Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, 4818-4819 [2011-1818]
Download as PDF
4818
Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Rules and Regulations
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. John McDonald, Project
Officer, First Coast Guard District,
telephone (617) 223–8364,
john.w.mcdonald@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The P.J.
McArdle Bridge, across the Chelsea
River at mile 0.3, between Chelsea and
East Boston, Massachusetts, has a
vertical clearance in the closed position
of 21 feet at mean high water and 30 feet
at mean low water. The bridge opens on
signal at all times as required by 33 CFR
117.593.
The Chelsea Green Space and
Recreation Committee, requested a
temporary deviation to facilitate a
public event, the Chelsea River Revel
and 5K Road Race.
The waterway is predominantly a
commercial waterway with one
upstream marina.
This deviation allows the bridge to
remain closed from 8 a.m. to 5 p.m. on
May 21, 2011. Vessels able to pass
under the closed draw may do so at any
time.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 11, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–1805 Filed 1–26–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0013]
Drawbridge Operation Regulation; Old
Brazos River, Freeport, Brazoria
County, TX
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
erowe on DSK5CLS3C1PROD with RULES
AGENCY:
ACTION:
The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Union
SUMMARY:
VerDate Mar<15>2010
14:37 Jan 26, 2011
Jkt 223001
Pacific Railroad Swing Span Bridge
across the Old Brazos River, mile 4.4, at
Freeport, Brazoria County, Texas. This
deviation allows the bridge to remain
closed to navigation for six 13-hour
periods between January 21 and January
30, 2011 and one 5-day period between
February 10 and 16, 2011.
DATES: This deviation is effective from
7 a.m. on January 21, 2011 through
7 a.m. on February 10, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0013 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–0013 in the ‘‘Keyword’’ box
and then clicking ‘‘Search.’’ They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Phil Johnson, Bridge
Management Specialist, Eighth Coast
Guard District, Bridge Administration
Branch, telephone 504–671–2128,
e-mail: Philip.R.Johnson@uscg.mil. If
you have questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone
202–366–9826.
SUPPLEMENTARY INFORMATION: The Union
Pacific Railroad Company has requested
a temporary deviation from the
published regulation for the Union
Pacific Railroad Bridge across the Old
Brazos River in 33 CFR 117.975: The
draw of the Union Pacific railroad
bridge, mile 4.4 at Freeport, shall be
maintained in the fully open position,
except for the crossing of trains or for
maintenance.
The Union Pacific Railroad Company
requests a deviation to allow the bridge
to remain closed to marine traffic as
follows: January 21, 22 and 23, 2011
from 7 a.m. to 8 p.m. January 28, 29 and
30, 2011 from 7 a.m. to 8 p.m. and from
5 p.m. on February 10, 2011 until 7 a.m.
on February 16, 2011.
This deviation will allow the swing
span of the bridge to remain in the
closed-to-navigation position in order
for the north end of the swing span to
be cut off and for the span to be
rebalanced. This work is necessary due
to an ongoing bridge modification
project, authorized by Coast Guard
Bridge Permit Amendment P(7a–09–8)
dated September 14, 2010. The project
involves the eventual replacement of the
swing span with a vertical lift span.
PO 00000
Frm 00018
Fmt 4700
Sfmt 4700
Foundations for the lift towers are
currently being constructed on both
sides of the navigation channel. The
length of the swing span must be
reduced on the north side so that the lift
tower may be set onto the foundation.
The process of cutting the steel truss
members off of the swing span, while
keeping the span balanced on the pivot
pier, requires that the swing span be
maintained in the closed-to-navigation
position for the times specified above.
Vessel traffic at the bridge site
consists of commercial fishing vessels,
commercial dive boats and recreational
boats. There are no alternate routes.
During the closure times, the balancing
process for the swing span will prevent
it from being able to open for
emergencies. Per 33 CFR 117.975: The
normal operating schedule requires that
the draw of the Union Pacific railroad
bridge, mile 4.4 at Freeport, shall be
maintained in the fully open position,
except for the crossing of trains or for
maintenance.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time periods. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 11, 2011.
David M. Frank,
Bridge Administrator,
By direction of the Commander, Eighth
Coast Guard District.
[FR Doc. 2011–1806 Filed 1–26–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1132]
Drawbridge Operation Regulations;
Hackensack River, Jersey City, NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Upper Hack Bridge
across the Hackensack River, mile 6.9, at
Secaucus, New Jersey. The deviation is
necessary for electrical rehabilitation.
This deviation allows the bridge to
remain in the closed position.
DATES: This deviation is effective from
4 a.m. on January 27, 2011 through 10
p.m. on January 28, 2011.
SUMMARY:
E:\FR\FM\27JAR1.SGM
27JAR1
Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Rules and Regulations
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1132 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1132 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC, 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
ADDRESSES:
If
you have questions on this rule, call or
e-mail Mr. Joe Arca, Project Officer,
First Coast Guard District,
joe.m.arca@uscg.mil, telephone (212)
668–7165. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
FOR FURTHER INFORMATION CONTACT:
The Upper
Hack Bridge, across the Hackensack
River at mile 6.9 has a vertical clearance
in the closed position of 8 feet at mean
high water and 13 feet at mean low
water. The existing drawbridge
operation regulations are listed at 33
CFR 117.723(d).
The waterway has seasonal
recreational vessels, and commercial
vessels of various sizes.
The owner of the bridge, New Jersey
Transit, requested a temporary deviation
to facilitate necessary electrical system
upgrades at the bridge.
Under this temporary deviation the
Upper Hack Bridge, mile 6.9, across the
Hackensack River may remain in the
closed position from 4 a.m. on January
27, 2011 through 10 p.m. on January 28,
2011. Vessels that can pass under the
bridge without a bridge opening may do
so at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
erowe on DSK5CLS3C1PROD with RULES
SUPPLEMENTARY INFORMATION:
Dated: January 11, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–1818 Filed 1–26–11; 8:45 am]
BILLING CODE 9110–04–P
VerDate Mar<15>2010
14:37 Jan 26, 2011
Jkt 223001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1121]
Drawbridge Operation Regulations;
Passaic River, Jersey City, NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 1 & 9 Bridge
across the Passaic River, mile 1.8, at
Jersey City, New Jersey. The deviation is
necessary for bridge painting. This
deviation allows the bridge owner to
require a two-hour advance notice for
bridge openings and several short
duration bridge closures.
DATES: This deviation is effective from
April 1, 2011 through July 31, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1121 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1121 in the ‘‘Keyword’’ and
then clicking ‘‘Search.’’ They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Joe Arca, Project Officer,
First Coast Guard District,
joe.m.arca@uscg.mil or telephone (212)
668–7165. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Route
1 & 9 Bridge has a vertical clearance of
40 feet at mean high water, and 45 feet
at mean low water in the closed
position. The existing drawbridge
operating regulations are listed at 33
CFR 117.739(b).
The waterway is predominantly used
by commercial operators.
The bridge owner, New Jersey
Department of Transportation, requested
a temporary deviation to facilitate
bridge painting operations.
A two-hour advance notice is
necessary in order to clear personnel
and equipment from the bridge to safely
provide bridge openings.
SUMMARY:
PO 00000
Frm 00019
Fmt 4700
Sfmt 4700
4819
In addition, the painting operation
work will necessitate several bridge
closures of short duration to erect and
relocate containment. The exact times
for these closures are not known at this
time because it is predicated upon the
speed of the painting process. As a
result, the Coast Guard will publish a
notice in the Local Notice to Mariners
two-weeks in advance of each closure as
well as issue a safety information
broadcast twenty-four hours prior to the
commencement of each closure.
Under this temporary deviation a twohour advance notice for bridge openings
shall be required from April 1, 2011
through July 31, 2011, by calling the
number posted at the bridge. Further,
several bridge closures of short duration
will be implemented. The exact bridge
closure dates will be published in the
Local Notice to Mariners two weeks in
advance of each bridge closure and
safety broadcasts will be issued twentyfour hours in advance. Vessels able to
pass under the closed draw may do so
at any time.
Waterway users were advised of the
advance notice requirement and the
requested bridge closures. No objections
were received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 11, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–1808 Filed 1–26–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2010–1122]
Drawbridge Operation Regulations;
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, Hempstead, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Meadowbrook State
Parkway Bridge across the Sloop
Channel, mile 12.8, at Hempstead, New
York. The deviation is necessary to
SUMMARY:
E:\FR\FM\27JAR1.SGM
27JAR1
Agencies
[Federal Register Volume 76, Number 18 (Thursday, January 27, 2011)]
[Rules and Regulations]
[Pages 4818-4819]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1818]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-1132]
Drawbridge Operation Regulations; Hackensack River, Jersey City,
NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Upper Hack Bridge across the Hackensack River, mile 6.9, at Secaucus,
New Jersey. The deviation is necessary for electrical rehabilitation.
This deviation allows the bridge to remain in the closed position.
DATES: This deviation is effective from 4 a.m. on January 27, 2011
through 10 p.m. on January 28, 2011.
[[Page 4819]]
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-1132 and are available online
at https://www.regulations.gov, inserting USCG-2010-1132 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC, 20590, between 9 a.m. and
5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, joe.m.arca@uscg.mil, telephone (212) 668-7165. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Upper Hack Bridge, across the Hackensack
River at mile 6.9 has a vertical clearance in the closed position of 8
feet at mean high water and 13 feet at mean low water. The existing
drawbridge operation regulations are listed at 33 CFR 117.723(d).
The waterway has seasonal recreational vessels, and commercial
vessels of various sizes.
The owner of the bridge, New Jersey Transit, requested a temporary
deviation to facilitate necessary electrical system upgrades at the
bridge.
Under this temporary deviation the Upper Hack Bridge, mile 6.9,
across the Hackensack River may remain in the closed position from 4
a.m. on January 27, 2011 through 10 p.m. on January 28, 2011. Vessels
that can pass under the bridge without a bridge opening may do so at
all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 11, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-1818 Filed 1-26-11; 8:45 am]