Grand River Dam Authority; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests, 4649-4650 [2011-1564]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 76, No. 17 / Wednesday, January 26, 2011 / Notices
292.205 of the Federal Energy
Regulatory Commission’s (Commission)
Regulations implementing the Public
Utility Regulatory Policies Act of 1978,
as amended (PURPA), 18 CFR
292.205(c) (2007), filed a request for a
one-year waiver of the operation
standard set forth in section
292.205(a)(1) of the Commission’s
Regulations for the topping-cycle
cogeneration facility owned and
operated by PowerSmith located in
Oklahoma.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1565 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:27 Jan 25, 2011
Jkt 223001
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–2692–000]
ACS Energy Services, Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, ACS
Energy Services, Inc.’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 8,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
Frm 00041
Fmt 4703
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–1577 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
January 19, 2011.
PO 00000
4649
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 2524–018]
Grand River Dam Authority; Notice of
Intent To File License Application,
Filing of Pre-Application Document
(PAD), Commencement of Pre-Filing
Process, and Scoping; Request for
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
January 18, 2011.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process
b. Project No.: 2524–018.
c. Date Filed: November 19, 2010.
d. Submitted By: Grand River Dam
Authority.
e. Name of Project: Salina Pumped
Storage Project.
f. Location: In Mayes County,
Oklahoma on the Saline Creek arm of
Lake Hudson, in the Grand River
watershed. There are no federal lands to
be used by the project.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contacts: Dr.
Darrell E. Townsend II, Director of
Ecosystems Management, and Mr.
Charles Atkins, Superintendent of
Hydro Operations, Grand River Dam
Authority, P.O. Box 70, Langley, OK
74350–0070.
i. FERC Contact: Stephen Bowler at
(202) 502– 6861,
stephen.bowler@ferc.gov; or Jeanne
Edwards at (202) 502–6181,
jeanne.edwards@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
E:\FR\FM\26JAN1.SGM
26JAN1
mstockstill on DSKH9S0YB1PROD with NOTICES
4650
Federal Register / Vol. 76, No. 17 / Wednesday, January 26, 2011 / Notices
document cannot also intervene. 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service under section
7 of the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, Part 402; and (b) the State
Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Grand River Dam Authority filed
with the Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to, and from,
Commission staff related to the merits of
the potential application must be filed
with the Commission. Documents may
be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
VerDate Mar<15>2010
17:27 Jan 25, 2011
Jkt 223001
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Salina Pumped Storage Project)
and number (P–2524–018), and bear the
appropriate heading: ‘‘Comments on PreApplication Document,’’ ‘‘Study
Requests,’’ ‘‘Comments on Scoping
Document 1,’’ ‘‘Request for Cooperating
Agency Status,’’ or ‘‘Communications to
and from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by March 19, 2011.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, the
meetings outlined below will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Afternoon Scoping Meeting
Date: Tuesday, February 15, 2011.
Time: 1 p.m. to 3 p.m. (CST).
Location: Grand River Dam Authority
Ecosystems and Education Center, 420
E. Hwy 28, Langley, Oklahoma 74350.
Evening Scoping Meeting
Date: Tuesday, February 15, 2011.
Time: 6 p.m. to 8 p.m. (CST).
Location: Grand River Dam Authority
Ecosystems and Education Center, 420
E. Hwy 28, Langley, Oklahoma 74350.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
PO 00000
Frm 00042
Fmt 4703
Sfmt 9990
for accessing information in paragraph
n.
Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
environmental site review of the project
on Tuesday, February 15, 2011, starting
at 10 a.m. We invite all interested
agencies, Indian tribes, NGOs, and
individuals to attend the environmental
site review. To participate in the
environmental site review you must
register with Ms. Jacklyn Jaggars
(jjaggars@grda.com, or 918–256–0723)
of the Grand River Dam Authority on, or
before, Monday, February 7, 2011.
Meeting Objectives
At the scoping meetings, staff will:
(1) Initiate scoping of the issues; (2)
review and discuss existing conditions
and resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activities that incorporates the
time frames provided for in Part 5 of the
Commission’s regulations, and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public record of the project.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1564 Filed 1–25–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 76, Number 17 (Wednesday, January 26, 2011)]
[Notices]
[Pages 4649-4650]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1564]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2524-018]
Grand River Dam Authority; Notice of Intent To File License
Application, Filing of Pre-Application Document (PAD), Commencement of
Pre-Filing Process, and Scoping; Request for Comments on the PAD and
Scoping Document, and Identification of Issues and Associated Study
Requests
January 18, 2011.
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process
b. Project No.: 2524-018.
c. Date Filed: November 19, 2010.
d. Submitted By: Grand River Dam Authority.
e. Name of Project: Salina Pumped Storage Project.
f. Location: In Mayes County, Oklahoma on the Saline Creek arm of
Lake Hudson, in the Grand River watershed. There are no federal lands
to be used by the project.
g. Filed Pursuant to: 18 CFR Part 5 of the Commission's
Regulations.
h. Potential Applicant Contacts: Dr. Darrell E. Townsend II,
Director of Ecosystems Management, and Mr. Charles Atkins,
Superintendent of Hydro Operations, Grand River Dam Authority, P.O. Box
70, Langley, OK 74350-0070.
i. FERC Contact: Stephen Bowler at (202) 502- 6861,
stephen.bowler@ferc.gov; or Jeanne Edwards at (202) 502-6181,
jeanne.edwards@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item o below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental
[[Page 4650]]
document cannot also intervene. 94 FERC ] 61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service under section 7 of the
Endangered Species Act and the joint agency regulations thereunder at
50 CFR, Part 402; and (b) the State Historic Preservation Officer, as
required by section 106, National Historical Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Grand River Dam Authority filed with the Commission a Pre-
Application Document (PAD; including a proposed process plan and
schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
m. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for cooperating agency status, and
all communications to, and from, Commission staff related to the merits
of the potential application must be filed with the Commission.
Documents may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
All filings with the Commission must include on the first page, the
project name (Salina Pumped Storage Project) and number (P-2524-018),
and bear the appropriate heading: ``Comments on Pre-Application
Document,'' ``Study Requests,'' ``Comments on Scoping Document 1,''
``Request for Cooperating Agency Status,'' or ``Communications to and
from Commission Staff.'' Any individual or entity interested in
submitting study requests, commenting on the PAD or SD1, and any agency
requesting cooperating status must do so by March 19, 2011.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, the meetings outlined
below will satisfy the NEPA scoping requirements, irrespective of
whether an EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the time and place noted below. We invite all interested
individuals, organizations, and agencies to attend one or both of the
meetings, and to assist staff in identifying particular study needs, as
well as the scope of environmental issues to be addressed in the
environmental document. The times and locations of these meetings are
as follows:
Afternoon Scoping Meeting
Date: Tuesday, February 15, 2011.
Time: 1 p.m. to 3 p.m. (CST).
Location: Grand River Dam Authority Ecosystems and Education
Center, 420 E. Hwy 28, Langley, Oklahoma 74350.
Evening Scoping Meeting
Date: Tuesday, February 15, 2011.
Time: 6 p.m. to 8 p.m. (CST).
Location: Grand River Dam Authority Ecosystems and Education
Center, 420 E. Hwy 28, Langley, Oklahoma 74350.
Scoping Document 1 (SD1), which outlines the subject areas to be
addressed in the environmental document, was mailed to the individuals
and entities on the Commission's mailing list. Copies of SD1 will be
available at the scoping meetings, or may be viewed on the Web at
https://www.ferc.gov, using the ``eLibrary'' link. Follow the directions
for accessing information in paragraph n.
Based on all oral and written comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a revised process plan and schedule, as
well as a list of issues, identified through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
environmental site review of the project on Tuesday, February 15, 2011,
starting at 10 a.m. We invite all interested agencies, Indian tribes,
NGOs, and individuals to attend the environmental site review. To
participate in the environmental site review you must register with Ms.
Jacklyn Jaggars (jjaggars@grda.com, or 918-256-0723) of the Grand River
Dam Authority on, or before, Monday, February 7, 2011.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activities that
incorporates the time frames provided for in Part 5 of the Commission's
regulations, and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public record of the project.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1564 Filed 1-25-11; 8:45 am]
BILLING CODE 6717-01-P