Public Notice for Waiver of Aeronautical Land-Use Assurance Holmes County Airport, Millersburg, OH, 10937-10938 [2011-4224]
Download as PDF
Federal Register / Vol. 76, No. 39 / Monday, February 28, 2011 / Notices
between Brunei Darussalam and
Malaysia (Memo 1414). Intended
effective date: 1 February 2011.
Docket Number: DOT–OST–2011–
0015.
Date Filed: January 24, 2011.
Parties: Members of the International
Air Transport Association.
Subject: Mail Vote 632—Flex Fares
ResolutionsTC1 Caribbean, Longhaul,
Within South America-Tariffs, 8–17
March 2010 (Memo 0395). r1 041ee.
Intended effective date: for travel
on/after 1 July 2010.
Renee V. Wright,
Program Manager, Docket Operations,
Federal Register Liaison.
[FR Doc. 2011–3974 Filed 2–25–11; 8:45 am]
BILLING CODE 4910–9X–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
acres of Federally obligated property at
the Gwinnett County Airport. The
property will be released for purchase of
compatible, industrial development.
The net proceeds from the sale of this
property will be used for airport
purposes. The proposed use of this
property is compatible with airport
operations.
Any person may inspect the request
in person at the FAA office listed above
under FOR FURTHER INFORMATION
CONTACT.
In addition, any person may, upon
request, inspect the request, notice and
other documents germane to the request
in person at the Gwinnett County
Airport Authority.
Issued in Atlanta, Georgia, on February 15,
2011.
Scott L. Seritt,
Manager, Atlanta Airports District Office,
Southern Region.
[FR Doc. 2011–4225 Filed 2–25–11; 8:45 am]
BILLING CODE 4910–13–M
Notice of Opportunity for Public
Comment on Release of Federally
Obligated Property at Gwinnett County
Airport, Lawrenceville, GA
Federal Aviation Administration
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice.
AGENCY:
Under the provisions of Title
49, U.S.C. Section 47153(c), notice is
being given that the FAA is considering
a request from the Gwinnett County
Airports Authority to waive the
requirement that a 0.46-acre parcel of
Federally obligated property, located at
the Gwinnett County Airport, be used
for aeronautical purposes.
DATES: Comments must be received on
or before March 30, 2011.
ADDRESSES: Comments on this notice
may be mailed or delivered in triplicate
to the FAA at the following address:
Atlanta Airports District Office, Attn:
Lisa Favors, Program Manager, 1701
Columbia Ave., Suite 2–260, Atlanta,
GA 30337–2747.
In addition, one copy of any
comments submitted to the FAA must
be mailed or delivered to Matthew L.
Smith, Airport Director at the following
address: 600 Briscoe Boulevard,
Lawrenceville, GA 30046–4680.
FOR FURTHER INFORMATION CONTACT: Lisa
Favors, Program Manager, Atlanta
Airports District Office, 1701 Columbia
Ave., Campus Bldg., Suite 2–260,
College Park, GA 30337, (404) 305–
7145. The application may be reviewed
in person at this same location.
SUPPLEMENTARY INFORMATION: The FAA
is reviewing a request by the Gwinnett
County Airport Authority to release 0.46
srobinson on DSKHWCL6B1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
18:30 Feb 25, 2011
Jkt 223001
DEPARTMENT OF TRANSPORTATION
Public Notice for Waiver of
Aeronautical Land-Use Assurance
Holmes County Airport, Millersburg,
OH
Federal Aviation
Administration, DOT.
ACTION: Notice of intent of waiver with
respect to land.
AGENCY:
The Federal Aviation
Administration (FAA) is considering a
proposal to change a portion of the
airport from aeronautical use to nonaeronautical use and to authorize the
sale of the airport property. The
proposal consists of the sale of vacant
land, containing trees, brush, wetland,
and streams owned by the Holmes
County Airport Authority. Parcel #8A is
approximately 14.000 acres. The land
was acquired under grant 3–39–0056–
0607. There are no impacts to the
airport by allowing the airport to
dispose of the property. The proposed
land for release is vacant, not required
for future development, safety, or
compatible land use. The intended land
use is to remain vacant. Approval does
not constitute a commitment by the
FAA to financially assist in the disposal
of the subject airport property nor a
determination of eligibility for grant-inaid funding from the FAA. The
disposition of proceeds from the
disposal of the airport property will be
in accordance with FAA’s Policy and
Procedures Concerning the Use of
SUMMARY:
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
10937
Airport Revenue, published in the
Federal Register on February 16, 1999.
In accordance with section 47107(h)
of title 49, United States Code, this
notice is required to be published in the
Federal Register 30 days before
modifying the land-use assurance that
requires the property to be used for an
aeronautical purpose.
DATES: Comments must be received on
or before March 30, 2011.
FOR FURTHER INFORMATION CONTACT: Alex
Erskine, Program Manager, Detroit
Airports District Office, 11677 South
Wayne Road, Suite 107, Romulus,
Michigan 48174. Telephone Number:
(734) 229–2927/FAX Number: (734)
229–2950. Documents reflecting this
FAA action may be reviewed at this
same location or at Holmes County
Airport, Millersburg, Ohio.
SUPPLEMENTARY INFORMATION: Following
is a legal description of the property
located in Hardy Township, County of
Holmes, State of Ohio, and described as
follows:
(Legal Description of Property).
Being a part of Lot 17 of the Third
Quarter, Hardy Township, T–9 N, R–7
W, Holmes County, Ohio, also known as
part of the lands conveyed to Holmes
County Regional Airport Authority in
Deed vol. 236 page 228.
Described as follows:
Commencing at a 5⁄8 inch rebar found
marking the southeast corner of said Lot
17, thence N 03 degrees 03′25″ E 527.97
feet along the lot line to a 5⁄8 inch rebar
found the TRUE POINT OF
BEGINNING, thence with the following
FOUR (4) COURSES:
(1) N 88 degrees 01′04″ W 2648.97 feet
along Thomas K. Bird, Trustee (O.R. vol.
66 page 22) and Cheryl L. Bird, Trustee
(O.R. vol. 66 page 43) and Wilmer A.
and Sharon R. Coblentz (O.R. vol. 16
page 689 and O.R. vol. 76 page 464) and
Edward A. and Teresa L. Braun (O.R.
vol. 76 page 466) and Teresa L. Braun
(O.R. vol. 76 page 468) and Barry and
Deborah J. Walton’s (O.R. vol. 76 page
462) north line to a 5 inch rebar found
on the lot line;
(2) N 01 degrees 57′43″ E 230.03 feet
along the lot line to an iron pin set;
(3) S 88 degrees 01′04′ E 2653.37 feet
through the lands of said Holmes
County Regional Airport Authority to an
iron pin set on the lot line;
(4) S 03 degrees 03′251 W 230.07 feet
along the lot line to the TRUE POINT
OF BEGINNING.
This parcel contains 14.000 acres, but
subject to all easements of record.
Note to go to adjoiner only.
Bearings from Geodetic North.
According to a survey made and
description prepared by Donald C.
Baker, P.S. 6938, December 17, 2010.
E:\FR\FM\28FEN1.SGM
28FEN1
10938
Federal Register / Vol. 76, No. 39 / Monday, February 28, 2011 / Notices
Issued in Romulus, Michigan, on January
21, 2011.
John L. Mayfield Jr.,
Manager, Detroit Airports District Office,
FAA, Great Lakes Region.
[FR Doc. 2011–4224 Filed 2–25–11; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice To Rescind a Notice of Intent To
Prepare an Environmental Impact
Statement: King County, WA
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice to rescind a Notice of
Intent to prepare an Environmental
Impact Statement.
AGENCY:
The FHWA is issuing this
notice to advise the public that we are
rescinding the Notice of Intent (NOI) to
prepare an Environmental Impact
Statement (EIS) for improvements that
were proposed for Forest Road 56 in
King County, Washington northeast of
the city of North Bend. The NOI was
published in the Federal Register on
April 27, 2001. This rescission is based
on a reduction in the scope of the
project.
FOR FURTHER INFORMATION CONTACT:
Michael Traffalis, Project Manager,
FHWA, Western Federal Lands Highway
Division, 610 East Fifth Street,
Vancouver, Washington 98611,
Telephone: (360) 619–7700.
SUPPLEMENTARY INFORMATION: The
FHWA, in cooperation with the United
States Forest Service and King County,
is rescinding the NOI to prepare an EIS
for a project that had been proposed to
improve Forest Road 56, Middle Fork
Snoqualmie River Road, in King County,
Washington. The NOI is being rescinded
because the scope of the project has
been reduced from the 2001 proposal to
examine new alignments and wider
road widths up to 32 feet. Due to
potential environmental impacts
associated with new alignments and
wider widths, as well as funding
constraints, the currently proposed
project would reconstruct the road and
associated features along its current
alignment to a consistent width of 20
feet. The currently proposed project
extends approximately 9.7 miles from
milepost 2.7, just past the couplet
portion of the route, to the Middle Fork
Campground at approximately milepost
12.4, within the Mt. Baker-Snoqualmie
National Forest.
Given the reduction in scope and the
associated potential impacts of the
srobinson on DSKHWCL6B1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
18:30 Feb 25, 2011
Jkt 223001
proposed action, FHWA intends to
prepare an Environmental Assessment
to determine if the project has the
potential to significantly affect the
quality of the human environment.
final agency action subject to 23 U.S.C.
139(l)(1) by issuing a Record of Decision
for the following highway project in the
State of Oregon: Sunrise Project, I–205
to Rock Creek Junction on February 22,
2011. The project will be part of the
Authority: 23 U.S.C. 315; 49 CFR 1.48.
State highway network, as defined in
Dated: February 17, 2011.
the Oregon Highway Plan, connecting I–
Clara H. Conner,
205, the Milwaukie Expressway and OR
Division Engineer, Western Federal Lands
212/224. The highway, on new
Highway Division, FHWA.
alignment, will provide six through
[FR Doc. 2011–4303 Filed 2–25–11; 8:45 am]
lanes plus two auxiliary lanes. The
Sunrise Project will become the
BILLING CODE 4910–22–P
designated OR 212/224, with the
existing OR212/224 becoming a county
DEPARTMENT OF TRANSPORTATION arterial. The actions by the Federal
agencies and the laws under which such
Federal Highway Administration
actions were taken are described in the
Record of Decision issued on February
Notice of Final Federal Agency Actions
22, 2011; the Final Environmental
on Sunrise Project, I–205 to Rock
Impact Statement issued on December
Creek Junction: Clackamas County,
23, 2010, and in other documents in the
OR
FHWA project records. The Record of
Decision, Final Environmental Impact
AGENCY: Federal Highway
Statement and other project records are
Administration (FHWA), DOT.
available by contacting the FHWA at the
ACTION: Notice of Limitations on Claims
address provided above. The Record of
for Judicial Review of Actions by
Decision and Final Environmental
FHWA.
Impact Statement can be viewed and
SUMMARY: This notice announces actions downloaded from the project Web site
taken by the FHWA that are final within at: https://www.sunrise-project.org. This
the meaning of 23 U.S.C. 139(l)(1). The
notice applies to all Federal agency
actions relate to a proposed highway
decisions as of the issuance date of this
project, Sunrise Project, I–205 to Rock
notice and all laws under which such
Creek Junction, Clackamas County,
actions were taken, including but not
Oregon. This action grants approval for
limited to:
the project.
1. General: National Environmental
DATES: By this notice, the FHWA is
Policy Act (NEPA) [42 U.S.C. 4321–
advising the public of final agency
4347]; Federal-Aid Highway Act [23
actions subject to 23 U.S.C. 139(l)(1). A
U.S.C. 109 and 23 U.S.C. 128].
2. Air: Clean Air Act [42 U.S.C. 7401–
claim seeking judicial review of the
7671(q)].
Federal agency actions on the highway
3. Land: Section 4(f) of the
project will be barred unless the claim
Department of Transportation Act of
is filed on or before August 27, 2011. If
1966 [23 U.S.C. 1536 and 49 U.S.C.
the Federal law that authorizes judicial
review of a claim provides a time period 303].
4. Wildlife: Section 7 of the
of less than 180 days for filing such
claim, then that shorter time period still Endangered Species Act [16 U.S.C.
1536]; Fish and Wildlife Coordination
applies.
Act [16 U.S.C. 661–667(d)]; Migratory
FOR FURTHER INFORMATION CONTACT:
Michelle Eraut, Environmental Program Bird Treaty Act [16 U.S.C. 703–712].
5. Historic and Cultural Resources:
Manager, Federal Highway
Section 106 of the National Historic
Administration, 530 Center Street, NE.,
Preservation Act of 1966, as amended
Suite 100, Salem, Oregon 97301,
Telephone: (503) 587–4716. The Sunrise [16 U.S.C. 470f].
6. Social and Economic: Title VI of
Project, I–205 to Rock Creek Junction
the Civil Rights Act of 1964 [42 U.S.C.
Final Environmental Impact Statement,
2000(d) et seq.]; Farmland Protection
Record of Decision and other project
Policy Act (FPPA) [7 U.S.C. 4201–4209].
records are available upon written
7. Wetlands and Water Resources:
request from the Federal Highway
Clean Water Act [33 U.S.C. 1251–1377];
Administration at the address shown
Rivers and Harbors Act of 1899 [33
above. Comments or questions
U.S.C. 401–406]; Wetlands Mitigation
concerning the Sunrise Project, I–205 to [23 U.S.C. 103(b)(6)(M) and 133(b)(11)];
Rock Creek Junction should be directed
Flood Disaster Protection Act [42 U.S.C.
to the FHWA at the address provided
4001–4128].
above.
8. Executive Orders: E.O. 11990
Protection of Wetlands; E.O. 11988
SUPPLEMENTARY INFORMATION: Notice is
Floodplain Management; E.O. 12898,
hereby given that the FHWA has taken
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 76, Number 39 (Monday, February 28, 2011)]
[Notices]
[Pages 10937-10938]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-4224]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Public Notice for Waiver of Aeronautical Land-Use Assurance
Holmes County Airport, Millersburg, OH
AGENCY: Federal Aviation Administration, DOT.
ACTION: Notice of intent of waiver with respect to land.
-----------------------------------------------------------------------
SUMMARY: The Federal Aviation Administration (FAA) is considering a
proposal to change a portion of the airport from aeronautical use to
non-aeronautical use and to authorize the sale of the airport property.
The proposal consists of the sale of vacant land, containing trees,
brush, wetland, and streams owned by the Holmes County Airport
Authority. Parcel 8A is approximately 14.000 acres. The land
was acquired under grant 3-39-0056-0607. There are no impacts to the
airport by allowing the airport to dispose of the property. The
proposed land for release is vacant, not required for future
development, safety, or compatible land use. The intended land use is
to remain vacant. Approval does not constitute a commitment by the FAA
to financially assist in the disposal of the subject airport property
nor a determination of eligibility for grant-in-aid funding from the
FAA. The disposition of proceeds from the disposal of the airport
property will be in accordance with FAA's Policy and Procedures
Concerning the Use of Airport Revenue, published in the Federal
Register on February 16, 1999.
In accordance with section 47107(h) of title 49, United States
Code, this notice is required to be published in the Federal Register
30 days before modifying the land-use assurance that requires the
property to be used for an aeronautical purpose.
DATES: Comments must be received on or before March 30, 2011.
FOR FURTHER INFORMATION CONTACT: Alex Erskine, Program Manager, Detroit
Airports District Office, 11677 South Wayne Road, Suite 107, Romulus,
Michigan 48174. Telephone Number: (734) 229-2927/FAX Number: (734) 229-
2950. Documents reflecting this FAA action may be reviewed at this same
location or at Holmes County Airport, Millersburg, Ohio.
SUPPLEMENTARY INFORMATION: Following is a legal description of the
property located in Hardy Township, County of Holmes, State of Ohio,
and described as follows:
(Legal Description of Property).
Being a part of Lot 17 of the Third Quarter, Hardy Township, T-9 N,
R-7 W, Holmes County, Ohio, also known as part of the lands conveyed to
Holmes County Regional Airport Authority in Deed vol. 236 page 228.
Described as follows:
Commencing at a \5/8\ inch rebar found marking the southeast corner
of said Lot 17, thence N 03 degrees 03'25'' E 527.97 feet along the lot
line to a \5/8\ inch rebar found the TRUE POINT OF BEGINNING, thence
with the following FOUR (4) COURSES:
(1) N 88 degrees 01'04'' W 2648.97 feet along Thomas K. Bird,
Trustee (O.R. vol. 66 page 22) and Cheryl L. Bird, Trustee (O.R. vol.
66 page 43) and Wilmer A. and Sharon R. Coblentz (O.R. vol. 16 page 689
and O.R. vol. 76 page 464) and Edward A. and Teresa L. Braun (O.R. vol.
76 page 466) and Teresa L. Braun (O.R. vol. 76 page 468) and Barry and
Deborah J. Walton's (O.R. vol. 76 page 462) north line to a \5\8\ inch
rebar found on the lot line;
(2) N 01 degrees 57'43'' E 230.03 feet along the lot line to an
iron pin set;
(3) S 88 degrees 01'04' E 2653.37 feet through the lands of said
Holmes County Regional Airport Authority to an iron pin set on the lot
line;
(4) S 03 degrees 03'251 W 230.07 feet along the lot line to the
TRUE POINT OF BEGINNING.
This parcel contains 14.000 acres, but subject to all easements of
record.
Note to go to adjoiner only.
Bearings from Geodetic North.
According to a survey made and description prepared by Donald C.
Baker, P.S. 6938, December 17, 2010.
[[Page 10938]]
Issued in Romulus, Michigan, on January 21, 2011.
John L. Mayfield Jr.,
Manager, Detroit Airports District Office, FAA, Great Lakes Region.
[FR Doc. 2011-4224 Filed 2-25-11; 8:45 am]
BILLING CODE 4910-13-P