PowerSmith Cogeneration Project, LP; Notice of Filing, 4648-4649 [2011-1565]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
4648
Federal Register / Vol. 76, No. 17 / Wednesday, January 26, 2011 / Notices
Applicants: Mountain View Power
Partners IV, LLC.
Description: Mountain View Power
Partners IV, LLC submits tariff filing per
35.12: Baseline Filing to be effective
3/20/2011.
Filed Date: 01/19/2011.
Accession Number: 20110119–5092.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Docket Numbers: ER11–2702–000.
Applicants: La Paloma Generating
Company, LLC.
Description: La Paloma Generating
Company, LLC submits tariff filing per
35: January 19, 2011 Compliance Filing
to be effective 9/30/2010.
Filed Date: 01/19/2011.
Accession Number: 20110119–5104.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Docket Numbers: ER11–2703–000.
Applicants: AEP Texas Central
Company.
Description: AEP Texas Central
Company submits tariff filing per 35.1:
TCC RS and SA Baseline to be effective
1/20/2011.
Filed Date: 01/19/2011.
Accession Number: 20110119–5111.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Docket Numbers: ER11–2704–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: WMPA No. 2713, Queue
No. V4–027, Keystone Solar LLC and
PPL to be effective 12/13/2010.
Filed Date: 01/19/2011.
Accession Number: 20110119–5119.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Docket Numbers: ER11–2705–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
tariff filing per 35: 2011–01–19 CAISO
Revised Transmission Planning Process
Compliance filing to be effective 12/20/
2010.
Filed Date: 01/19/2011.
Accession Number: 20110119–5140.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Docket Numbers: ER11–2706–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: WMPA No. 2722, Queue
No. W2–036, PSE&G and PSE&G to be
effective 1/13/2011.
Filed Date: 01/19/2011.
Accession Number: 20110119–5141.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
VerDate Mar<15>2010
17:27 Jan 25, 2011
Jkt 223001
Docket Numbers: ER11–2707–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: WMPA No. 2711, Queue
W1–083, West Deptford Solar, L.L.C.
and PSE&G to be effective 12/9/2010.
Filed Date: 01/19/2011.
Accession Number: 20110119–5142.
Comment Date: 5 p.m. Eastern Time
on Wednesday, February 9, 2011.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH11–12–000.
Applicants: IP Gyrfalcon Company,
LLC.
Description: Notice of Change in Facts
of International Power America, Inc.
Filed Date: 01/14/2011.
Accession Number: 20110114–5235.
Comment Date: 5 p.m. Eastern Time
on Friday, February 4, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–1575 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13808–000; Project No. 13813–
000]
Lock+ Hydro Friends Fund XLIX; FFP
Missouri 14, LLC; Notice Announcing
Filing Priority for Preliminary Permit
Applications
January 19, 2011.
On January 18, 2011, the Commission
held a drawing to determine priority
between two competing preliminary
permit applications with identical filing
times. In the event that the Commission
concludes that neither of the applicants’
plans is better adapted than the other to
develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. Lock+ Hydro Friends Fund XLIX:
Project No. 13808–000.
2. FFP Missouri 14, LLC: Project No.
13813–000.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–1576 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL11–15–000; QF86–36–005]
PowerSmith Cogeneration Project, LP;
Notice of Filing
January 19, 2011.
Take notice that on January 13, 2011,
PowerSmith Cogeneration Project, LP
(PowerSmith), pursuant to section
E:\FR\FM\26JAN1.SGM
26JAN1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 76, No. 17 / Wednesday, January 26, 2011 / Notices
292.205 of the Federal Energy
Regulatory Commission’s (Commission)
Regulations implementing the Public
Utility Regulatory Policies Act of 1978,
as amended (PURPA), 18 CFR
292.205(c) (2007), filed a request for a
one-year waiver of the operation
standard set forth in section
292.205(a)(1) of the Commission’s
Regulations for the topping-cycle
cogeneration facility owned and
operated by PowerSmith located in
Oklahoma.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1565 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:27 Jan 25, 2011
Jkt 223001
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–2692–000]
ACS Energy Services, Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, ACS
Energy Services, Inc.’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 8,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
Frm 00041
Fmt 4703
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–1577 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
January 19, 2011.
PO 00000
4649
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 2524–018]
Grand River Dam Authority; Notice of
Intent To File License Application,
Filing of Pre-Application Document
(PAD), Commencement of Pre-Filing
Process, and Scoping; Request for
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
January 18, 2011.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process
b. Project No.: 2524–018.
c. Date Filed: November 19, 2010.
d. Submitted By: Grand River Dam
Authority.
e. Name of Project: Salina Pumped
Storage Project.
f. Location: In Mayes County,
Oklahoma on the Saline Creek arm of
Lake Hudson, in the Grand River
watershed. There are no federal lands to
be used by the project.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contacts: Dr.
Darrell E. Townsend II, Director of
Ecosystems Management, and Mr.
Charles Atkins, Superintendent of
Hydro Operations, Grand River Dam
Authority, P.O. Box 70, Langley, OK
74350–0070.
i. FERC Contact: Stephen Bowler at
(202) 502– 6861,
stephen.bowler@ferc.gov; or Jeanne
Edwards at (202) 502–6181,
jeanne.edwards@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 76, Number 17 (Wednesday, January 26, 2011)]
[Notices]
[Pages 4648-4649]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1565]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL11-15-000; QF86-36-005]
PowerSmith Cogeneration Project, LP; Notice of Filing
January 19, 2011.
Take notice that on January 13, 2011, PowerSmith Cogeneration
Project, LP (PowerSmith), pursuant to section
[[Page 4649]]
292.205 of the Federal Energy Regulatory Commission's (Commission)
Regulations implementing the Public Utility Regulatory Policies Act of
1978, as amended (PURPA), 18 CFR 292.205(c) (2007), filed a request for
a one-year waiver of the operation standard set forth in section
292.205(a)(1) of the Commission's Regulations for the topping-cycle
cogeneration facility owned and operated by PowerSmith located in
Oklahoma.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1565 Filed 1-25-11; 8:45 am]