutment of
the Corps’ Lock and Dam No. 3; (4) one
36.2-megawatt (MW) horizontal Kaplan
bulb turbine/generator unit; (5) one
2,300-foot-long, 13.2-kilovolt (kV)
overhead transmission line which
crosses the river and connects to a
Central Louisiana Electric Company
substation located on the opposite side
of the river; and (6) appurtenant
facilities. The proposed project would
generate about 172,779 megawatt-hours
(MWh) annually, which would be sold
to a local utility.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
E:\FR\FM\17MRN1.SGM
17MRN1
srobinson on DSKHWCL6B1PROD with NOTICES
14654
Federal Register / Vol. 76, No. 52 / Thursday, March 17, 2011 / Notices
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or ‘‘MOTION
TO INTERVENE,’’ ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION,’’
or ‘‘COMPETING APPLICATION;’’ (2)
set forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP11–111–000]
[Docket No. RP11–1745–001]
UGI Storage Company; Notice of Filing
Take notice that on March 9, 2011,
UGI Storage Company (UGI) submitted
an amendment to its January 31, 2011,
filing.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
5 p.m. Eastern time on the specified
comment date. Anyone filing a protest
must serve a copy of that document on
all the parties to the proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Wednesday, March 16, 2011.
Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–6199 Filed 3–16–11; 8:45 am]
BILLING CODE 6717–01–P
Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–6198 Filed 3–16–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:48 Mar 16, 2011
Jkt 223001
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
Gulfstream Natural Gas System, L.L.C.
Notice of Request Under Blanket
Authorization
Take notice that on March 1, 2011,
Gulfstream Natural Gas System, L.L.C.
(Gulfstream) filed a prior notice request
pursuant to sections 157.205, 157.208,
and 157.212 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act, and
Gulfstream’s blanket certificate issued
in Docket No. CP00–8, et al., for
authorization to construct, own, operate
and maintain a new receipt point on
Gulfstream’s existing system to receive
natural gas from Gulf LNG Pipeline, LLC
in Jackson County, Mississippi.
Specifically, Gulfstream proposes to
design and construct, one 30-inch tie-in
assembly connecting the outlet of the
Gulf LNG Pipeline facilities to
Gulfstream’s 36-inch diameter Line No.
060, electronic gas measurement
equipment, and chromatograph and
other gas analyzers at the receipt point,
which Gulfstream will own, all as more
fully set forth in the application, which
is open to the public for inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice should be directed to Lisa A.
Connolly, General Manager, Rates and
Certificates, Gulfstream Natural Gas
System, L.L.C., 5400 Westheimer Court,
P.O. Box 1642, Houston, TX 77251–
1642, telephone No. (713) 627–4102,
and e-mail:
laconnolly@spectraenergy.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 76, Number 52 (Thursday, March 17, 2011)]
[Notices]
[Pages 14653-14654]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6198]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12756-003]
BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application
Accepted for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: P-12756-003.
c. Date filed: July 26, 2010.
d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3).
e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric
Project.
f. Location: The proposed project would be located at the existing
Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red
River, in Natchitoches Parish near the City of Colfax, Louisiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Douglas A. Spalding, BOST3 Hydroelectric
Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426;
(952) 544-8133.
i. FERC Contact: Jeanne Edwards (202) 502-6181, or by e-mail at
Jeanne.edwards@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed project would utilize the Corps' existing Red River
Lock and Dam No. 3, and be operated consistent with the Corps' current
operating manual. The proposed project consists of: (1) An excavated
headrace channel to convey water from the upstream Pool No. 3 of the
Red River into the powerhouse; (2) an excavated tailrace channel to
discharge water from the powerhouse to the downstream Pool No. 2 of the
Red River; (3) a 301-foot-long by 90-foot-wide concrete powerhouse
located on the right (west) abutment of the Corps' Lock and Dam No. 3;
(4) one 36.2-megawatt (MW) horizontal Kaplan bulb turbine/generator
unit; (5) one 2,300-foot-long, 13.2-kilovolt (kV) overhead transmission
line which crosses the river and connects to a Central Louisiana
Electric Company substation located on the opposite side of the river;
and (6) appurtenant facilities. The proposed project would generate
about 172,779 megawatt-hours (MWh) annually, which would be sold to a
local utility.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
[[Page 14654]]
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-6198 Filed 3-16-11; 8:45 am]