Public Utility No. 1 of Snohomish County; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 4099 [2011-1281]

Download as PDF Federal Register / Vol. 76, No. 15 / Monday, January 24, 2011 / Notices (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/ Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues EA Comments on EA ......... Modified terms and conditions. February 28, 2011. April 28, 2011 August 2011. September 2011. November 2011. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. 2011–1285 Filed 1–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13948–000] Public Utility No. 1 of Snohomish County; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications mstockstill on DSKH9S0YB1PROD with NOTICES January 14, 2011. On December 20, 2010, the Public Utility No. 1 of Snohomish County, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Calligan Creek Hydroelectric Project (project) to be located on Calligan Creek, near North Bend in King County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit VerDate Mar<15>2010 15:51 Jan 21, 2011 Jkt 223001 holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 8-foot-high, 60-footlong diversion weir and intake structure; (2) an impoundment having a total storage capacity of one acre-foot at a normal maximum operating elevation of 2,221 feet mean sea level; (3) a 6,288foot-long, 38-inch-diameter buried pressure penstock; (4) a 2,600-squarefoot powerhouse containing a single turbine/generator unit with an installed capacity of 6.0 megawatts; (5) a 148foot-long, 10-foot-wide rip-rap open channel tailrace; (6) a switchyard containing a 4.16/34.5 three-phase stepup transformer; (7) a 13,200-foot-long, 34.5 kilovolt three-phase buried transmission line and (8) appurtenant facilities. The estimated annual generation of the project would be 20,717.8 megawatt-hours. Applicant Contact: Mr. Kim D. Moore, Assistant General Manager of Generation Resources; Public Utility No. 1 of Snohomish County; 2320 California Street; Everett, WA 98201; phone: 425– 783–8606. FERC Contact: Kelly Wolcott; phone: (202) 502–6480. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 4099 link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13948–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2011–1281 Filed 1–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 January 18, 2011. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP06–298–013. Applicants: Public Service Commission of New York v. Description: Semi-Annual Report of Operational Sales of Gas for the period of 07/01/10–12/21/10 of National Fuel Gas Supply Corporation. Filed Date: 01/13/2011. Accession Number: 20110113–5071. Comment Date: 5 p.m. Eastern Time on Tuesday, January 25, 2011. Docket Numbers: RP10–778–002. Applicants: Stingray Pipeline Company, L.L.C. Description: Stingray Pipeline Company, L.L.C. submits tariff filing per 154.203: Baseline Compliance Filing to be effective 6/30/2010. Filed Date: 01/13/2011. Accession Number: 20110113–5111. Comment Date: 5 p.m. Eastern Time on Tuesday, January 25, 2011. Docket Numbers: RP11–1605–001. Applicants: Algonquin Gas Transmission, LLC. Description: Algonquin Gas Transmission, LLC submits tariff filing per 154.203: OFO Compliance Filing (2) to be effective 1/8/2011. Filed Date: 01/13/2011. Accession Number: 20110113–5123. Comment Date: 5 p.m. Eastern Time on Tuesday, January 25, 2011. Docket Numbers: RP10–1371–001. Applicants: Caledonia Energy Partners, L.L.C. Description: Caledonia Energy Partners, L.L.C. submits tariff filing per 154.203: Caledonia Energy Partners Baseline Tariff to be effective 9/30/2010. Filed Date: 01/14/2011. Accession Number: 20110114–5149. Comment Date: 5 p.m. Eastern Time on Wednesday, January 26, 2011. E:\FR\FM\24JAN1.SGM 24JAN1

Agencies

[Federal Register Volume 76, Number 15 (Monday, January 24, 2011)]
[Notices]
[Page 4099]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1281]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13948-000]


Public Utility No. 1 of Snohomish County; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

January 14, 2011.
    On December 20, 2010, the Public Utility No. 1 of Snohomish County, 
filed an application for a preliminary permit, pursuant to section 4(f) 
of the Federal Power Act (FPA), proposing to study the feasibility of 
the Calligan Creek Hydroelectric Project (project) to be located on 
Calligan Creek, near North Bend in King County, Washington. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A 8-foot-
high, 60-foot-long diversion weir and intake structure; (2) an 
impoundment having a total storage capacity of one acre-foot at a 
normal maximum operating elevation of 2,221 feet mean sea level; (3) a 
6,288-foot-long, 38-inch-diameter buried pressure penstock; (4) a 
2,600-square-foot powerhouse containing a single turbine/generator unit 
with an installed capacity of 6.0 megawatts; (5) a 148-foot-long, 10-
foot-wide rip-rap open channel tailrace; (6) a switchyard containing a 
4.16/34.5 three-phase step-up transformer; (7) a 13,200-foot-long, 34.5 
kilovolt three-phase buried transmission line and (8) appurtenant 
facilities. The estimated annual generation of the project would be 
20,717.8 megawatt-hours.
    Applicant Contact: Mr. Kim D. Moore, Assistant General Manager of 
Generation Resources; Public Utility No. 1 of Snohomish County; 2320 
California Street; Everett, WA 98201; phone: 425-783-8606.
    FERC Contact: Kelly Wolcott; phone: (202) 502-6480.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13948-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1281 Filed 1-21-11; 8:45 am]
BILLING CODE 6717-01-P