Claverack Creek, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 7838-7839 [2011-3158]
Download as PDF
7838
Federal Register / Vol. 76, No. 29 / Friday, February 11, 2011 / Notices
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 25, 2011.
Dated: February 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3157 Filed 2–10–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13953–000]
Mahoning Hydropower, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
jlentini on DSKJ8SOYB1PROD with NOTICES
January 31, 2011.
On December 30, 2010, Mahoning
Hydropower, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Lake Milton Hydroelectric Project
(Lake Milton Project or project) to be
located on the Mahoning River, in the
town of Lake Milton, Mahoning County,
Ohio. The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A two-mile-long
reservoir with a surface area of 1685
acres at a normal pool elevation of 948
mean sea level; (2) a 54-foot-high, 760foot-long concrete gravity dam
including a 650-foot-long spillway and
four 60-inch-diameter gate valves; (3) a
35-foot-long, 25-foot-wide concrete
powerhouse located at the base of the
dam and over the existing Gate 2
discharge pipe containing one tubular SType propeller turbine-generator unit
with a capacity of 650 kilowatts and
placed inside the existing 70-foot-long,
60-inch-diameter cast iron conduit
through the existing dam; (4) a new
12.5-kilovolt, 320-foot-long transmission
line connecting the powerhouse to an
existing distribution line; and (5)
appurtenant facilities. The estimated
annual generation of the Lake Milton
Project would be 3,700 megawatt-hours
at a head range of 26–40 feet.
VerDate Mar<15>2010
18:55 Feb 10, 2011
Jkt 223001
Applicant Contact: Mr. Anthony J.
Marra III, General Manager, 11365
Normandy Lane, Chagrin Falls, Ohio
44023; phone: (440) 804–6627.
FERC Contact: Sergiu Serban; phone:
(202) 502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13953–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3049 Filed 2–10–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13952–000]
Claverack Creek, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On December 31, 2010, Claverack
Creek, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Claverack Creek Hydroelectric Project to
be located on Claverack Creek, in
Columbia County, New York. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) The existing 16-foot-high, 170foot-long Stottville Mill Dam; (2) an
existing 11.4-acre impoundment with a
normal water surface elevation of 106.0
feet mean sea level; (3) an existing
turbine with a new generator and a new
turbine-generator with a total capacity
of 450 kilowatts; (4) an existing 10-footwide, 8-foot-deep intake canal; (5) new
trash racks, head gates, and stop log
structure; (6) an existing 6-footdiameter, 10-foot-long penstock and a
new 10-foot-long penstock extension; (7)
a new 40-foot-wide, 60-foot-long
powerhouse; (8) an existing 10-footwide, 20-foot-long tailrace; (9) a new
approximately 200-foot-long, 13.2kilovolt transmission line from the
powerhouse to a nearby distribution
line; (10) a redeveloped 100-foot-long
access road; (11) and appurtenant
facilities. The project would have an
estimated annual generation of 2,182
megawatt-hours.
Applicant Contact: Mr. William D. B.
Fay, Claverack Creek, LLC, 189 River
Road, Ware, MA 01082; phone: (413)
244–6445.
FERC Contact: Timothy Looney;
phone: (202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
E:\FR\FM\11FEN1.SGM
11FEN1
Federal Register / Vol. 76, No. 29 / Friday, February 11, 2011 / Notices
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13952–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: February 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3158 Filed 2–10–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on DSKJ8SOYB1PROD with NOTICES
Notice of Commission Staff
Attendance at North American Electric
Reliability Corporation (NERC)
Meetings from January–June 2011
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following NERC related meetings:
• NERC Planning Committee
Meetings and its sub-committee
meetings on, but not limited to:
Æ Wednesday–Thursday, February
9–10 Charlotte, NC (2)
Æ Tuesday–Wednesday, March 8–9,
Phoenix Convention Center—North
Building, Phoenix, AZ (3)
Æ Thursday, March 10
Teleconference (TBD)
Æ Wednesday–Thursday, April 6–7
Las Vegas, NV (2)
VerDate Mar<15>2010
18:55 Feb 10, 2011
Jkt 223001
Æ Tuesday–Wednesday, June 7–8
Toronto, ON, Canada (2)
Æ Tuesday–Thursday, June 28–30
Austin, TX (3)
• NERC Operating Committee
Meetings and its sub-committee
meetings on, but not limited to:
Æ Tuesday–Wednesday, March 8–9,
Phoenix Convention Center—North
Building, Phoenix, AZ (2)
Æ Tuesday–Wednesday, June 7–8
Toronto, ON, Canada (2)
• NERC Standards Committee
Meetings and its sub-committee
meetings on, but not limited to:
Æ Friday, February 11
Teleconference (1)
Æ Thursday, March 10
Teleconference (1)
Æ Wednesday–Thursday, April 13–
14 Salt Lake City, UT (2)
Æ Thursday, May 12
Teleconference (1)
Æ Thursday, June 9 Teleconference
(1)
• NERC Member Representative
Committee Meetings and its subcommittee meetings on, but not limited
to:
Æ Wednesday, February 16, Hyatt
Regency Phoenix, Phoenix, AZ (1)
Æ Tuesday, May 10 Arlington, VA
(1)
• NERC Board of Trustees Meetings
and its sub-committee meetings on, but
not limited to:
Æ Wednesday–Thursday, February
16–17, Hyatt Regency Phoenix, Phoenix,
AZ (2)
Æ Tuesday–Wednesday, May 10–11
Arlington, VA (2)
• NERC Finance and Audit
Committee Meetings on, but not limited
to:
Æ Wednesday, February 9
Teleconference (1)
Æ Tuesday, May 10, Washington,
DC (1)
• Critical Infrastructure Protection
Committee Quarterly Meetings and its
sub-committee meetings on, but not
limited to:
Æ Wednesday–Thursday, March 9–
10, Phoenix Convention Center—North
Building, Phoenix, AZ (2)
Æ Wednesday–Thursday, June 8–9
Phoenix, AZ (TBD)
The meetings will be held at the
following locations:
1. North American Electric Reliability
Corporation, 116–390 Village
Boulevard, Princeton, NJ 08540, 609–
452–8060.
2. Western Electricity Coordination
Council, 155 North 400 West, Suite 200,
Salt Lake City, UT 84103.
3. Electric Reliability Council of Texas
(ERCOT)—ERCOT MET Center, 7620
Metro Center Drive, Austin, TX 78744.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
7839
4. Oncor Electric Delivery Building,
115 W. 7th St., Room 1025, Fort Worth,
TX 76102.
5. The SERC Reliability Corporation,
2815 Coliseum Centre Drive, Suite 500,
Charlotte, NC 28217.
6. NV Energy—Beltway Complex,
7155 Lindell Road, Las Vegas, NV
89118.
7. Toronto Airport Marriott, 901
Dixon Road, Toronto, ON, Canada.
8. Phoenix Convention Center—North
Building, 100 North Street, Phoenix, AZ
85004.
9. Hyatt Regency Phoenix, 122 N
Street, Phoenix, AZ 85004.
10. Westin Arlington Gateway, 801
North Glebe Road, Arlington, VA 22203.
Further information may be found at:
https://www.nerc.com.
The above-referenced meetings are
open to the public.
For more information, contact: Mary
Agnes Nimis, Office of Electric
Reliability, Federal Energy Regulatory
Commission at (202) 502–8235 or
maryagnesnimis@ferc.gov or Tim Friel,
Office of Electric Reliability, Federal
Energy Regulatory Commission at (202)
502–6447 or tim.friel@ferc.gov.
Dated: February 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–3156 Filed 2–10–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission and
Commission Staff Attendance at ISO/
RTO Council and Regional State
Committees Meeting
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following ISO/RTO Council and
Regional State Committees meeting:
Saturday, February 12, 2011, 1 p.m.–
4 p.m., Grand Ballroom Central,
Renaissance Washington Hotel, 999
Ninth Street, NW., Washington DC
20001.
Further information may be found at
https://winter.narucmeetings.org/.
The above-referenced meeting is open
to the public.
The discussions at the meeting
described above may address matters at
issue in the following proceeding:
Docket No. AD10–5–000, RTO/ISO
Performance Metrics.
For more information, contact Sandra
Waldstein, Office of External Affairs,
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 76, Number 29 (Friday, February 11, 2011)]
[Notices]
[Pages 7838-7839]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-3158]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13952-000]
Claverack Creek, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On December 31, 2010, Claverack Creek, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Claverack Creek
Hydroelectric Project to be located on Claverack Creek, in Columbia
County, New York. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of: (1) The existing 16-foot-
high, 170-foot-long Stottville Mill Dam; (2) an existing 11.4-acre
impoundment with a normal water surface elevation of 106.0 feet mean
sea level; (3) an existing turbine with a new generator and a new
turbine-generator with a total capacity of 450 kilowatts; (4) an
existing 10-foot-wide, 8-foot-deep intake canal; (5) new trash racks,
head gates, and stop log structure; (6) an existing 6-foot-diameter,
10-foot-long penstock and a new 10-foot-long penstock extension; (7) a
new 40-foot-wide, 60-foot-long powerhouse; (8) an existing 10-foot-
wide, 20-foot-long tailrace; (9) a new approximately 200-foot-long,
13.2-kilovolt transmission line from the powerhouse to a nearby
distribution line; (10) a redeveloped 100-foot-long access road; (11)
and appurtenant facilities. The project would have an estimated annual
generation of 2,182 megawatt-hours.
Applicant Contact: Mr. William D. B. Fay, Claverack Creek, LLC, 189
River Road, Ware, MA 01082; phone: (413) 244-6445.
FERC Contact: Timothy Looney; phone: (202) 502-6096.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
[[Page 7839]]
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13952-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: February 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-3158 Filed 2-10-11; 8:45 am]