Download as PDF 14006 Federal Register / Vol. 76, No. 50 / Tuesday, March 15, 2011 / Notices Marketing, Inc., Dominion Nuclear Connecticut, Inc., Dominion Energy Kewaunee, Inc., Dominion Energy Brayton Point, LLC, Dominion Energy Manchester Street, Inc., Dominion Energy New England, Inc., Dominion Energy Salem Harbor, LLC, Dominion Retail, Inc., Elwood Energy, LLC, Fairless Energy, LLC, Kincaid Generation, L.L.C., NedPower Mount Storm, LLC, State Line Energy, L.L.C., Fowler Ridge Wind Farm LLC. Description: Request of Virginia Electric And Power Company And Its Market-Regulated Power Sales Affiliates For Waivers Of Certain Affiliate Restrictions Requirements. Filed Date: 03/07/2011. Accession Number: 20110307–5138. Comment Date: 5 p.m. Eastern Time on Monday, March 28, 2011. Docket Numbers: ER11–3028–000. Applicants: BBPC, LLC. Description: BBPC, LLC submits tariff filing per 35.12: BBPC LLC MBR Tariff to be effective 5/6/2011. Filed Date: 03/07/2011. Accession Number: 20110307–5166. Comment Date: 5 p.m. Eastern Time on Monday, March 28, 2011. Docket Numbers: ER11–3029–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc.’s Submission of Notice of Cancellation of Large Generator Interconnection Agreement. Filed Date: 03/07/2011. Accession Number: 20110307–5174. Comment Date: 5 p.m. Eastern Time on Monday, March 28, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 8, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–5896 Filed 3–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the Government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: March 17, 2011; 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426 STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. * Note —Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 968TH—MEETING Item No. Docket No. Company srobinson on DSKHWCL6B1PROD with NOTICES Administrative A–1 ........ A–2 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Electric E–1 ........ E–2 ........ E–3 ........ ER03–563–066 ............................................ OMITTED. NP10–18–000 .............................................. VerDate Mar<15>2010 16:50 Mar 14, 2011 Jkt 223001 PO 00000 Devon Power LLC. North American Electric Reliability Corporation. Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1 Federal Register / Vol. 76, No. 50 / Tuesday, March 15, 2011 / Notices 14007 968TH—MEETING—Continued Item No. E–4 E–5 E–6 E–7 E–8 E–9 ........ ........ ........ ........ ........ ........ E–10 E–11 E–12 E–13 E–14 E–15 E–16 ...... ...... ...... ...... ...... ...... ...... Docket No. RM09–18–001 RM11–14–000 RM10–16–000 RM10–10–000 RM10–15–000 RM09–19–000 Company ............................................. ............................................. ............................................. ............................................. ............................................. ............................................. RR09–6–003 ............................................... OMITTED. ER11–2256–000 .......................................... EL08–47–006 .............................................. EL11–12–000 .............................................. EL10–1–001 ................................................ EL10–84–002 .............................................. Revision to Electric Reliability Organization Definition of Bulk Electric System. Analysis of Horizontal Market Power under the Federal Power Act. System Restoration Reliability Standards. Planning Resource Adequacy Assessment Reliability Standard. Mandatory Reliability Standards for Interconnection Reliability Operating Limits. Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard. North American Electric Reliability Corporation. California Independent System Operator Corporation. PJM Interconnection, L.L.C. Idaho Wind Partners 1, LLC. Southern California Edison Company. Californians for Renewable Energy, Inc. v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company and the California Public Utilities Commission. Gas G–1 G–2 G–3 G–4 ........ ........ ........ ........ OMITTED. RP11–1495–002 .......................................... RP10–315–002 ............................................ OR07–7–000 ............................................... OR07–18–000 ............................................. OR07–19–000 OR07–22–000 OR09–15–000 OR09–20–000 ............................................. ............................................. ............................................. ............................................. Ozark Gas Transmission, L.L.C. Columbia Gulf Transmission Company. Tesoro Refining and Marketing Company v. Calnev Pipe Line LLC. America West Airlines, Inc. and US Airways, Inc., Chevron Products Company, Continental Airlines, Inc., Southwest Airlines Co. and Valero Marketing and Supply Company v. Calnev Pipe Line LLC. ConocoPhillips Co. v. Calnev Pipe Line LLC. BP West Coast Products, LLC v. Calnev Pipe Line LLC. Tesoro Refining and Marketing Company v. Calnev Pipe Line LLC. BP West Coast Products, LLC v. Calnev Pipe Line LLC. Hydro H–1 ........ H–2 ........ H–3 ........ P–2539–061 ................................................ P–2195–025 ................................................ P–1390–063 ................................................ Erie Boulevard Hydropower, L.P. Portland General Electric Company. Southern California Edison Company. Certificates C–1 C–2 C–3 C–4 C–5 ........ ........ ........ ........ ........ OMITTED. CP10–492–000 ............................................ OMITTED. CP10–22–000 .............................................. CP10–486–000 ............................................ srobinson on DSKHWCL6B1PROD with NOTICES Issued: March 10, 2011. Kimberly D. Bose, Secretary. A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission VerDate Mar<15>2010 16:50 Mar 14, 2011 Jkt 223001 Columbia Gas Transmission, LLC. Magnum Gas Storage, LLC, Magnum Solutions, LLC. Colorado Interstate Gas Company. Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2011–6067 Filed 3–11–11; 11:15 am] BILLING CODE 6717–01–P PO 00000 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2011–0199; FRL–9280–6] Notice of Receipt of Petition From the Government of Canada for Application of the Renewable Fuel Standard Aggregate Compliance Approach Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA is issuing notice of receipt of a petition for EPA to authorize the use of an aggregate approach for compliance with the Renewable Fuel Standard renewable biomass provisions. This petition was submitted by the Government of Canada. The petition requests that EPA determine that an aggregate compliance approach will provide reasonable assurance that SUMMARY: Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 76, Number 50 (Tuesday, March 15, 2011)]
[Notices]
[Pages 14006-14007]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-6067]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the Government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: March 17, 2011; 10 a.m.

PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda.

    * Note --Items listed on the agenda may be deleted without 
further notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

                                                 968th--Meeting
----------------------------------------------------------------------------------------------------------------
        Item No.                     Docket No.                                    Company
----------------------------------------------------------------------------------------------------------------
                                                 Administrative
----------------------------------------------------------------------------------------------------------------
A-1.....................  AD02-1-000......................  Agency Business Matters.
A-2.....................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                             Operations.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1.....................  ER03-563-066....................  Devon Power LLC.
E-2.....................  OMITTED.                          ....................................................
E-3.....................  NP10-18-000.....................  North American Electric Reliability Corporation.

[[Page 14007]]

 
E-4.....................  RM09-18-001.....................  Revision to Electric Reliability Organization
                                                             Definition of Bulk Electric System.
E-5.....................  RM11-14-000.....................  Analysis of Horizontal Market Power under the
                                                             Federal Power Act.
E-6.....................  RM10-16-000.....................  System Restoration Reliability Standards.
E-7.....................  RM10-10-000.....................  Planning Resource Adequacy Assessment Reliability
                                                             Standard.
E-8.....................  RM10-15-000.....................  Mandatory Reliability Standards for Interconnection
                                                             Reliability Operating Limits.
E-9.....................  RM09-19-000.....................  Western Electric Coordinating Council Qualified
                                                             Transfer Path Unscheduled Flow Relief Regional
                                                             Reliability Standard.
E-10....................  RR09-6-003......................  North American Electric Reliability Corporation.
E-11....................  OMITTED.                          ....................................................
E-12....................  ER11-2256-000...................  California Independent System Operator Corporation.
E-13....................  EL08-47-006.....................  PJM Interconnection, L.L.C.
E-14....................  EL11-12-000.....................  Idaho Wind Partners 1, LLC.
E-15....................  EL10-1-001......................  Southern California Edison Company.
E-16....................  EL10-84-002.....................  Californians for Renewable Energy, Inc. v. Pacific
                                                             Gas and Electric Company, Southern California
                                                             Edison Company, San Diego Gas & Electric Company
                                                             and the California Public Utilities Commission.
----------------------------------------------------------------------------------------------------------------
                                                       Gas
----------------------------------------------------------------------------------------------------------------
G-1.....................  OMITTED.                          ....................................................
G-2.....................  RP11-1495-002...................  Ozark Gas Transmission, L.L.C.
G-3.....................  RP10-315-002....................  Columbia Gulf Transmission Company.
G-4.....................  OR07-7-000......................  Tesoro Refining and Marketing Company v. Calnev Pipe
                                                             Line LLC.
                          OR07-18-000.....................  America West Airlines, Inc. and US Airways, Inc.,
                                                             Chevron Products Company, Continental Airlines,
                                                             Inc., Southwest Airlines Co. and Valero Marketing
                                                             and Supply Company v. Calnev Pipe Line LLC.
                          OR07-19-000.....................  ConocoPhillips Co. v. Calnev Pipe Line LLC.
                          OR07-22-000.....................  BP West Coast Products, LLC v. Calnev Pipe Line LLC.
                          OR09-15-000.....................  Tesoro Refining and Marketing Company v. Calnev Pipe
                                                             Line LLC.
                          OR09-20-000.....................  BP West Coast Products, LLC v. Calnev Pipe Line LLC.
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1.....................  P-2539-061......................  Erie Boulevard Hydropower, L.P.
H-2.....................  P-2195-025......................  Portland General Electric Company.
H-3.....................  P-1390-063......................  Southern California Edison Company.
----------------------------------------------------------------------------------------------------------------
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1.....................  OMITTED.                          ....................................................
C-2.....................  CP10-492-000....................  Columbia Gas Transmission, LLC.
C-3.....................  OMITTED.                          ....................................................
C-4.....................  CP10-22-000.....................  Magnum Gas Storage, LLC, Magnum Solutions, LLC.
C-5.....................  CP10-486-000....................  Colorado Interstate Gas Company.
----------------------------------------------------------------------------------------------------------------


    Issued: March 10, 2011.
Kimberly D. Bose,
Secretary.

    A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its Webcast. The Capitol Connection provides technical 
support for the free Webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2011-6067 Filed 3-11-11; 11:15 am]
BILLING CODE 6717-01-P