Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment, 12101-12102 [2011-4967]
Download as PDF
Federal Register / Vol. 76, No. 43 / Friday, March 4, 2011 / Notices
Docket Numbers: RP11–1591–001.
Applicants: Golden Pass Pipeline
LLC.
Description: Golden Pass Pipeline
LLC submits tariff filing per 154.203:
Revised TRVs Include omitted tariff
record section titles to be effective 3/1/
2011.
Filed Date: 02/24/2011.
Accession Number: 20110224–5124.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 08, 2011.
jlentini on DSKJ8SOYB1PROD with NOTICES
Docket Numbers: CP97–738–010.
Applicants: Enogex LLC.
Description: Petition for order
amending limited jurisdiction of Enogex
LLC.
Filed Date: 02/04/2011.
Accession Number: 20110204–5095.
Comment Date: 5 p.m. Eastern Time
on Friday, March 04, 2011.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
5 p.m. Eastern time on the specified
comment date. Anyone filing a protest
must serve a copy of that document on
all the parties to the proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–4842 Filed 3–3–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:16 Mar 03, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 2
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP10–1189–002.
Applicants: Northwest Pipeline GP.
Description: Northwest Pipeline GP
submits tariff filing per 154.203: NWP
Index-Based Capacity Release to be
effective 4/1/2011.
Filed Date: 02/23/2011.
Accession Number: 20110223–5151.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: RP10–877–003.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Request of Cameron
Interstate Pipeline, LLC for Additional
Time to Make Compliance Filing.
Filed Date: 02/23/2011.
Accession Number: 20110223–5093.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: RP10–877–005.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Request of Cameron
Interstate Pipeline, LLC for Additional
Time to Make Compliance Filing.
Filed Date: 02/23/2011.
Accession Number: 20110223–5093.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: RP10–1400–003.
Applicants: Chandeleur Pipe Line
Company.
Description: Chandeleur Pipe Line
Company submits tariff filing per
154.203: Amendment to Order No. 714
Compliance Filing to be effective 11/1/
2010.
Filed Date: 02/17/2011.
Accession Number: 20110217–5052.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 01, 2011.
Docket Numbers: RP11–1700–001.
Applicants: Dominion Cove Point
LNG, LP.
Description: Dominion Cove Point
LNG, LP submits tariff filing per
154.203: DCP—Off-System Capacity—
Compliance to be effective 2/12/2011.
Filed Date: 02/22/2011.
Accession Number: 20110222–5016.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
12101
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
5 p.m. Eastern time on the specified
comment date. Anyone filing a protest
must serve a copy of that document on
all the parties to the proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 24, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–4840 Filed 3–3–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 12737–002]
Jordan Hydroelectric Limited
Partnership; Notice of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 447897), the
Office of Energy Projects has reviewed
the application for an original license
for the 3.7-megawatt (MW) Gathright
Hydroelectric Project located on the
Jackson River in Alleghany County,
Virginia, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyze the
potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major Federal
E:\FR\FM\04MRN1.SGM
04MRN1
12102
Federal Register / Vol. 76, No. 43 / Friday, March 4, 2011 / Notices
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access documents. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the EA should be filed
within 30 days from the issuance date
of this notice, and should be addressed
to the Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Room 1–A, Washington, DC
20426. Please affix ‘‘Gathright
Hydroelectric Project No. 12737–002’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
information contact Allyson Conner at
(202) 502–6082.
Dated: February 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–4967 Filed 3–3–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Project No. 13049–001]
jlentini on DSKJ8SOYB1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions to
Intervene, and Competing Applications
On January 31, 2011, Pacific Gas and
Electric Company (PG&E) filed an
application for a successive preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of developing
incremental capacity at PG&E’s licensed
Rock Creek-Cresta Project (No. 1962),
located on the North Fork Feather River
upstream of Lake Oroville, near the
towns of Belden, Tobin, and Storrie, in
Plumas County, California. The sole
purpose of a preliminary permit, if
VerDate Mar<15>2010
19:16 Mar 03, 2011
Jkt 223001
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new single-unit
powerhouse with a turbine and
generator constructed on the right (west)
abutment at the downstream side of the
existing Rock Creek dam. The proposed
project would have an expected
capacity of 2.8 megawatts and an
expected annual average energy
production of 15 gigawatt-hours.
Applicant Contact: Mr. Randal S.
Livingston, Vice President—Power
Generation, Pacific Gas and Electric
Company, 245 Market Street, MS N11E,
P.O. Box 770000, San Francisco, CA
94177; phone: (415) 973–6950.
FERC Contact: Matt Buhyoff; phone:
(202) 502–6824.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–1304913049–001) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
Dated: February 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–4969 Filed 3–3–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13994–000]
Public Utility No. 1 of Snohomish
County, WA; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 4, 2011, the Public Utility
No. 1 of Snohomish County,
Washington filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Hancock Creek Hydroelectric Project
(project) to be located on Hancock
Creek, near North Bend in King County,
Washington. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 7-foot-high, 62-footlong diversion weir and intake
structure; (2) an impoundment having a
total storage capacity of one acre-foot at
a normal maximum operating elevation
of 2,171 feet mean sea level; (3) a 7,800foot-long, 38-inch-diameter buried
penstock; (4) a 2,600-square-foot
powerhouse containing a single turbine/
generator unit with an installed capacity
of 6.0 megawatts; (5) a 125-foot-long, 10foot-wide rip-rap open channel tailrace;
(6) a switchyard containing a 4.16/34.5
three-phase step-up transformer; (7) a
2,000-foot-long, 34.5 kilovolt threephase buried transmission line; and (8)
appurtenant facilities. The estimated
annual generation of the project would
be 21,857.7 megawatt-hours.
Applicant Contact: Mr. Kim D. Moore,
Assistant General Manager of
Generation Resources; Public Utility No.
1 of Snohomish County; 2320 California
Street; Everett, WA 98201; phone: 425–
783–8606.
FERC Contact: Kelly Wolcott; phone:
(202) 502–6480.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 76, Number 43 (Friday, March 4, 2011)]
[Notices]
[Pages 12101-12102]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-4967]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 12737-002]
Jordan Hydroelectric Limited Partnership; Notice of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 447897), the Office of Energy Projects has
reviewed the application for an original license for the 3.7-megawatt
(MW) Gathright Hydroelectric Project located on the Jackson River in
Alleghany County, Virginia, and has prepared an Environmental
Assessment (EA). In the EA, Commission staff analyze the potential
environmental effects of licensing the project and conclude that
issuing a license for the project, with appropriate environmental
measures, would not constitute a major Federal
[[Page 12102]]
action significantly affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access documents. For assistance, contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for
TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Comments on the EA should be filed within 30 days from the issuance
date of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Gathright Hydroelectric Project
No. 12737-002'' to all comments. Comments may be filed electronically
via Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site under the ``eFiling'' link. For further
information contact Allyson Conner at (202) 502-6082.
Dated: February 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-4967 Filed 3-3-11; 8:45 am]