Download as PDF 10582 Federal Register / Vol. 76, No. 38 / Friday, February 25, 2011 / Notices eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 17, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–4233 Filed 2–24–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13015–001] srobinson on DSKHWCL6B1PROD with NOTICES Town of Edgartown; Notice of Public/ Technical Meeting To Discuss Information and Monitoring Needs for a License Application for a Pilot Project a. Type of Application: Draft Pilot License Application. b. Project No.: 13015–001. c. Applicant: Town of Edgartown (Edgartown). d. Name of Project: Muskeget Channel Tidal Energy Project. e. Location: In Muskeget Channel, between the islands of Martha’s Vineyard and Nantucket, Dukes County, Massachusetts. f. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. g. Applicant Contact: Ms. Pamela Dolby, Town Administrator, Town of Edgartown, 70 Main Street, Edgartown, MA 02539; (508) 627–6180. h. FERC Contact: Michael Watts, phone: (202) 502–6123, e-mail: Michael.watts@ferc.gov. i. Project Description: The proposed Muskeget Channel Tidal Energy Project would consist of: (1) 13 commercially VerDate Mar<15>2010 16:39 Feb 24, 2011 Jkt 223001 operated OCGenTM horizontal hydrokinetic cross-flow turbine generation units with a total installed capacity of 5 megawatts, and one experimental turbine unit that would be used to test various tidal energy technologies; (2) a mooring and anchoring system attached to each unit consisting of four mooring lines, an anchor, and a clump weight; (3) two alternative submarine cable routes consisting of a either a 3.5-mile-long, or a 5-mile-long submarine cable with two 13.8-kilovolt (kv) transmission lines and a 4.0-kv transmission line connecting the turbine generation units to an onshore substation located either in the Chappaquiddick or Katama sections of Edgartown; (4) two alternative onshore transmission line routes consisting of a 34.5 kv transmission line connecting either the Chappaquiddick or Katama onshore substation to an existing distribution line in Edgartown; and (5) appurtenant facilities. The project would have an average annual generation of 10.95 gigawatt-hours. j. Licensing Process: On February 1, 2011, Edgartown filed a Notice of Intent and request for waivers of certain regulations of the Federal Energy Regulatory Commission’s (Commission) Integrated Licensing Process to expedite processing of a license application for the Muskeget Channel Tidal Energy Pilot Project. Edgartown expects to file a final license application for a pilot project with the Commission by February 15, 2012. k. Notice Purpose: The purpose of this notice is to inform you of the opportunity to participate in the upcoming joint public/technical meeting with Massachusetts Environmental Policy Act (MEPA) Office, Commission staff, and Edgartown.1 The purpose of the meeting is to discuss information and monitoring needs for the final license application and to provide a public consultation session for the purposes of MEPA review and scoping of the Environmental Impact Report (EIR). All interested individuals, organizations, and agencies are invited to attend the meeting. The time and location of the meeting is as follows: Meeting Schedule and Location Meeting Monday, March 7, 2011, 11 a.m. (local time). Edgartown Town Hall, 70 Main Street, Edgartown, MA 02539. 1 In order to coordinate the State and Federal reviews of the project, this meeting is being held in lieu of the May 1, 2011, technical meeting listed in the Commission’s notice issued on February 8, 2011. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 A land-based site visit to the proposed cable landfall location(s) will take place after the meeting. Anyone in need of directions may contact Mr. Stephen Barrett at: (781) 852 3125, or via e-mail at: sbarrett@hmmh.com. To help focus discussions, Commission staff encourages participants to review Edgartown’s draft pilot license application and monitoring plans filed with the Commission on February 1, 2011. These materials are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number P–13015– 001 to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support. l. Meeting Objectives: At the technical meeting, Commission staff will focus the discussion on the information gaps that need to be addressed to ensure that sufficient information exists for the Commission to make a determination on whether the proposed project meets the criteria for a pilot project and for processing a license application for a pilot project upon its filing with the Commission. m. MEPA Review: Edgartown filed an expanded Environmental Notification Form (ENF) for the Muskeget Channel Tidal Energy Project with the MEPA Office. Edgartown is requesting a single Environmental Impact Report (EIR) rather than the typical two-stage draft and final EIR. The expanded ENF was noticed in the February 9, 2011, issue of the Environmental Monitor. https:// www.env.state.ma.us/mepa/ emonitor.aspx. Any agency or person may comment on the expanded ENF and the proposed project, including: feasible alternatives, potential environmental impacts, potential mitigation measures, and what additional information and analysis to require in the scope for the EIR. A MEPA public consultation session will be held on March 7, 2011, in conjunction with the Commission’s technical meeting. Written comments on the ENF must be sent to the MEPA office by March 17, 2011. Please mail your comments to: E:\FR\FM\25FEN1.SGM 25FEN1 10583 Federal Register / Vol. 76, No. 38 / Friday, February 25, 2011 / Notices Secretary Richard K. Sullivan, Executive Office of Energy and Environmental Affairs, Attn: MEPA Office [Aisling O’ Shea], EEA No. 14696, 100 Cambridge Street, Suite 900, Boston, MA 02114. To send comments by e-mail or fax, or for questions regarding the MEPA process, contact Aisling O’Shea, MEPA Analyst at: e-mail: aisling.o’shea@state.ma.us; Fax: (617) 626–1181 or Phone: (617) 626–1024. In addition, please file a copy of your comments with the Federal Energy Regulatory Commission. Your comments may be filed electronically via the Internet (instructions are on the Commission’s Web site at: https:// www.ferc.gov/docs-filing/efiling.asp). For assistance, please contact FERC Online Support at FERCOnlinesupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although FERC strongly encourages electronic filing, your comments may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please put the docket number, P– 13015–001 on the first page of your response. n. Procedures: The meetings will be recorded by a stenographer and will become part of the formal record of the Commission proceeding on the project. Dated: February 18, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–4263 Filed 2–24–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD11–6–000] srobinson on DSKHWCL6B1PROD with NOTICES Priorities for Addressing Risks to the Reliability of the Bulk-Power System; Notice Establishing Date for Comments On February 8, 2011, the Federal Energy Regulatory Commission convened a Commissioner-led technical conference regarding priorities for addressing risks to the reliability of the Bulk-Power System, as previously announced.1 Any entity or person wishing to submit written comments regarding the matters discussed at that 1 Notice of Technical Conference re Priorities for Addressing Risks to the Reliability of the BulkPower System, 76 FR 2369 (January 13, 2011), as supplemented by the Reliability Technical Conference Agenda issued January 7, 2011. VerDate Mar<15>2010 16:39 Feb 24, 2011 Jkt 223001 technical conference should submit such comments in this docket, AD11–6– 000, on or before March 21, 2011. Dated: February 17, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–4262 Filed 2–24–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the-Record Communications; Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication, and may request that the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications are included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e)(1)(v). PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 The following is a list of off-therecord communications recently received by the Secretary of the Commission. The communications listed are grouped by docket numbers in ascending order. These filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, please contact FERC, Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Docket No. Exempt: 1. CP11–31– 000. 2. Project No. 2232–000. 3. Project No. 2615–000. 4. Project No. 2851–000. 5. Project No. 12965. File date 2–14–11 2–8–11 2–10–11 2–15–11 2–8–11 Presenter or requester Gertrude Johnson.1 Hon. Mick Mulvaney. Samantha Davidson.2 Mary Lewallen.3 Penni Borghi.4 1 Record of conference call. record. exchange. 4 E-mail exchange record. 2 Telephone 3 E-mail Dated: February 17, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–4234 Filed 2–24–11; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8995–6] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 02/14/2011 through 02/18/2011 Pursuant to 40 CFR 1506.9 Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment E:\FR\FM\25FEN1.SGM 25FEN1

Agencies

[Federal Register Volume 76, Number 38 (Friday, February 25, 2011)]
[Notices]
[Pages 10582-10583]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-4263]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13015-001]


Town of Edgartown; Notice of Public/Technical Meeting To Discuss 
Information and Monitoring Needs for a License Application for a Pilot 
Project

    a. Type of Application: Draft Pilot License Application.
    b. Project No.: 13015-001.
    c. Applicant: Town of Edgartown (Edgartown).
    d. Name of Project: Muskeget Channel Tidal Energy Project.
    e. Location: In Muskeget Channel, between the islands of Martha's 
Vineyard and Nantucket, Dukes County, Massachusetts.
    f. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    g. Applicant Contact: Ms. Pamela Dolby, Town Administrator, Town of 
Edgartown, 70 Main Street, Edgartown, MA 02539; (508) 627-6180.
    h. FERC Contact: Michael Watts, phone: (202) 502-6123, e-mail: 
Michael.watts@ferc.gov.
    i. Project Description: The proposed Muskeget Channel Tidal Energy 
Project would consist of: (1) 13 commercially operated OCGen\TM\ 
horizontal hydrokinetic cross-flow turbine generation units with a 
total installed capacity of 5 megawatts, and one experimental turbine 
unit that would be used to test various tidal energy technologies; (2) 
a mooring and anchoring system attached to each unit consisting of four 
mooring lines, an anchor, and a clump weight; (3) two alternative 
submarine cable routes consisting of a either a 3.5-mile-long, or a 5-
mile-long submarine cable with two 13.8-kilovolt (kv) transmission 
lines and a 4.0-kv transmission line connecting the turbine generation 
units to an onshore substation located either in the Chappaquiddick or 
Katama sections of Edgartown; (4) two alternative onshore transmission 
line routes consisting of a 34.5 kv transmission line connecting either 
the Chappaquiddick or Katama onshore substation to an existing 
distribution line in Edgartown; and (5) appurtenant facilities. The 
project would have an average annual generation of 10.95 gigawatt-
hours.
    j. Licensing Process: On February 1, 2011, Edgartown filed a Notice 
of Intent and request for waivers of certain regulations of the Federal 
Energy Regulatory Commission's (Commission) Integrated Licensing 
Process to expedite processing of a license application for the 
Muskeget Channel Tidal Energy Pilot Project. Edgartown expects to file 
a final license application for a pilot project with the Commission by 
February 15, 2012.
    k. Notice Purpose: The purpose of this notice is to inform you of 
the opportunity to participate in the upcoming joint public/technical 
meeting with Massachusetts Environmental Policy Act (MEPA) Office, 
Commission staff, and Edgartown.\1\ The purpose of the meeting is to 
discuss information and monitoring needs for the final license 
application and to provide a public consultation session for the 
purposes of MEPA review and scoping of the Environmental Impact Report 
(EIR). All interested individuals, organizations, and agencies are 
invited to attend the meeting. The time and location of the meeting is 
as follows:
---------------------------------------------------------------------------

    \1\ In order to coordinate the State and Federal reviews of the 
project, this meeting is being held in lieu of the May 1, 2011, 
technical meeting listed in the Commission's notice issued on 
February 8, 2011.
---------------------------------------------------------------------------

Meeting Schedule and Location

Meeting

Monday, March 7, 2011, 11 a.m. (local time). Edgartown Town Hall, 70 
Main Street, Edgartown, MA 02539.

    A land-based site visit to the proposed cable landfall location(s) 
will take place after the meeting.
    Anyone in need of directions may contact Mr. Stephen Barrett at: 
(781) 852 3125, or via e-mail at: sbarrett@hmmh.com.
    To help focus discussions, Commission staff encourages participants 
to review Edgartown's draft pilot license application and monitoring 
plans filed with the Commission on February 1, 2011. These materials 
are available for review at the Commission in the Public Reference Room 
or may be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number P-13015-001 to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
please contact FERC Online Support.
    l. Meeting Objectives: At the technical meeting, Commission staff 
will focus the discussion on the information gaps that need to be 
addressed to ensure that sufficient information exists for the 
Commission to make a determination on whether the proposed project 
meets the criteria for a pilot project and for processing a license 
application for a pilot project upon its filing with the Commission.
    m. MEPA Review: Edgartown filed an expanded Environmental 
Notification Form (ENF) for the Muskeget Channel Tidal Energy Project 
with the MEPA Office. Edgartown is requesting a single Environmental 
Impact Report (EIR) rather than the typical two-stage draft and final 
EIR. The expanded ENF was noticed in the February 9, 2011, issue of the 
Environmental Monitor. https://www.env.state.ma.us/mepa/emonitor.aspx.
    Any agency or person may comment on the expanded ENF and the 
proposed project, including: feasible alternatives, potential 
environmental impacts, potential mitigation measures, and what 
additional information and analysis to require in the scope for the 
EIR. A MEPA public consultation session will be held on March 7, 2011, 
in conjunction with the Commission's technical meeting. Written 
comments on the ENF must be sent to the MEPA office by March 17, 2011. 
Please mail your comments to:


[[Page 10583]]


Secretary Richard K. Sullivan, Executive Office of Energy and 
Environmental Affairs, Attn: MEPA Office [Aisling O' Shea], EEA No. 
14696, 100 Cambridge Street, Suite 900, Boston, MA 02114.

    To send comments by e-mail or fax, or for questions regarding the 
MEPA process, contact Aisling O'Shea, MEPA Analyst at: e-mail: 
aisling.o'shea@state.ma.us; Fax: (617) 626-1181 or Phone: (617) 626-
1024.
    In addition, please file a copy of your comments with the Federal 
Energy Regulatory Commission. Your comments may be filed electronically 
via the Internet (instructions are on the Commission's Web site at: 
https://www.ferc.gov/docs-filing/efiling.asp). For assistance, please 
contact FERC Online Support at FERCOnlinesupport@ferc.gov; call toll-
free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although 
FERC strongly encourages electronic filing, your comments may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Please put the docket number, 
P-13015-001 on the first page of your response.
    n. Procedures: The meetings will be recorded by a stenographer and 
will become part of the formal record of the Commission proceeding on 
the project.

    Dated: February 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-4263 Filed 2-24-11; 8:45 am]
BILLING CODE 6717-01-P