Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions, 9345-9346 [2011-3619]
Download as PDF
jlentini on DSKJ8SOYB1PROD with NOTICES
Federal Register / Vol. 76, No. 33 / Thursday, February 17, 2011 / Notices
35.13(a)(2)(iii): Revision to Attachment
AD to Temporarily Extend Tariff
Administration Agreement to be
effective 2/1/2011.
Filed Date: 02/09/2011.
Accession Number: 20110209–5132.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 02, 2011.
Docket Numbers: ER11–2862–000.
Applicants: Entergy Arkansas, Inc.
Description: Entergy Arkansas, Inc.
submits tariff filing per 35.13(a)(2)(iii):
Plum Point Amended IOA to be
effective 4/10/2011.
Filed Date: 02/09/2011.
Accession Number: 20110209–5166.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 02, 2011.
Docket Numbers: ER11–2863–000.
Applicants: Mirant Mid-Atlantic, LLC.
Description: Mirant Mid-Atlantic, LLC
submits tariff filing per 35.13(a)(2)(iii):
Notice of Succession to be effective
1/20/2011.
Filed Date: 02/09/2011.
Accession Number: 20110209–5167.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 02, 2011.
Docket Numbers: ER11–2864–000.
Applicants: GenOn Chalk Point, LLC.
Description: GenOn Chalk Point, LLC
submits tariff filing per 35.13(a)(2)(iii):
Notice of Succession to be effective
1/20/2011.
Filed Date: 02/09/2011.
Accession Number: 20110209–5183.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 02, 2011.
Docket Numbers: ER11–2865–000.
Applicants: AEP Texas Central
Company.
Description: AEP Texas Central
Company submits tariff filing per
35.13(a)(2)(iii): 20110209 TCC–ETT IA
Amend 1 to be effective 1/21/2011.
Filed Date: 02/09/2011.
Accession Number: 20110209–5184.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 02, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
Time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
VerDate Mar<15>2010
16:38 Feb 16, 2011
Jkt 223001
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 9, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–3578 Filed 2–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IN07–26–004]
Brian Hunter; Third Supplemental
Notice of Designation of Commission
Staff
On February 1, 2008, the Commission
issued an order that, inter alia,
designated the staff of the Office of
Enforcement as non-decisional in
deliberations by the Commission in this
proceeding, with the exception of the
Director of the Office of Enforcement
and the Directors of the Divisions of
Investigations, Energy Market Oversight,
Audits, and Financial Regulation. On
May 6, 2008, in a Supplemental Notice
of Designation of Commission Staff,
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
9345
Shauna Coleman, an attorney in the
Office of Enforcement was designated as
an additional exception to the
designation of the Office of Enforcement
as non-decisional.
On August 20, 2009, the Commission
issued the Second Supplemental Notice
of Designation of Commission Staff
designating Larry Gasteiger, Deputy
Direction of the Office of Enforcement,
and Max Minzner, Senior Counsel to the
Director of the Office of Enforcement, as
additional exceptions to the designation
of the Office of Enforcement as nondecisional. Mr. Minzner is no longer
employed by the Commission.
In this notice, the Commission
designates James Meade, Attorney
Advisor, as an additional exception to
the designation of the Office of
Enforcement as non-decisional. Mr.
Meade joined the Office of Enforcement
after the previous notices were issued
and did not participate in the
investigation at issue in this proceeding.
Dated: February 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3622 Filed 2–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 12615–001; 13528–000]
Soule Hydro, LLC; Notice of Draft
License Application and Preliminary
Draft Environmental Assessment
(PDEA) and Request for Preliminary
Terms and Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major
Unconstructed Project.
b. Project No.: 12615–001; 13528–000.
c. Date Filed: February 3, 2011.
d. Applicant: Soule Hydro, LLC.
e. Name of Project: Soule River
Hydroelectric Project.
f. Location: On the Soule River,
approximately nine miles southwest of
the community of Hyder, Alaska. The
project would occupy 1,257 acres of
federal lands within the Tongass
National Forest, administered by the
U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 USC 791(a)—825(r).
h. Applicant Contact: Glen D. Martin,
C/O Alaska Power & Telephone
Company, P.O. Box 3222, Port
Townsend, WA 98368, (360) 385–1733
x 122.
E:\FR\FM\17FEN1.SGM
17FEN1
jlentini on DSKJ8SOYB1PROD with NOTICES
9346
Federal Register / Vol. 76, No. 33 / Thursday, February 17, 2011 / Notices
i. FERC Contact: Matt Cutlip, (503)
552–2762, matt.cutlip@ferc.gov.
j. Status of Project: With this notice
the Commission is soliciting
(1) preliminary terms, conditions, and
recommendations on the Preliminary
Draft Environmental Assessment (DEA),
and (2) comments on the Draft License
Application.
k. Deadline for filing: May 2, 2011.
All comments on the Preliminary
DEA and Draft License Application
should be sent to the addresses noted
above in Item (h), and filed with FERC.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
All comments must include the
project name and number and bear the
heading Preliminary Comments,
Preliminary Recommendations,
Preliminary Terms and Conditions, or
Preliminary Prescriptions.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Soule Hydro, LLC has mailed a copy
of the Preliminary DEA and Draft
License Application to interested
entities and parties. Copies of these
documents are available for review at
AP&T Wireless, Inc., 4033 Tongass
Avenue, Suite 100, Ketchikan, Alaska
99901, or by calling (360) 385–1733 x
VerDate Mar<15>2010
16:38 Feb 16, 2011
Jkt 223001
122 or by e-mailing
glen.m@aptalaska.com.
m. With this notice, we are initiating
consultation with the Alaska State
Historic Preservation Officer as required
by Section 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36 CFR 800.4.
Dated: February 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3619 Filed 2–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR11–86–000]
Arkansas Oklahoma Gas Corporation;
Notice of Filing
Take notice that on January 14, 2011,
Arkansas Oklahoma Gas Corporation
(AOG) filed to request a case-specific
waiver of section 284.126(b)(1)(iv) of the
Commission’s regulations which was
promulgated in Order No. 735.1 Order
No. 735 requires all section 311 and
Hinshaw pipelines to file quarterly
reports containing transportation
transaction information including
receipt points for each transaction. AOG
requests waiver so that it can identify
‘‘production pool’’ as the receipt point
for its transactions instead of a specific
receipt point as more fully described in
the filing.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
1 Contract Reporting Requirements of Intrastate
Natural Gas Companies, Order No. 735, 131 FERC
¶ 61,150 (May 20, 2010).
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Friday, February 18, 2011.
Dated: February 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3626 Filed 2–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–2857–000]
Sun City Project LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Sun City
Project LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 2,
2011.
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 76, Number 33 (Thursday, February 17, 2011)]
[Notices]
[Pages 9345-9346]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-3619]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 12615-001; 13528-000]
Soule Hydro, LLC; Notice of Draft License Application and
Preliminary Draft Environmental Assessment (PDEA) and Request for
Preliminary Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Unconstructed Project.
b. Project No.: 12615-001; 13528-000.
c. Date Filed: February 3, 2011.
d. Applicant: Soule Hydro, LLC.
e. Name of Project: Soule River Hydroelectric Project.
f. Location: On the Soule River, approximately nine miles southwest
of the community of Hyder, Alaska. The project would occupy 1,257 acres
of federal lands within the Tongass National Forest, administered by
the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 USC 791(a)--825(r).
h. Applicant Contact: Glen D. Martin, C/O Alaska Power & Telephone
Company, P.O. Box 3222, Port Townsend, WA 98368, (360) 385-1733 x 122.
[[Page 9346]]
i. FERC Contact: Matt Cutlip, (503) 552-2762, matt.cutlip@ferc.gov.
j. Status of Project: With this notice the Commission is soliciting
(1) preliminary terms, conditions, and recommendations on the
Preliminary Draft Environmental Assessment (DEA), and (2) comments on
the Draft License Application.
k. Deadline for filing: May 2, 2011.
All comments on the Preliminary DEA and Draft License Application
should be sent to the addresses noted above in Item (h), and filed with
FERC. Comments may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
All comments must include the project name and number and bear the
heading Preliminary Comments, Preliminary Recommendations, Preliminary
Terms and Conditions, or Preliminary Prescriptions.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Soule Hydro, LLC has mailed a copy of the Preliminary DEA and Draft
License Application to interested entities and parties. Copies of these
documents are available for review at AP&T Wireless, Inc., 4033 Tongass
Avenue, Suite 100, Ketchikan, Alaska 99901, or by calling (360) 385-
1733 x 122 or by e-mailing glen.m@aptalaska.com.
m. With this notice, we are initiating consultation with the Alaska
State Historic Preservation Officer as required by Section 106,
National Historic Preservation Act, and the regulations of the Advisory
Council on Historic Preservation, 36 CFR 800.4.
Dated: February 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-3619 Filed 2-16-11; 8:45 am]
BILLING CODE 6717-01-P