Verdant Power, LLC (Verdant); Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 4097 [2011-1286]
Download as PDF
Federal Register / Vol. 76, No. 15 / Monday, January 24, 2011 / Notices
Relay Service (FIRS) at 1–800–877–
8339.
[FR Doc. 2011–1355 Filed 1–21–11; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–005]
Verdant Power, LLC (Verdant); Notice
of Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
January 13, 2011.
Take notice that the following
hydrokinetic pilot project license
application has been filed with the
Commission and is available for public
inspection.
a. Type of Application: Pilot License.
b. Project No.: 12611–005.
c. Date Filed: December 29, 2010.
d. Applicant: Verdant Power, LLC
(Verdant).
e. Name of Project: Roosevelt Island
Tidal Energy (RITE) Project.
f. Location: The proposed project
would be located on the East River in
New York City, New York. The project
does not affect Federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–828(c).
h. Applicant Contact: Ronald F.
Smith, Verdant Power, LLC, The
Octagon, 888 Main Street, New York,
NY 10044; telephone (212) 888–8887
(extension 601).
i. FERC Contact: Timothy Konnert,
(202) 502–6359 or
timothy.konnert@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
primary project facilities would include:
(1) Three 35-kilowatt (kW), 5-meterdiameter axial flow Kinetic System
turbine generator units mounted on a
single triframe mount, with a total
installed capacity of 105 kW, in Phase
1; (2) nine additional 5-meter-diameter
axial flow Kinetic System turbine
generator units mounted on three
triframe mounts, with a total installed
capacity of 420 kW, in Phase 2; (3)
eighteen additional 5-meter-diameter
axial flow Kinetic System turbine
generator units mounted on six triframe
mounts, with a total installed capacity
of 1,050 kW, in Phase 3; (4) 480-volt
underwater cables from each turbine to
five shoreline switchgear vaults that
would interconnect to a control room
and interconnection points; and (5)
appurtenant facilities for navigation
safety and operation. The project is
estimated to have an annual generation
of between 1,680 and 2,400 megawatthours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of requested additional information ...............................................................................................................................
Commission issues REA notice ..............................................................................................................................................
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ..................................
Commission issues Single EA .................................................................................................................................................
Comments on EA ....................................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–1286 Filed 1–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2713–082]
Erie Boulevard Hydropower, L.P.;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
mstockstill on DSKH9S0YB1PROD with NOTICES
January 13, 2011.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2713–082.
c. Date Filed: December 30, 2010.
d. Applicant: Erie Boulevard
Hydropower, L.P.
VerDate Mar<15>2010
15:51 Jan 21, 2011
Jkt 223001
PO 00000
Frm 00010
Fmt 4703
4097
Sfmt 4703
January 28, 2011.
February 2, 2011.
March 4, 2011.
May 3, 2011.
June 2, 2011.
e. Name of Project: Oswegatchie River
Hydroelectric Project.
f. Location: The existing multidevelopment project is located on the
Oswegatchie River in St. Lawrence
County, New York. The project does not
affect Federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Jon Elmer, Erie
Boulevard Hydropower, L.P, 800
Starbuck Ave., Suite 802, Watertown,
New York 13601, (315) 779–2401.
i. FERC Contact: John Baummer, (202)
502–6837 or john.baummer@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Oswegatchie River
Hydroelectric Project consists of six
developments with an installed capacity
of 30.32 megawatts (MW) and an
average annual generation of 123,769
megawatt-hours. The six developments,
E:\FR\FM\24JAN1.SGM
24JAN1
Agencies
[Federal Register Volume 76, Number 15 (Monday, January 24, 2011)]
[Notices]
[Page 4097]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1286]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12611-005]
Verdant Power, LLC (Verdant); Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
January 13, 2011.
Take notice that the following hydrokinetic pilot project license
application has been filed with the Commission and is available for
public inspection.
a. Type of Application: Pilot License.
b. Project No.: 12611-005.
c. Date Filed: December 29, 2010.
d. Applicant: Verdant Power, LLC (Verdant).
e. Name of Project: Roosevelt Island Tidal Energy (RITE) Project.
f. Location: The proposed project would be located on the East
River in New York City, New York. The project does not affect Federal
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-828(c).
h. Applicant Contact: Ronald F. Smith, Verdant Power, LLC, The
Octagon, 888 Main Street, New York, NY 10044; telephone (212) 888-8887
(extension 601).
i. FERC Contact: Timothy Konnert, (202) 502-6359 or
timothy.konnert@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The primary project facilities would
include: (1) Three 35-kilowatt (kW), 5-meter-diameter axial flow
Kinetic System turbine generator units mounted on a single triframe
mount, with a total installed capacity of 105 kW, in Phase 1; (2) nine
additional 5-meter-diameter axial flow Kinetic System turbine generator
units mounted on three triframe mounts, with a total installed capacity
of 420 kW, in Phase 2; (3) eighteen additional 5-meter-diameter axial
flow Kinetic System turbine generator units mounted on six triframe
mounts, with a total installed capacity of 1,050 kW, in Phase 3; (4)
480-volt underwater cables from each turbine to five shoreline
switchgear vaults that would interconnect to a control room and
interconnection points; and (5) appurtenant facilities for navigation
safety and operation. The project is estimated to have an annual
generation of between 1,680 and 2,400 megawatt-hours.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of requested additional January 28, 2011.
information.
Commission issues REA notice........ February 2, 2011.
Filing of recommendations, March 4, 2011.
preliminary terms and conditions,
and preliminary fishway
prescriptions.
Commission issues Single EA........ May 3, 2011.
Comments on EA...................... June 2, 2011.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1286 Filed 1-21-11; 8:45 am]
BILLING CODE 6717-01-P