Sunshine Act Meeting Notice, 8727-8728 [2011-3459]

Download as PDF Federal Register / Vol. 76, No. 31 / Tuesday, February 15, 2011 / Notices k. With this notice, we are soliciting comments on the pre-filing materials listed in paragraph j above, including the draft license application and monitoring plans. All comments should be sent to the address above in paragraph h. In addition, all comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Any individual or entity interested in submitting comments on the pre-filing materials must do so by March 17, 2011. l. With this notice, we are approving Edgartown’s request to be designated as the non-Federal representative for section 7 of the ESA and its request to initiate consultation under section 106 of the National Historic Preservation Act; and recommending that it begin informal consultation with: (a) The U.S. Fish and Wildlife Service and the National Marine Fisheries Service as required by section 7 of ESA; and (b) the Massachusetts State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. m. This notice does not constitute the Commission’s approval of Edgartown’s request to use the Pilot Project Licensing Procedures. Upon its review of the project’s overall characteristics relative to the pilot project criteria, the draft license application contents, and any comments filed, the Commission will determine whether there is adequate information to conclude the pre-filing process. n. The proposed Muskeget Channel Tidal Energy Project would consist of: (1) 13 commercially operated OCGenTM horizontal hydrokinetic cross flow turbine generation units with a total installed capacity of 5 megawatts, and one experimental turbine unit that would be used to test various tidal energy technologies; (2) a mooring and anchoring system attached to each unit consisting of four mooring lines, an anchor, and a clump weight; (3) two alternative submarine cable routes consisting of a either a 3.5-mile-long, or a 5-mile-long submarine cable with two 8727 13.8-kilovolt (kv) lines and a 4.0-kv transmission line connecting the turbine generation units to an onshore substation located either in the Chappaquiddick or Katama sections of Edgartown; (4) two alternative onshore transmission line routes consisting of a 34.5 kv transmission line connecting either the Chappaquiddick or Katama onshore station to an existing distribution line in Edargatown; and (5) appurtenant facilities. The project would have an average annual generation of 10.95 gigawatt-hours. o. A copy of the draft license application and all pre-filing materials are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. p. Pre-filing process schedule. The pre-filing process will be conducted pursuant to the following tentative schedule. Revisions to the schedule below may be made based on staff’s review of the draft application and any comments received. Milestone Date Comments on pre-filing materials due ............................................................................................ Issuance of meeting notice (if needed) ........................................................................................... Public meeting/technical conference (if needed) ............................................................................ Issuance of notice concluding pre-filing process and ILP waiver request determination .............. March 17, 2011. April 1, 2011. May 1, 2011. April 16, 2011 (if no meeting is needed). May 16, 2011 (if meeting is needed). q. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. DEPARTMENT OF ENERGY Note: Items listed on the agenda may be deleted without further notice. Federal Energy Regulatory Commission CONTACT PERSON FOR MORE INFORMATION: Dated: February 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–3305 Filed 2–14–11; 8:45 am] jdjones on DSK8KYBLC1PROD with NOTICES BILLING CODE 6717–01–P VerDate Mar<15>2010 15:51 Feb 14, 2011 Jkt 223001 Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: February 17, 2011, 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: OPEN. MATTERS TO BE CONSIDERED: Agenda. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 967TH—Meeting E:\FR\FM\15FEN1.SGM 15FEN1 8728 Federal Register / Vol. 76, No. 31 / Tuesday, February 15, 2011 / Notices REGULAR MEETING February 17, 2011, 10 a.m. Item No. Docket No. Company Administrative A–1 ......................................... A–2 ......................................... AD02–1–000 ..................................... AD02–7–000 ..................................... Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Electric E–1 E–2 E–3 E–4 ......................................... ......................................... ......................................... ......................................... E–5 ......................................... ER03–563–066 ................................. EL10–71–000 ................................... RM11–9–000 .................................... RM11–7–000 .................................... AD10–11–000 ................................... RM10–17–000 .................................. E–6 ......................................... E–7 ......................................... E–8 ......................................... RM10–13–001 .................................. RM08–13–001 .................................. RM08–19–004 .................................. E–9 ......................................... ER11–2411–000 ............................... ER11–2572–000 ............................... ER11–2455–000 ............................... ER11–2451–000 ............................... ER05–1056–005 ............................... ER10–2869–000 ............................... ER11–2427–000 ............................... EL10–62–000 ................................... E–10 ...................................... E–11 E–12 E–13 E–14 ...................................... ...................................... ...................................... ...................................... Devon Power LLC. Puget Sound Energy, Inc. Locational Exchanges of Wholesale Electric Power. Frequency Regulation Compensation in the Organized Wholesale Power Markets. Demand Response Compensation in Organized Wholesale Energy Markets. Credit Reforms in Organized Wholesale Electric Markets. Transmission Relay Loadability Reliability Standard. Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System. Southern California Edison Company. California Independent System Operator Corporation. Southern California Edison Company. California Independent System Operator Corporation. Chehalis Power Generating, L.P. Midwest Independent Transmission System Operator, Inc. ISO New England, Inc. Alta Wind I, LLC, Alta Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Alta Wind VI, LLC, Alta Wind VII, LLC, Alta Wind VIII, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC. Gas G–1 ........................................ G–2 ........................................ RP08–306–000 ................................. IS08–390–002 .................................. Portland Natural Gas Transmission System. SFPP, L.P. Hydro H–1 H–2 H–3 H–4 ........................................ ........................................ ........................................ ........................................ RM11–6–000 .................................... P–2210–209 ..................................... P–2210–206 ..................................... P–12532–003 ................................... P–13317–001 ................................... P–13689–001 ................................... Annual Charges for Use of Government Lands. Appalachian Power Company. Appalachian Power Company. Pine Creek Mine, LLC. Bishop Paiute Tribe. KC LLC. Certificates C–1 ........................................ CP10–485–000 ................................. jdjones on DSK8KYBLC1PROD with NOTICES Dated: February 10, 2011. Kimberly D. Bose, Secretary. A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or VerDate Mar<15>2010 15:51 Feb 14, 2011 Jkt 223001 Tennessee Gas Pipeline Company. contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2011–3459 Filed 2–11–11; 11:15 am] BILLING CODE 6717–01–P PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13951–000] Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 22, 2010, the Bear Creek Hydro Associates, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the E:\FR\FM\15FEN1.SGM 15FEN1

Agencies

[Federal Register Volume 76, Number 31 (Tuesday, February 15, 2011)]
[Notices]
[Pages 8727-8728]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-3459]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: February 17, 2011, 10 a.m.

PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426.

STATUS: OPEN.

MATTERS TO BE CONSIDERED: Agenda.

    Note: Items listed on the agenda may be deleted without further 
notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

967TH--Meeting

[[Page 8728]]



                             Regular Meeting
                       February 17, 2011, 10 a.m.
------------------------------------------------------------------------
           Item No.                 Docket No.            Company
------------------------------------------------------------------------
                             Administrative
------------------------------------------------------------------------
A-1...........................  AD02-1-000.......  Agency Business
                                                    Matters.
A-2...........................  AD02-7-000.......  Customer Matters,
                                                    Reliability,
                                                    Security and Market
                                                    Operations.
------------------------------------------------------------------------
                                Electric
------------------------------------------------------------------------
E-1...........................  ER03-563-066.....  Devon Power LLC.
E-2...........................  EL10-71-000......  Puget Sound Energy,
                                                    Inc.
E-3...........................  RM11-9-000.......  Locational Exchanges
                                                    of Wholesale
                                                    Electric Power.
E-4...........................  RM11-7-000.......  Frequency Regulation
                                AD10-11-000......   Compensation in the
                                                    Organized Wholesale
                                                    Power Markets.
E-5...........................  RM10-17-000......  Demand Response
                                                    Compensation in
                                                    Organized Wholesale
                                                    Energy Markets.
E-6...........................  RM10-13-001......  Credit Reforms in
                                                    Organized Wholesale
                                                    Electric Markets.
E-7...........................  RM08-13-001......  Transmission Relay
                                                    Loadability
                                                    Reliability
                                                    Standard.
E-8...........................  RM08-19-004......  Mandatory Reliability
                                                    Standards for the
                                                    Calculation of
                                                    Available Transfer
                                                    Capability, Capacity
                                                    Benefit Margins,
                                                    Transmission
                                                    Reliability Margins,
                                                    Total Transfer
                                                    Capability, and
                                                    Existing
                                                    Transmission
                                                    Commitments and
                                                    Mandatory
                                                    Reliability
                                                    Standards for the
                                                    Bulk-Power System.
E-9...........................  ER11-2411-000....  Southern California
                                                    Edison Company.
                                ER11-2572-000....  California
                                                    Independent System
                                                    Operator
                                                    Corporation.
E-10..........................  ER11-2455-000....  Southern California
                                                    Edison Company.
                                ER11-2451-000....  California
                                                    Independent System
                                                    Operator
                                                    Corporation.
E-11..........................  ER05-1056-005....  Chehalis Power
                                                    Generating, L.P.
E-12..........................  ER10-2869-000....  Midwest Independent
                                                    Transmission System
                                                    Operator, Inc.
E-13..........................  ER11-2427-000....  ISO New England, Inc.
E-14..........................  EL10-62-000......  Alta Wind I, LLC,
                                                    Alta Wind II, LLC,
                                                    Alta Wind III, LLC,
                                                    Alta Wind IV, LLC,
                                                    Alta Wind V, LLC,
                                                    Alta Wind VI, LLC,
                                                    Alta Wind VII, LLC,
                                                    Alta Wind VIII, LLC,
                                                    Alta Windpower
                                                    Development, LLC,
                                                    TGP Development
                                                    Company, LLC.
------------------------------------------------------------------------
                                   Gas
------------------------------------------------------------------------
G-1...........................  RP08-306-000.....  Portland Natural Gas
                                                    Transmission System.
G-2...........................  IS08-390-002.....  SFPP, L.P.
------------------------------------------------------------------------
                                  Hydro
------------------------------------------------------------------------
H-1...........................  RM11-6-000.......  Annual Charges for
                                                    Use of Government
                                                    Lands.
H-2...........................  P-2210-209.......  Appalachian Power
                                                    Company.
H-3...........................  P-2210-206.......  Appalachian Power
                                                    Company.
H-4...........................  P-12532-003......  Pine Creek Mine, LLC.
                                P-13317-001......  Bishop Paiute Tribe.
                                P-13689-001......  KC LLC.
------------------------------------------------------------------------
                              Certificates
------------------------------------------------------------------------
C-1...........................  CP10-485-000.....  Tennessee Gas
                                                    Pipeline Company.
------------------------------------------------------------------------


    Dated: February 10, 2011.
Kimberly D. Bose,
Secretary.
    A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2011-3459 Filed 2-11-11; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.