Federal Register / Vol. 76, No. 29 / Friday, February 11, 2011 / Notices
source reduction activities (Part II: Sec.
8.10, 8.10.1–4).
• Remove the ‘‘Yes’’ box and enlarge
the text section for the question on
optional pollution prevention
information (Part II: Section 8.11).
Rationale: The current form requests
information on ‘‘any source reduction
activities for this chemical during the
reporting year;’’ but the Reporting Forms
and Instructions request information on
‘‘newly implemented’’ source reduction
activities. These form changes will
remove this difference, allow facilities
to distinguish between new and ongoing
source reduction activities, and provide
additional optional information on
source reduction, recycling, or pollution
control activities on the form itself (in
box 8.11).
4. Add a new question to capture
miscellaneous and optional information
regarding the submission (Part II: Sec.
9., 9.1). Rationale: This new text box
will allow facilities to provide optional,
miscellaneous information that may be
helpful to EPA and/or the public in
using or interpreting their data (e.g.,
facility closures, explanations for
changes in release quantities, etc.).
5. Add NA boxes to Part II, Sections
5.3, 6.1, and 6.2. Rationale: Adding NA
boxes to these sections will make the
formatting of Form R and Form R
Schedule 1 more consistent.
What is the next step in the process for
these ICRs?
jlentini on DSKJ8SOYB1PROD with NOTICES
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice for the
ICR pursuant to 5 CFR 1320.5(a)(1)(iv)
to announce the submission of the ICR
to OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
individual listed under FOR FURTHER
INFORMATION CONTACT.
Dated: February 6, 2011.
Robin Gonzalez,
Acting Director, Office of Information
Analysis and Access, Office of Environmental
Information.
[FR Doc. 2011–3100 Filed 2–10–11; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
18:55 Feb 10, 2011
Jkt 223001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8995–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 01/31/2011 through 02/04/2011.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110032, Final EIS, BLM, WY,
Westside Land Conveyance Project,
Congressionally-Mandated Transfer of
16,500 Acres of Public Land to the
Westside Irrigation District, Big Horn
and Washakie Counties, WY, Review
Period Ends: 03/14/2011, Contact:
Chris Carlton 307–775–6227.
EIS No. 20110033, Final Supplement,
USFS, WY, EIS Title: Bridger-Teton
National Forest, Proposal to
Determine What Terms and
Conditions to Allow Development of
Oil and Gas Leasing in the Wyoming
Range, Sublette County, WY, Review
Period Ends: 03/14/2011, Contact:
John Kuzloski 307–739–5568.
EIS No. 20110034, Draft EIS, FHWA, WI,
U.S. 41 Improvement Project, Extend
from Depere—Suamico (Memorial
Drive to County M), Brown County,
WI, Comment Period Ends: 03/28/
2011, Contact: George Poirier 608–
829–7500.
EIS No. 20110035, Draft EIS, USFS, OR,
North End Sheep Allotment Project,
Proposes to Authorize Grazing
Domestic Sheep, Walla Walla Range
District of the Umatilla National
Forest, Wallowa, Union, and Umatlla
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Counties, OR, Comment Period Ends:
03/28/2011, Contact: Michael L.
Rassbach 509–522–6290.
Amended Notices
EIS No. 20100444, Final EIS, BLM, NV,
Tonopah Solar Energy Crescent Dunes
Solar Energy Project, a 7,680–Acre
Right-of-Way (ROW) on Public Lands
to Construct a Concentrated Solar
Thermal Power Plant Facility, Nye
County, NV, Contact: Julie Ann Smith
202–586–7668. Revision to FR Notice
Published 11/19/2010: The U.S.
Department of Energy’s has adopted
the Department of Interior’s Bureau of
Land Management FEIS #20100444,
filed 11/10/2010. DOE was a
cooperating agency for the above
project. Recirculation of the FEIS is
not necessary under 40 CFR 1506.3(c).
Dated: February 8, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2011–3115 Filed 2–10–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9265–4]
Notice of Open Meeting of the
Environmental Financial Advisory
Board (EFAB)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The United States
Environmental Protection Agency’s
(EPA) Environmental Financial
Advisory Board (EFAB) will hold a
meeting on March 8–9, 2011. EFAB is
an EPA advisory committee chartered
under the Federal Advisory Committee
Act (FACA) to provide advice and
recommendations to EPA on creative
approaches to funding environmental
programs, projects, and activities.
The purpose of the meeting is to hear
from informed speakers on
environmental finance issues, proposed
legislation, Agency priorities and to
discuss progress with work projects
under EFAB’s current Strategic Action
Agenda.
Environmental Finance topics
expected to be discussed include:
Financing Clean Air Technology;
Voluntary Environmental Improvement
Bonds (VEIB)/Property Assessed Clean
Energy (PACE) Financing
Environmental Improvements;
Financing Infrastructure for Tribal
Communities; and Leveraging Private
SUMMARY:
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 76, Number 29 (Friday, February 11, 2011)]
[Notices]
[Page 7844]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-3115]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8995-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 01/31/2011 through 02/04/2011.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA met this mandate by publishing weekly notices
of availability of EPA comments, which includes a brief summary of
EPA's comment letters, in the Federal Register. Since February 2008,
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20110032, Final EIS, BLM, WY, Westside Land Conveyance Project,
Congressionally-Mandated Transfer of 16,500 Acres of Public Land to the
Westside Irrigation District, Big Horn and Washakie Counties, WY,
Review Period Ends: 03/14/2011, Contact: Chris Carlton 307-775-6227.
EIS No. 20110033, Final Supplement, USFS, WY, EIS Title: Bridger-Teton
National Forest, Proposal to Determine What Terms and Conditions to
Allow Development of Oil and Gas Leasing in the Wyoming Range, Sublette
County, WY, Review Period Ends: 03/14/2011, Contact: John Kuzloski 307-
739-5568.
EIS No. 20110034, Draft EIS, FHWA, WI, U.S. 41 Improvement Project,
Extend from Depere--Suamico (Memorial Drive to County M), Brown County,
WI, Comment Period Ends: 03/28/2011, Contact: George Poirier 608-829-
7500.
EIS No. 20110035, Draft EIS, USFS, OR, North End Sheep Allotment
Project, Proposes to Authorize Grazing Domestic Sheep, Walla Walla
Range District of the Umatilla National Forest, Wallowa, Union, and
Umatlla Counties, OR, Comment Period Ends: 03/28/2011, Contact: Michael
L. Rassbach 509-522-6290.
Amended Notices
EIS No. 20100444, Final EIS, BLM, NV, Tonopah Solar Energy Crescent
Dunes Solar Energy Project, a 7,680-Acre Right-of-Way (ROW) on Public
Lands to Construct a Concentrated Solar Thermal Power Plant Facility,
Nye County, NV, Contact: Julie Ann Smith 202-586-7668. Revision to FR
Notice Published 11/19/2010: The U.S. Department of Energy's has
adopted the Department of Interior's Bureau of Land Management FEIS
20100444, filed 11/10/2010. DOE was a cooperating agency for
the above project. Recirculation of the FEIS is not necessary under 40
CFR 1506.3(c).
Dated: February 8, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2011-3115 Filed 2-10-11; 8:45 am]