Environmental Management Site-Specific Advisory Board, Paducah, 5147 [2011-1900]

Download as PDF Federal Register / Vol. 76, No. 19 / Friday, January 28, 2011 / Notices Washington U.S. Department of Energy, Public Reading Room, Consolidated Information Center, 2770 University Drive, Room 101L, Richland, WA 99352, (509) 372–7443. University of Washington, SuzzalloAllen Library, Government Publications Division, Seattle, WA 98195, (206) 543–1937. Gonzaga University, Foley Center Library, 101–L East 502 Boone, Spokane, WA 99258, (509) 313–5931. Issued in Washington, DC on January 24, 2011. ´ Ines R. Triay, Assistant Secretary for Environmental Management. [FR Doc. 2011–1892 Filed 1–27–11; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Environmental Management SiteSpecific Advisory Board, Paducah Department of Energy (DOE). Notice of open meeting. AGENCY: ACTION: This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register. DATES: Thursday, February 3, 2011, 6 p.m. ADDRESSES: Barkley Centre, 111 Memorial Drive, Paducah, Kentucky 42001. SUMMARY: WReier-Aviles on DSKGBLS3C1PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Reinhard Knerr, Deputy Designated Federal Officer, Department of Energy Paducah Site Office, Post Office Box 1410, MS–103, Paducah, Kentucky 42001, (270) 441–6825. SUPPLEMENTARY INFORMATION: Purpose of the Board: The purpose of the Board is to make recommendations to DOE–EM and site management in the areas of environmental restoration, waste management and related activities. Tentative Agenda: • Call to Order, Introductions, Review of Agenda • Deputy Designated Federal Officer’s Comments • Federal Coordinator’s Comments • Liaisons’ Comments • Administrative Issues • Presentations • Subcommittee Chairs’ Comments • Public Comments • Final Comments VerDate Mar<15>2010 15:05 Jan 27, 2011 Jkt 223001 • Adjourn Breaks Taken As Appropriate Public Participation: The EM SSAB, Paducah, welcomes the attendance of the public at its advisory committee meetings and will make every effort to accommodate persons with physical disabilities or special needs. If you require special accommodations due to a disability, please contact Reinhard Knerr as soon as possible in advance of the meeting at the telephone number listed above. Written statements may be filed with the Board either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Reinhard Knerr at the telephone number listed above. Requests must be received as soon as possible prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. This notice is being published less than 15 days prior to the meeting date due to programmatic issues, logistical circumstances, and members’ availability. This meeting is being rescheduled to replace the Board’s January 20, 2011, meeting which was canceled due to winter weather conditions. Minutes: Minutes will be available by writing or calling Reinhard Knerr at the address and phone number listed above. Minutes will also be available at the following Web site: https:// www.pgdpcab.energy.gov/ 2011Meetings.html. Issued at Washington, DC, on January 24, 2011. LaTanya R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2011–1900 Filed 1–27–11; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13226–003] Blue Heron Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests January 20, 2011. Take notice that the following hydroelectric application has been filed PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 5147 with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: 13226–003. c. Date filed: November 1, 2010. d. Applicant: Blue Heron Hydro LLC. e. Name of Project: Ball Mountain Dam Hydroelectric Project. f. Location: U.S. Army Corps of Engineers Ball Mountain Dam on the West River near the Town of Jamaica, Windham County, Vermont. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Lori Barg, Blue Heron Hydro LLC, 113 Bartlett Road, Plainfield, Vermont 05667. (802) 454-1874. i. FERC Contact: Dr. Nicholas Palso, (202) 502–8854 or nicholas.palso@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘eComment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. Project Description: The Ball Mountain Dam Hydroelectric Project would utilize the U.S. Army Corps of Engineers’ existing Ball Mountain Dam and reservoir and would consist of: (1) Two turbine generator modules located within the existing intake tower, each containing 6 horizontal mixed flow turbines directly connected to 6 E:\FR\FM\28JAN1.SGM 28JAN1

Agencies

[Federal Register Volume 76, Number 19 (Friday, January 28, 2011)]
[Notices]
[Page 5147]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1900]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Environmental Management Site-Specific Advisory Board, Paducah

AGENCY: Department of Energy (DOE).

ACTION: Notice of open meeting.

-----------------------------------------------------------------------

SUMMARY: This notice announces a meeting of the Environmental 
Management Site-Specific Advisory Board (EM SSAB), Paducah. The Federal 
Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that 
public notice of this meeting be announced in the Federal Register.

DATES: Thursday, February 3, 2011, 6 p.m.

ADDRESSES: Barkley Centre, 111 Memorial Drive, Paducah, Kentucky 42001.

FOR FURTHER INFORMATION CONTACT: Reinhard Knerr, Deputy Designated 
Federal Officer, Department of Energy Paducah Site Office, Post Office 
Box 1410, MS-103, Paducah, Kentucky 42001, (270) 441-6825.

SUPPLEMENTARY INFORMATION: Purpose of the Board: The purpose of the 
Board is to make recommendations to DOE-EM and site management in the 
areas of environmental restoration, waste management and related 
activities.
    Tentative Agenda:

 Call to Order, Introductions, Review of Agenda
 Deputy Designated Federal Officer's Comments
 Federal Coordinator's Comments
 Liaisons' Comments
 Administrative Issues
 Presentations
 Subcommittee Chairs' Comments
 Public Comments
 Final Comments
 Adjourn
    Breaks Taken As Appropriate

    Public Participation: The EM SSAB, Paducah, welcomes the attendance 
of the public at its advisory committee meetings and will make every 
effort to accommodate persons with physical disabilities or special 
needs. If you require special accommodations due to a disability, 
please contact Reinhard Knerr as soon as possible in advance of the 
meeting at the telephone number listed above. Written statements may be 
filed with the Board either before or after the meeting. Individuals 
who wish to make oral statements pertaining to agenda items should 
contact Reinhard Knerr at the telephone number listed above. Requests 
must be received as soon as possible prior to the meeting and 
reasonable provision will be made to include the presentation in the 
agenda. The Deputy Designated Federal Officer is empowered to conduct 
the meeting in a fashion that will facilitate the orderly conduct of 
business. Individuals wishing to make public comments will be provided 
a maximum of five minutes to present their comments. This notice is 
being published less than 15 days prior to the meeting date due to 
programmatic issues, logistical circumstances, and members' 
availability. This meeting is being rescheduled to replace the Board's 
January 20, 2011, meeting which was canceled due to winter weather 
conditions.
    Minutes: Minutes will be available by writing or calling Reinhard 
Knerr at the address and phone number listed above. Minutes will also 
be available at the following Web site: https://www.pgdpcab.energy.gov/2011Meetings.html.

    Issued at Washington, DC, on January 24, 2011.
LaTanya R. Butler,
Acting Deputy Committee Management Officer.
[FR Doc. 2011-1900 Filed 1-27-11; 8:45 am]
BILLING CODE 6450-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.