Drawbridge Operation Regulation; Grassy Sound Channel, Middle Township, NJ, 14279 [2011-6072]
Download as PDF
Federal Register / Vol. 76, No. 51 / Wednesday, March 16, 2011 / Rules and Regulations
approved previously by the Office of
Management and Budget (OMB) and
assigned OMB No. 0581—NEW.
Termination of the reporting
requirements will reduce the reporting
burden on producers by about 11 hours.
There are no Federal rules that
duplicate, overlap, or conflict with this
rule.
Executive Order 12988
This rule has been reviewed under
Executive Order 12988, Civil Justice
Reform. It is not intended to have
retroactive effect.
Section 524 of the Act provides that
the Act shall not affect or preempt any
other Federal or State law authorizing
promotion or research relating to an
agricultural commodity.
Under Section 519 of the Act, a
person subject to an order may file a
petition with USDA stating that an
order, any provision of an order, or any
obligation imposed in connection with
an order, is not established in
accordance with the law, and requesting
a modification of an order or an
exemption from an order. Any petition
filed challenging an order, any
provision of an order, or any obligation
imposed in connection with an order,
shall be filed within two years after the
effective date of an order, provision or
obligation subject to challenge in the
petition. The petitioner will have the
opportunity for a hearing on the
petition. Thereafter, USDA will issue a
ruling on the petition. The Act provides
that the district court of the United
States for any district in which the
petitioner resides or conducts business
shall be the jurisdiction to review a final
ruling on the petition, if the petitioner
files a complaint for that purpose not
later than 20 days after the date of entry
of USDA’s final ruling.
List of Subjects in 7 CFR Part 1245
Administrative practice and
procedure, Advertising, Consumer
Education, U.S. Honey, Marketing
agreements, Promotion, Reporting and
recordkeeping requirements.
Accordingly, under the authority of
7 U.S.C. 7411–7425; 7 CFR part 1245 is
removed.
ebenthall on DSK69SOYB1PROD with RULES
PART 1245—[Removed]
Dated: March 9, 2011.
David R. Shipman,
Acting Administrator, Agricultural Marketing
Service.
[FR Doc. 2011–6043 Filed 3–15–11; 8:45 am]
BILLING CODE 3410–02–P
VerDate Mar<15>2010
16:52 Mar 15, 2011
Jkt 223001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0080]
Drawbridge Operation Regulation;
Grassy Sound Channel, Middle
Township, NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Grassy
Sound Channel Bridge across the Grassy
Sound Channel, mile 1.0, at Middle
Township, NJ. The deviation is
necessary to facilitate the cleaning and
painting of the structure. This deviation
allows the bridge to remain closed for
the entirety of the deviation period.
DATES: This deviation is effective from
5 a.m. on March 1, 2011 to 5 p.m. on
April 30, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0080 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–0080 in the ‘‘Keyword’’ box
and then clicking ‘‘Search’’. They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Terrance A. Knowles,
Environmental Protection Specialist,
Fifth District; Coast Guard; telephone
757–398–6587, e-mail
Terrance.A.Knowles@uscg.mil. If you
have questions on viewing the docket,
call Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The Cape
May County Bridge Commission
(CMCBC), who owns and operates this
bascule drawbridge, has requested a
temporary deviation from the current
operating schedule to facilitate the
cleaning and painting of the bridge
structure. Under the regular operating
schedule required by 33 CFR 117.721,
the draw of the bridge shall open on
signal from 6 a.m. to 8 p.m., from May
15 through September 30. From 9:15
SUMMARY:
PO 00000
Frm 00005
Fmt 4700
Sfmt 4700
14279
a.m. to 2:30 p.m. on the fourth Sunday
in March of every year, the draw need
not open for vessels. If the fourth
Sunday falls on a religious holiday, the
draw need not open from 9:15 a.m. to
2:30 p.m. on the third Sunday of March
of every year. Two hours advance notice
is required for all other openings by
calling (609) 368–4591.
The Grassy Sound Channel Bridge,
mile 1.0, in Middle Township NJ, has a
vertical clearance in the closed position
of 15 feet above mean high water.
Vessels that can transit under the bridge
without an opening may do so at any
time. Under this temporary deviation,
CMCBC will maintain the bridge in the
closed position to vessels beginning at
5 a.m. on March 1, 2011 through 5 p.m.
on April 30, 2011.
Historically, in the last two years, the
bridge has not opened during the
months of March and April.
The Coast Guard will inform users of
the waterway through our Local and
Broadcast Notices to Mariners of the
closure periods for the bridge so that
vessels can arrange their transits to
minimize any impact caused by the
temporary deviation.
The drawbridge will open in the event
of an emergency. Vessels that can pass
under the bridge without a bridge
opening may do so at all times. Vessels
have an alternate route by transiting
through the nearby Great Channel
drawbridge, a detour of approximately
two miles.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: March 3, 2011.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. 2011–6072 Filed 3–15–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2011–0117]
RIN 1625–AA00
Safety Zone; Todd Pacific Shipyards
Vessel Roll-Out, West Duwamish
Waterway, Seattle, WA
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
E:\FR\FM\16MRR1.SGM
16MRR1
Agencies
[Federal Register Volume 76, Number 51 (Wednesday, March 16, 2011)]
[Rules and Regulations]
[Page 14279]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6072]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0080]
Drawbridge Operation Regulation; Grassy Sound Channel, Middle
Township, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Grassy Sound Channel Bridge across the Grassy Sound Channel, mile 1.0,
at Middle Township, NJ. The deviation is necessary to facilitate the
cleaning and painting of the structure. This deviation allows the
bridge to remain closed for the entirety of the deviation period.
DATES: This deviation is effective from 5 a.m. on March 1, 2011 to 5
p.m. on April 30, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0080 and are available online
by going to https://www.regulations.gov, inserting USCG-2011-0080 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Terrance A. Knowles, Environmental Protection
Specialist, Fifth District; Coast Guard; telephone 757-398-6587, e-mail
Terrance.A.Knowles@uscg.mil. If you have questions on viewing the
docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Cape May County Bridge Commission
(CMCBC), who owns and operates this bascule drawbridge, has requested a
temporary deviation from the current operating schedule to facilitate
the cleaning and painting of the bridge structure. Under the regular
operating schedule required by 33 CFR 117.721, the draw of the bridge
shall open on signal from 6 a.m. to 8 p.m., from May 15 through
September 30. From 9:15 a.m. to 2:30 p.m. on the fourth Sunday in March
of every year, the draw need not open for vessels. If the fourth Sunday
falls on a religious holiday, the draw need not open from 9:15 a.m. to
2:30 p.m. on the third Sunday of March of every year. Two hours advance
notice is required for all other openings by calling (609) 368-4591.
The Grassy Sound Channel Bridge, mile 1.0, in Middle Township NJ,
has a vertical clearance in the closed position of 15 feet above mean
high water. Vessels that can transit under the bridge without an
opening may do so at any time. Under this temporary deviation, CMCBC
will maintain the bridge in the closed position to vessels beginning at
5 a.m. on March 1, 2011 through 5 p.m. on April 30, 2011.
Historically, in the last two years, the bridge has not opened
during the months of March and April.
The Coast Guard will inform users of the waterway through our Local
and Broadcast Notices to Mariners of the closure periods for the bridge
so that vessels can arrange their transits to minimize any impact
caused by the temporary deviation.
The drawbridge will open in the event of an emergency. Vessels that
can pass under the bridge without a bridge opening may do so at all
times. Vessels have an alternate route by transiting through the nearby
Great Channel drawbridge, a detour of approximately two miles.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 3, 2011.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 2011-6072 Filed 3-15-11; 8:45 am]
BILLING CODE 9110-04-P