Clinton Power Station Notice of Withdrawal of Application for Amendment to Facility Operating License, 12140 [2011-4984]

Download as PDF 12140 Federal Register / Vol. 76, No. 43 / Friday, March 4, 2011 / Notices Dated at Rockville, Maryland, this 23rd day of February 2011. For the Nuclear Regulatory Commission. Joseph G. Giitter, Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2011–4985 Filed 3–3–11; 8:45 am] BILLING CODE 7590–01–P amendment dated February 22, 2010, and the licensee’s letter dated February 22, 2011, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC’s Public Document Room (PDR), located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/ adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800–397–4209, or 301–415–4737 or by e-mail to pdr.resource@nrc.gov. amendment dated March 3, 2010, and the licensee’s letter dated February 22, 2011, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC’s Public Document Room (PDR), located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800– 397–4209, or 301–415–4737 or by e-mail to pdr.resource@nrc.gov. Dated at Rockville, Maryland, this 28th day of February 2011. For the Nuclear Regulatory Commission. Eva A. Brown, Senior Project Manager, Plant Licensing Branch III–2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. Dated at Rockville, Maryland, this 28th day of February 2011. For the Nuclear Regulatory Commission. Nicholas J. DiFrancesco, Project Manager, Plant Licensing Branch 3– 2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2011–4982 Filed 3–3–11; 8:45 am] discussed above, the NRC staff has determined that (1) The proposed exemption is authorized by law, (2) there is a reasonable assurance that the health and safety of the public will not be endangered by the proposed exemption, (3) such activities will be consistent with the Commission’s regulations and guidance, and (4) the issuance of the exemption will not endanger the common defense and security or the health and safety of the public. Pursuant to 10 CFR 51.32, ‘‘Finding of no significant impact,’’ the Commission has previously determined that the granting of this exemption will not have a significant effect on the quality of the human environment (76 FR 5408; January 31, 2011). This exemption is effective upon issuance. BILLING CODE 7590–01–P BILLING CODE 7590–01–P [Docket Nos. 50–373 and 50–374; NRC– 2011–0051] NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC Notice of Withdrawal of Application for Amendment to Facility Operating License jlentini on DSKJ8SOYB1PROD with NOTICES NUCLEAR REGULATORY COMMISSION [Docket No. 50–461; NRC–2011–0050] [FR Doc. 2011–4984 Filed 3–3–11; 8:45 am] The U.S. Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company, LLC (Exelon, or the licensee) to withdraw its February 22, 2010 application for proposed amendment to Facility Operating License No. NPF–11 and Facility Operating License No. NPF–18 for LaSalle County Station, Units 1 and 2, respectively, in LaSalle County, Illinois. The proposed amendment would have relocated selected Surveillance Requirement frequencies from the LaSalle County Station Units 1 and 2 Technical Specifications (TSs) to a licensee-controlled program. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on April 20, 2010 (75 FR 20637). However, by letter dated February 22, 2011, the licensee withdrew the proposed change. For further details with respect to this action, see the application for VerDate Mar<15>2010 19:16 Mar 03, 2011 Jkt 223001 PENSION BENEFIT GUARANTY CORPORATION Clinton Power Station Notice of Withdrawal of Application for Amendment to Facility Operating License The U.S. Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company, LLC, to withdraw its March 3, 2010 application for proposed amendment to Facility Operating License No. NPF–62 for the Clinton Power Station, Unit 1, located in DeWitt County, Illinois. The proposed amendment would have revised the Technical Specifications 3.1.7, to extend the completion time for Condition B (i.e., two standby liquid control subsystems inoperable) from 8 hours to 72 hours. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on May 4, 2010, 75 FR 23814. However, by letter dated February 22, 2011, the licensee withdrew the proposed change. For further details with respect to this action, see the application for PO 00000 Frm 00128 Fmt 4703 Sfmt 4703 Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery Pension Benefit Guaranty Corporation. ACTION: 30-Day notice of submission of information collection approval from the Office of Management and Budget and request for comments. AGENCY: As part of a Federal Government-wide effort to streamline the process to seek feedback from the public on service delivery, the Pension Benefit Guaranty Corporation (‘‘PBGC’’ or ‘‘the Agency’’) has submitted a Generic Information Collection Request (Generic ICR): ‘‘Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery’’ to OMB for approval under the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.). DATES: Comments must be submitted April 4, 2011. ADDRESSES: Written comments may be submitted to the Office of Information and Regulatory Affairs, Office of SUMMARY: E:\FR\FM\04MRN1.SGM 04MRN1

Agencies

[Federal Register Volume 76, Number 43 (Friday, March 4, 2011)]
[Notices]
[Page 12140]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-4984]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

 [Docket No. 50-461; NRC-2011-0050]


Clinton Power Station Notice of Withdrawal of Application for 
Amendment to Facility Operating License

    The U.S. Nuclear Regulatory Commission (NRC, the Commission) has 
granted the request of Exelon Generation Company, LLC, to withdraw its 
March 3, 2010 application for proposed amendment to Facility Operating 
License No. NPF-62 for the Clinton Power Station, Unit 1, located in 
DeWitt County, Illinois.
    The proposed amendment would have revised the Technical 
Specifications 3.1.7, to extend the completion time for Condition B 
(i.e., two standby liquid control subsystems inoperable) from 8 hours 
to 72 hours.
    The Commission had previously issued a Notice of Consideration of 
Issuance of Amendment published in the Federal Register on May 4, 2010, 
75 FR 23814. However, by letter dated February 22, 2011, the licensee 
withdrew the proposed change.
    For further details with respect to this action, see the 
application for amendment dated March 3, 2010, and the licensee's 
letter dated February 22, 2011, which withdrew the application for 
license amendment. Documents may be examined, and/or copied for a fee, 
at the NRC's Public Document Room (PDR), located at One White Flint 
North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland 20852. Publicly available records will be accessible 
electronically from the Agencywide Documents Access and Management 
System (ADAMS) Public Electronic Reading Room on the Internet at the 
NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do 
not have access to ADAMS or who encounter problems in accessing the 
documents located in ADAMS should contact the NRC PDR Reference staff 
by telephone at 1-800-397-4209, or 301-415-4737 or by e-mail to 
pdr.resource@nrc.gov.

    Dated at Rockville, Maryland, this 28th day of February 2011.

    For the Nuclear Regulatory Commission.
Nicholas J. DiFrancesco,
Project Manager, Plant Licensing Branch 3-2, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2011-4984 Filed 3-3-11; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.