Valley Affordable Housing Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 5584 [2011-2138]
Download as PDF
5584
Federal Register / Vol. 76, No. 21 / Tuesday, February 1, 2011 / Notices
mail of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–2141 Filed 1–31–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13944–000]
Valley Affordable Housing
Corporation; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
srobinson on DSKHWCL6B1PROD with NOTICES
January 21, 2011.
On December 10, 2010, the Valley
Affordable Housing Corporation filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Manville Hydroelectric
Project to be located at the Manville
Dam, on the Blackstone River, in
Providence County, Rhode Island. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) The existing 22-foot-high, 260foot-long Manville Dam with one-foot
flashboards owned by the Town of
Cumberland; (2) an existing 76-acre
impoundment with a normal water
surface elevation of 106 feet (National
Geodetic Vertical Datum 1929); (3) a
new trashrack and stoplogs; (4) a new
approximately 60-foot-wide intake in
place of a 60-foot-long section of the
spillway that would be removed; (5)
new 10-foot-long, 12-foot-wide dual
concrete penstocks; (6) a new 30-foottall (extending 20 feet above the
spillway), 60-foot-wide powerhouse
adjacent to the training walls; (7) a new
25-foot-wide, 5-foot-deep crest gate
adjacent to the powerhouse; (8) two new
bulb Kaplan turbines with a combined
installed capacity of 1,026 kilowatts; (9)
a new approximately 800-foot-long, 480volt transmission line; and (10)
appurtenant facilities. The project
would have an estimated annual
generation of 4,221 megawatt-hours.
VerDate Mar<15>2010
15:05 Jan 31, 2011
Jkt 223001
Applicant Contact: Peter Bouchard,
Valley Affordable Housing Corporation,
895 Mendon Road, Cumberland, RI
02864; phone: (401) 334–2802.
FERC Contact: Brandon Cherry;
phone: (202) 502–8328.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13944) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–2138 Filed 1–31–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13882–000]
City of Salem, OR; Notice of
Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Interventions
January 21, 2011.
On November 19, 2010, the City of
Salem, Oregon filed an application for a
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of a hydropower
development in the Geren Island
Diversion on the North Santiam River in
Marion County, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
three developments: Franzen Reservoir
Plant; Turner Control Plant; and
Fairmount Reservoir Plant, and would
utilize flows from two existing pipelines
for the City of Salem’s water system
drawing water from the existing Franzen
and Fairmount reservoirs.
The Franzen Reservoir Plant would
consist of: (1) A new penstock intake at
the powerhouse site; (2) a new
powerhouse with a single turbine/
generator unit at an installed capacity of
0.5 megawatt (MW); and (3) a new
standard flow meter to direct flow from
the penstock to the turbine.
The Turner Control Plant would
consist of: (1) A new penstock intake at
the powerhouse site; (2) a new
powerhouse with a single turbine/
generator unit at an installed capacity of
0.5 MW; and (3) a new standard flow
meter to direct flow from the penstock
to the turbine.
The Fairmount Reservoir Plant would
consist of: (1) A new 36-inch-diameter
bypass pipeline to convey water from
the Franzen reservoir to the Fairmount
reservoir; (2) a new powerhouse with a
single turbine/generator unit at an
installed capacity of 0.1 MW; and (3) a
new standard flow meter to direct flow
from the penstock to the turbine.
The three developments would have a
combined capacity of 1.1 MW. The
proposed project would have an average
annual generation of 8,000,000 kilowatthours.
Applicant Contact: Linda Norris, City
of Salem, Oregon, 555 Liberty Street SE.,
Room 220, Salem, OR 97301; phone:
(503) 588–6255; e-mail:
manager@cityofsalem.net.
FERC Contact: Kelly Wolcott (202)
502–6480.
Competing Application: This
application competes with Project No.
13721–000 filed May 5, 2010.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 76, Number 21 (Tuesday, February 1, 2011)]
[Notices]
[Page 5584]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-2138]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13944-000]
Valley Affordable Housing Corporation; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
January 21, 2011.
On December 10, 2010, the Valley Affordable Housing Corporation
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Manville Hydroelectric Project to be located at the Manville Dam,
on the Blackstone River, in Providence County, Rhode Island. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of: (1) The existing 22-foot-
high, 260-foot-long Manville Dam with one-foot flashboards owned by the
Town of Cumberland; (2) an existing 76-acre impoundment with a normal
water surface elevation of 106 feet (National Geodetic Vertical Datum
1929); (3) a new trashrack and stoplogs; (4) a new approximately 60-
foot-wide intake in place of a 60-foot-long section of the spillway
that would be removed; (5) new 10-foot-long, 12-foot-wide dual concrete
penstocks; (6) a new 30-foot-tall (extending 20 feet above the
spillway), 60-foot-wide powerhouse adjacent to the training walls; (7)
a new 25-foot-wide, 5-foot-deep crest gate adjacent to the powerhouse;
(8) two new bulb Kaplan turbines with a combined installed capacity of
1,026 kilowatts; (9) a new approximately 800-foot-long, 480-volt
transmission line; and (10) appurtenant facilities. The project would
have an estimated annual generation of 4,221 megawatt-hours.
Applicant Contact: Peter Bouchard, Valley Affordable Housing
Corporation, 895 Mendon Road, Cumberland, RI 02864; phone: (401) 334-
2802.
FERC Contact: Brandon Cherry; phone: (202) 502-8328.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13944) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-2138 Filed 1-31-11; 8:45 am]
BILLING CODE 6717-01-P