Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro, LLC; Notice Announcing Preliminary Permit Drawing, 4892-4893 [2011-1720]
Download as PDF
4892
Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[AD11–8–000]
[Docket No. AC11–27–000]
Notice Inviting Comments on Report
Black Marlin Pipeline Company; Notice
of Filing
mstockstill on DSKH9S0YB1PROD with NOTICES
January 20, 2011.
Take notice that on January 19, 2010,
Black Marlin Pipeline Company
submitted a request for a waiver of the
reporting requirement to file the CPA
Certification for FERC Form 2–A for
2010.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: February 21, 2011.
Kimberly Bose,
Secretary.
[FR Doc. 2011–1723 Filed 1–26–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:51 Jan 26, 2011
Jkt 223001
January 20, 2011.
Frequency Response
Metrics to Assess Requirements for Reliable Integration of
Variable Renewable
Generation.
Docket No. AD11–8–000
Frm 00035
Fmt 4703
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1713 Filed 1–26–11; 8:45 am]
BILLING CODE 6717–01–P
The Commission is posting, and
inviting comment upon, a report
prepared by the Lawrence Berkeley
National Laboratory, ‘‘Use of Frequency
Response Metrics to Assess the Planning
and Operating Requirements for
Reliable Integration of Variable
Renewable Generation’’ and its five
supporting papers (collectively, ‘‘the
Report’’).
Frequency response measures how
the bulk power system performs in
responding to a sudden loss of
generation that could cause reliability
problems such as blackouts. The
purpose of the Report is to develop an
objective methodology to evaluate the
reliability impacts of varying resource
mixes including increased amounts of
renewable resources. The Report
accomplishes this objective by
developing and testing tools that can be
used to assess and plan for the
operational requirements of the bulk
power system. The Report may assist
the Commission in the development of
policies relating to the issues raised in
the Report.
The Report will be posted on the
Commission’s Web site at https://
www.ferc.gov.
Comments on the Report should be
filed within 45 days of the issuance of
this Notice. The Commission
encourages electronic submission of
comments in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the comment to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
All filings in this docket are
accessible on-line at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and will be available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email notification when a document is
added to a subscribed docket. For
assistance with any FERC Online
service, please e-mail
PO 00000
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Questions regarding this Notice
should be directed to: Robert V. Snow,
Office of Electric Reliability, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
202–502–6716. Robert.Snow@ferc.gov.
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 13740–000, 13749–000, 13775–
000, 13781–000]
Lock+ Hydro Friends Fund XXXIX, FFP
Missouri 3, LLC, Allegheny 3 Hydro,
LLC, Three Rivers Hydro, LLC; Notice
Announcing Preliminary Permit
Drawing
January 20, 2011.
On May 18, 2010, at 8:30 a.m., the
Commission received four preliminary
permit applications for proposed
projects to be located at the C. W. Bill
Young Lock and Dam located on the
Allegheny River in Allegheny County,
Pennsylvania.1 The applications were
filed by Lock+ Hydro Friends Fund
XXXIX, for Project No. 13740–000, FFP
Missouri 3, LLC, for Project No. 13749–
000, Allegheny 3 Hydro, LLC, for Project
No. 13775–000, and Three Rivers
Hydro, LLC, for Project No. 13781–000.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
filed first in time.2 In this case, because
four applications from entities not
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
breaker to determine priority. In the
event that the Commission concludes
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2010). The
applications were filed between 5 p.m. on Monday
May 17, 2010, and 8:30 a.m. on Tuesday May 18,
2010. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
2 18 CFR 4.37 (2010). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
E:\FR\FM\27JAN1.SGM
27JAN1
4893
Federal Register / Vol. 76, No. 18 / Thursday, January 27, 2011 / Notices
that no applicant’s plans are better
adapted than the others, priority will be
determined accordingly.
On January 27, 2011, at 10 a.m.
(eastern time), the Secretary of the
Commission, or her designee, will, by
random drawing, determine the filing
priority for the four applicants
identified in this notice. The drawing is
open to the public and will be held in
room 2C, the Commission Meeting
Room, located at 888 First St., NE.,
Washington, DC 20426. The results of
the drawing will be recorded by the
Secretary or her designee. A subsequent
notice will be issued by the Secretary
announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1720 Filed 1–26–11; 8:45 am]
BILLING CODE 6717–01–P
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
breaker to determine priority. In the
event that the Commission concludes
that no applicant’s plans are better
adapted than the others, priority will be
determined accordingly.
On January 27, 2011, at 10 a.m.
(eastern time), the Secretary of the
Commission, or her designee, will, by
random drawing, determine the filing
priority for the three applicants
identified in this notice. The drawing is
open to the public and will be held in
room 2C, the Commission Meeting
Room, located at 888 First St., NE.,
Washington, DC 20426. The results of
the drawing will be recorded by the
Secretary or her designee. A subsequent
notice will be issued by the Secretary
announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2011–1718 Filed 1–26–11; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1722 Filed 1–26–11; 8:45 am]
Notice Announcing Preliminary Permit
Drawing
DEPARTMENT OF ENERGY
January 20, 2011.
Federal Energy Regulatory
Commission
Lock Hydro Friends
Fund XXXV.
FFP Missouri 7, LLC .......
Dashields Hydro, LLC .....
Project No. 13735–000
Project No. 13756–000
Project No. 13779–000
On May 18, 2010, at 8:30 a.m., the
Commission received three preliminary
permit applications for proposed
projects to be located at the Dashields
Lock & Dam located on the Ohio River
in Alleghany County, Pennsylvania.1
The applications were filed by Lock
Hydro Friends Fund XXXV, for Project
No. 13735–000, FFP Missouri 7, LLC,
for Project No. 13756–000, and
Dashields Hydro, LLC, for Project No.
13779–000.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
filed first in time.2 In this case, because
three applications from entities not
mstockstill on DSKH9S0YB1PROD with NOTICES
filed first in time.2 In this case, because
two applications from entities not
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
breaker to determine priority. In the
event that the Commission concludes
that neither applicant’s plans are better
adapted than the other, priority will be
determined accordingly.
On January 27, 2011, at 10 a.m.
(eastern time), the Secretary of the
Commission, or her designee, will, by
random drawing, determine the filing
priority for the two applicants identified
in this notice. The drawing is open to
the public and will be held in room 2C,
the Commission Meeting Room, located
at 888 First St., NE., Washington, DC
20426. The results of the drawing will
be recorded by the Secretary or her
designee. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2010). The
applications were filed between 5 p.m. on Monday
May 17, 2010, and 8:30 a.m. on Tuesday May 18,
2010. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
2 18 CFR 4.37 (2010). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
VerDate Mar<15>2010
17:51 Jan 26, 2011
Jkt 223001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Project No. 13763–000; Project No. 13772–
000]
FFP Missouri 13, LLC, Grays Hydro,
LLC; Notice Announcing Preliminary
Permit Drawing
January 20, 2011.
On May 18, 2010, at 8:30 a.m., the
Commission received two preliminary
permit applications for proposed
projects to be located at the Grays
Landing Lock & Dam located on the
Monongahela River in Greene County,
Pennsylvania.1 The applications were
filed by FFP Missouri 13, LLC, for
Project No. 13763–000, and Grays
Hydro, LLC, for Project No. 13772–000.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2010). The
applications were filed between 5 p.m. on Monday
May 17, 2010, and 8:30 a.m. on Tuesday May 18,
2010. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
January 20, 2011.
Lock Hydro Friends
Fund XLIII.
FFP Missouri 14, LLC .....
Solia 4 Hydroelectric,
LLC.
Project No. 13745–000
Project No. 13758–000
Project No. 13767–000
On May 18, 2010, at 8:30 a.m., the
Commission received three preliminary
permit applications for proposed
projects to be located at the
Monongahela River Lock & Dam No. 4
located on the Monongahela River in
Washington County, Pennsylvania.1 The
applications were filed by Lock Hydro
Friends Fund XLIII, for Project No.
13745–000, FFP Missouri 14, LLC, for
Project No. 13758–000, and Solia 4
Hydroelectric, LLC, for Project No.
13767–000.
2 18 CFR 4.37 (2010). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2010). The
applications were filed between 5 p.m. on Monday
May 17, 2010, and 8:30 a.m. on Tuesday May 18,
2010. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2010).
E:\FR\FM\27JAN1.SGM
27JAN1
Agencies
[Federal Register Volume 76, Number 18 (Thursday, January 27, 2011)]
[Notices]
[Pages 4892-4893]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1720]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 13740-000, 13749-000, 13775-000, 13781-000]
Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3
Hydro, LLC, Three Rivers Hydro, LLC; Notice Announcing Preliminary
Permit Drawing
January 20, 2011.
On May 18, 2010, at 8:30 a.m., the Commission received four
preliminary permit applications for proposed projects to be located at
the C. W. Bill Young Lock and Dam located on the Allegheny River in
Allegheny County, Pennsylvania.\1\ The applications were filed by Lock+
Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP Missouri 3,
LLC, for Project No. 13749-000, Allegheny 3 Hydro, LLC, for Project No.
13775-000, and Three Rivers Hydro, LLC, for Project No. 13781-000.
---------------------------------------------------------------------------
\1\ The Commission is open each day from 8:30 a.m. to 5 p.m.,
except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010).
The applications were filed between 5 p.m. on Monday May 17, 2010,
and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission's Rules
of Practice and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on the next regular
business day. 18 CFR 385.2001(a)(2) (2010).
---------------------------------------------------------------------------
Where all permit applicants are municipalities or all permit
applicants are non-municipalities, and no applicant's plans are better
adapted than the others' to develop, conserve, and utilize in the
public interest the water resources of a region, the Commission issues
a permit to the applicant who filed first in time.\2\ In this case,
because four applications from entities not claiming municipal
preference are deemed filed at the same time, the Commission will
conduct a random tie breaker to determine priority. In the event that
the Commission concludes
[[Page 4893]]
that no applicant's plans are better adapted than the others, priority
will be determined accordingly.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development,
LLC, 126 FERC ] 61,132 (2009).
---------------------------------------------------------------------------
On January 27, 2011, at 10 a.m. (eastern time), the Secretary of
the Commission, or her designee, will, by random drawing, determine the
filing priority for the four applicants identified in this notice. The
drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St., NE., Washington, DC
20426. The results of the drawing will be recorded by the Secretary or
her designee. A subsequent notice will be issued by the Secretary
announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1720 Filed 1-26-11; 8:45 am]
BILLING CODE 6717-01-P