Notice Announcing Preliminary Permit Drawing, 4893-4894 [2011-1724]

Download as PDF 4893 Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Notices that no applicant’s plans are better adapted than the others, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the four applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011–1720 Filed 1–26–11; 8:45 am] BILLING CODE 6717–01–P claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that no applicant’s plans are better adapted than the others, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the three applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2011–1718 Filed 1–26–11; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P Kimberly D. Bose, Secretary. [FR Doc. 2011–1722 Filed 1–26–11; 8:45 am] Notice Announcing Preliminary Permit Drawing DEPARTMENT OF ENERGY January 20, 2011. Federal Energy Regulatory Commission Lock Hydro Friends Fund XXXV. FFP Missouri 7, LLC ....... Dashields Hydro, LLC ..... Project No. 13735–000 Project No. 13756–000 Project No. 13779–000 On May 18, 2010, at 8:30 a.m., the Commission received three preliminary permit applications for proposed projects to be located at the Dashields Lock & Dam located on the Ohio River in Alleghany County, Pennsylvania.1 The applications were filed by Lock Hydro Friends Fund XXXV, for Project No. 13735–000, FFP Missouri 7, LLC, for Project No. 13756–000, and Dashields Hydro, LLC, for Project No. 13779–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because three applications from entities not mstockstill on DSKH9S0YB1PROD with NOTICES filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). VerDate Mar<15>2010 17:51 Jan 26, 2011 Jkt 223001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [Project No. 13763–000; Project No. 13772– 000] FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing January 20, 2011. On May 18, 2010, at 8:30 a.m., the Commission received two preliminary permit applications for proposed projects to be located at the Grays Landing Lock & Dam located on the Monongahela River in Greene County, Pennsylvania.1 The applications were filed by FFP Missouri 13, LLC, for Project No. 13763–000, and Grays Hydro, LLC, for Project No. 13772–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing January 20, 2011. Lock Hydro Friends Fund XLIII. FFP Missouri 14, LLC ..... Solia 4 Hydroelectric, LLC. Project No. 13745–000 Project No. 13758–000 Project No. 13767–000 On May 18, 2010, at 8:30 a.m., the Commission received three preliminary permit applications for proposed projects to be located at the Monongahela River Lock & Dam No. 4 located on the Monongahela River in Washington County, Pennsylvania.1 The applications were filed by Lock Hydro Friends Fund XLIII, for Project No. 13745–000, FFP Missouri 14, LLC, for Project No. 13758–000, and Solia 4 Hydroelectric, LLC, for Project No. 13767–000. 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). E:\FR\FM\27JAN1.SGM 27JAN1 4894 Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Notices Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because three applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that no applicant’s plans are better adapted than the others, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the three applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011–1724 Filed 1–26–11; 8:45 am] BILLING CODE 6717–01–P Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2011–1719 Filed 1–26–11; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission January 20, 2011. Project No. 13736–000 Project No. 13777–000 mstockstill on DSKH9S0YB1PROD with NOTICES On May 18, 2010, at 8:30 a.m., the Commission received two preliminary permit applications for proposed projects to be located at the Allegheny River Lock & Dam No. 7 located on the Allegheny River in Armstrong County, Pennsylvania.1 The applications were 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). VerDate Mar<15>2010 17:51 Jan 26, 2011 applications were filed by Lock+ Hydro Friends Fund XL, for Project No. 13746– 000, FFP Missouri 4, LLC, for Project No. 13750–000, Allegheny 4 Hydro, LLC, for Project No. 13776–000, and Three Rivers Hydro, LLC, for Project No. 13782–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because four applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that no applicant’s plans are better adapted than the others, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the four applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011–1712 Filed 1–26–11; 8:45 am] Notice Announcing Preliminary Permit Drawing Lock Hydro Friends Fund XLI. Allegheny 7 Hydro, LLC filed by Lock Hydro Friends Fund XLI, for Project No. 13736–000, and Allegheny 7 Hydro, LLC, for Project No. 13777–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Jkt 223001 DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Notice Announcing Preliminary Permit Drawing Federal Energy Regulatory Commission January 20, 2011. Notice Announcing Preliminary Permit Drawing Lock+ Hydro Friends Fund XL. FFP Missouri 4, LLC ....... Allegheny 4 Hydro, LLC Three Rivers Hydro, LLC Project No. 13746–000 Project No. 13750–000 Project No. 13776–000 Project No. 13782–000 On May 18, 2010, at 8:30 a.m., the Commission received four preliminary permit applications for proposed projects to be located at the Allegheny River Lock and Dam No. 4 located on the Allegheny River in Allegheny County, Pennsylvania.1 The 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 January 20, 2011. FFP Missouri 15, LLC ..... Morgantown Hydro, LLC Three Rivers Hydro, LLC Project No. 13762–000 Project No. 13773–000 Project No. 13784–000 On May 18, 2010, at 8:30 a.m., the Commission received three preliminary permit applications for proposed applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). E:\FR\FM\27JAN1.SGM 27JAN1

Agencies

[Federal Register Volume 76, Number 18 (Thursday, January 27, 2011)]
[Notices]
[Pages 4893-4894]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1724]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Announcing Preliminary Permit Drawing

January 20, 2011.

 
 
 
Lock Hydro Friends Fund XLIII.............  Project No. 13745-000
FFP Missouri 14, LLC......................  Project No. 13758-000
Solia 4 Hydroelectric, LLC................  Project No. 13767-000
 

    On May 18, 2010, at 8:30 a.m., the Commission received three 
preliminary permit applications for proposed projects to be located at 
the Monongahela River Lock & Dam No. 4 located on the Monongahela River 
in Washington County, Pennsylvania.\1\ The applications were filed by 
Lock Hydro Friends Fund XLIII, for Project No. 13745-000, FFP Missouri 
14, LLC, for Project No. 13758-000, and Solia 4 Hydroelectric, LLC, for 
Project No. 13767-000.
---------------------------------------------------------------------------

    \1\ The Commission is open each day from 8:30 a.m. to 5 p.m., 
except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). 
The applications were filed between 5 p.m. on Monday May 17, 2010, 
and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission's Rules 
of Practice and Procedure, any document received after regular 
business hours is considered filed at 8:30 a.m. on the next regular 
business day. 18 CFR 385.2001(a)(2) (2010).

---------------------------------------------------------------------------

[[Page 4894]]

    Where all permit applicants are municipalities or all permit 
applicants are non-municipalities, and no applicant's plans are better 
adapted than the others' to develop, conserve, and utilize in the 
public interest the water resources of a region, the Commission issues 
a permit to the applicant who filed first in time.\2\ In this case, 
because three applications from entities not claiming municipal 
preference are deemed filed at the same time, the Commission will 
conduct a random tie breaker to determine priority. In the event that 
the Commission concludes that no applicant's plans are better adapted 
than the others, priority will be determined accordingly.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, 
LLC, 126 FERC ] 61,132 (2009).
---------------------------------------------------------------------------

    On January 27, 2011, at 10 a.m. (Eastern Time), the Secretary of 
the Commission, or her designee, will, by random drawing, determine the 
filing priority for the three applicants identified in this notice. The 
drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St., NE., Washington, DC 
20426. The results of the drawing will be recorded by the Secretary or 
her designee. A subsequent notice will be issued by the Secretary 
announcing the results of the drawing.

Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1724 Filed 1-26-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.