Combined Notice of Filings #1, 10347-10348 [2011-4106]
Download as PDF
Federal Register / Vol. 76, No. 37 / Thursday, February 24, 2011 / Notices
mail FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Accession Number: 20110211–0201.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 03, 2011.
Dated: February 16, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2011–4110 Filed 2–23–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
emcdonald on DSK2BSOYB1PROD with NOTICES
Combined Notice of Filings # 1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–43–000.
Applicants: KGEN Murray I and II
LLC.
Description: Application for Order
Authorizing the Disposition of
Jurisdictional Facilities Under Section
203 of the Federal Power Act and
Request for Waivers and Expedited
Action and Shortened Comment Period
of KGEN Murray I and II LLC.
Filed Date: 02/11/2011.
Accession Number: 20110211–5102.
Comment Date: 5 p.m. Eastern Time
on Friday, March 04, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2872–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii): Revised IFA and SA
for Victorville’s SCLA Development to
be effective 4/12/2011.
Filed Date: 02/10/2011.
Accession Number: 20110210–5161.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 03, 2011.
Docket Numbers: ER11–2873–000.
Applicants: FPL Energy South Dakota
Wind, LLC.
Description: FPL Energy South Dakota
Wind, LLC submits tariff filing per
35.15: ER10–1929 Cancellation of Tariff
ID_FINAL to be effective 2/11/2011.
Filed Date: 02/10/2011.
Accession Number: 20110210–5164.
Comment Date: 5 p.m. Eastern Time
on Thursday, March 03, 2011.
Docket Numbers: ER11–2874–000.
Applicants: Allegheny Energy Supply
Company, LLC.
Description: Allegheny Energy Supply
Company, LLC submits request for
authorization to make wholesale power
sales to its affiliate etc.
Filed Date: 02/10/2011.
VerDate Mar<15>2010
18:02 Feb 23, 2011
Jkt 223001
Dated: February 11, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–4107 Filed 2–23–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
10347
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER96–1947–029;
ER00–3696–015; ER07–1000–008;
ER10–450–003.
Applicants: Las Vegas Power
Company, LLC, Griffith Energy LLC, LS
Power Marketing, LLC, Arlington
Valley, LLC.
Description: Second Supplement to
Updated Market Power Analysis.
Filed Date: 02/11/2011.
Accession Number: 20110211–5137.
Comment Date: 5 p.m. Eastern Time
on Friday, March 04, 2011.
Docket Numbers: ER10–2393–000;
ER10–2393–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc’s
response to the Commission’s letter
dated January 11, 2011 seeking
additional information and amendment
to compliance filing dated 8/25/10.
Filed Date: 02/14/2011.
Accession Number: 20110214–5150.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: ER11–2496–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.17(b):
Midwest ISO PJM JOA Amendment to
be effective 9/17/2010.
Filed Date: 02/15/2011.
Accession Number: 20110215–5016.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 08, 2011.
Docket Numbers: ER11–2882–000.
Applicants: ReEnergy Sterling CT
Limited Partnership.
Description: ReEnergy Sterling CT
Limited Partnership submits tariff filing
per 35.1: ReEnergy Sterling CT LP
Notice of Succession and Non-Material
Change in Status to be effective
1/14/2011.
Filed Date: 02/14/2011.
Accession Number: 20110214–5185.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: ER11–2883–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
tariff filing per 35.13(a)(2)(iii): 2010–02–
E:\FR\FM\24FEN1.SGM
24FEN1
emcdonald on DSK2BSOYB1PROD with NOTICES
10348
Federal Register / Vol. 76, No. 37 / Thursday, February 24, 2011 / Notices
14 CAISO’s Service Agreement 1511
with Solar Partners I LGIA to be
effective 7/28/2010.
Filed Date: 02/14/2011.
Accession Number: 20110214–5188.
Comment Date: 5 p.m. Eastern Time
on Monday, March 07, 2011.
Docket Numbers: ER11–2885–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
tariff filing per 35.13(a)(2)(iii): 2011–02–
15 CAISO’s Amendments to
BrightSource LGIA’s to be effective 1/
26/2011.
Filed Date: 02/15/2011.
Accession Number: 20110215–5042.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 08, 2011.
Docket Numbers: ER11–2886–000.
Applicants: Sierra Pacific Power
Company.
Description: Sierra Pacific Power
Company submits tariff filing per 35:
Rate Schedule No. 61—Compliance to
Fix Date of Concurrence to be effective
1/1/2011.
Filed Date: 02/15/2011.
Accession Number: 20110215–5044.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 08, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
VerDate Mar<15>2010
17:21 Feb 23, 2011
Jkt 223001
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–4106 Filed 2–23–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–59–000]
Northwest Pipeline, GP; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed Molalla
Capacity Replacement Project and
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Molalla Capacity Replacement
Project, which would involve pipeline
and associated facility abandonment
and the construction and operation of a
new pipeline loop and associated
facilities by Northwest Pipeline, GP
(Northwest) in Marion and Clackamas
Counties, Oregon. This EA will be used
by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
scoping period will close on March 18,
2011.
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of or in
addition to sending written comments,
the Commission invites you to attend
the public scoping meeting scheduled as
follows: FERC Public Scoping Meeting,
Molalla Capacity Replacement Project,
March 1, 2011, 6:30 p.m. PST, St.
Mary’s Public Elementary School, 590
East College Street, Mount Angel, OR
97362.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
retirement of pipeline facilities or the
acquisition of an easement to construct,
operate, and maintain the proposed
pipeline facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Northwest provided to
landowners. This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (https://www.ferc.gov).
Summary of the Proposed Project
Northwest proposes to construct,
modify, and operate below and
aboveground facilities along its existing
2436 Camas/Eugene pipeline. According
to Northwest, the Molalla Capacity
Replacement Project would replace the
capacity of an approximately 15-milelong pipeline segment that is proposed
for retirement with approximately 7.8
miles of new pipeline.
The Molalla Capacity Replacement
Project would consist of the following
activities:
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 76, Number 37 (Thursday, February 24, 2011)]
[Notices]
[Pages 10347-10348]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-4106]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER96-1947-029; ER00-3696-015; ER07-1000-008; ER10-
450-003.
Applicants: Las Vegas Power Company, LLC, Griffith Energy LLC, LS
Power Marketing, LLC, Arlington Valley, LLC.
Description: Second Supplement to Updated Market Power Analysis.
Filed Date: 02/11/2011.
Accession Number: 20110211-5137.
Comment Date: 5 p.m. Eastern Time on Friday, March 04, 2011.
Docket Numbers: ER10-2393-000; ER10-2393-001.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator,
Inc's response to the Commission's letter dated January 11, 2011
seeking additional information and amendment to compliance filing dated
8/25/10.
Filed Date: 02/14/2011.
Accession Number: 20110214-5150.
Comment Date: 5 p.m. Eastern Time on Monday, March 07, 2011.
Docket Numbers: ER11-2496-001.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits tariff filing per 35.17(b): Midwest ISO PJM JOA Amendment to be
effective 9/17/2010.
Filed Date: 02/15/2011.
Accession Number: 20110215-5016.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 08, 2011.
Docket Numbers: ER11-2882-000.
Applicants: ReEnergy Sterling CT Limited Partnership.
Description: ReEnergy Sterling CT Limited Partnership submits
tariff filing per 35.1: ReEnergy Sterling CT LP Notice of Succession
and Non-Material Change in Status to be effective 1/14/2011.
Filed Date: 02/14/2011.
Accession Number: 20110214-5185.
Comment Date: 5 p.m. Eastern Time on Monday, March 07, 2011.
Docket Numbers: ER11-2883-000.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corporation
submits tariff filing per 35.13(a)(2)(iii): 2010-02-
[[Page 10348]]
14 CAISO's Service Agreement 1511 with Solar Partners I LGIA to be
effective 7/28/2010.
Filed Date: 02/14/2011.
Accession Number: 20110214-5188.
Comment Date: 5 p.m. Eastern Time on Monday, March 07, 2011.
Docket Numbers: ER11-2885-000.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corporation
submits tariff filing per 35.13(a)(2)(iii): 2011-02-15 CAISO's
Amendments to BrightSource LGIA's to be effective 1/26/2011.
Filed Date: 02/15/2011.
Accession Number: 20110215-5042.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 08, 2011.
Docket Numbers: ER11-2886-000.
Applicants: Sierra Pacific Power Company.
Description: Sierra Pacific Power Company submits tariff filing per
35: Rate Schedule No. 61--Compliance to Fix Date of Concurrence to be
effective 1/1/2011.
Filed Date: 02/15/2011.
Accession Number: 20110215-5044.
Comment Date: 5 p.m. Eastern Time on Tuesday, March 08, 2011.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: February 15, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-4106 Filed 2-23-11; 8:45 am]
BILLING CODE 6717-01-P