Sunshine Act Meeting Notice, 3625-3626 [2011-1238]

Download as PDF Federal Register / Vol. 76, No. 13 / Thursday, January 20, 2011 / Notices authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 1, 2011. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Item No. Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 3625 government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: Federal Energy Regulatory Commission. AGENCY HOLDING MEETING: January 20, 2011, 9 a.m. *NOTE—There has been a time change for this meeting only. DATE AND TIME: Room 2C, 888 First Street, NE., Washington, DC 20426. PLACE: STATUS: Open. MATTERS TO BE CONSIDERED: Agenda, *NOTE—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: January 13, 2011. Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. The following notice of meeting is published pursuant to section 3(a) of the 966th—Meeting, Regular Meeting, January 20, 2011, 9 a.m. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–1104 Filed 1–19–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice Docket No. Company ADMINISTRATIVE A–1 ........ A–2 ........ A–3 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ AD11–8–000 ................................................ Discussion on RTO/ISO Performance Metrics. Customer Matters, Reliability, Security and Market Operations. Frequency Response Metrics to Assess Requirements for Reliable Integration of Variable Renewable Generation. ELECTRIC RM04–7–009 ............................................... E–2 E–3 E–4 E–5 mstockstill on DSKH9S0YB1PROD with NOTICES E–1 ........ RM10–20–000 ............................................. OMITTED. RM08–13–001 ............................................. ER11–2170–000, ER09–408–002, ER09– 408–003. ER11–2183–000 .......................................... ER10–1281–001 .......................................... ER10–713–001, ER10–713–002 ................ OMITTED. OMITTED. RD10–6–000, RD09–7–002 ........................ OA07–110–003 ........................................... EL10–64–002 .............................................. EL10–66–002 .............................................. ........ ........ ........ ........ E–6 ........ E–7 ........ E–8 ........ E–9 ........ E–10 ...... E–11 ...... E–12 ...... E–13 ...... E–14 ...... E–15 ...... E–16 ...... E–17 ...... ER11–2178–000 .......................................... ER11–2177–000 .......................................... ER11–2369–000 .......................................... ER11–2074–000 .......................................... QM10–4–004 ............................................... VerDate Mar<15>2010 18:24 Jan 19, 2011 Jkt 223001 PO 00000 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities. Market-Based Rate Affiliate Restrictions. Transmission Relay Loadability Reliability Standard. PacifiCorp. American Electric Power Service Corporation. Hudson Transmission Partners, LLC. PJM Interconnection, L.L.C. and Carolina Power & Light Company. North American Electric Reliability Corporation. NorthWestern Corporation. California Public Utilities Commission. Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company. Southern California Edison Company. Southern California Edison Company. California Independent System Operator Corporation. PJM Interconnection, L.L.C. Public Service Company of New Hampshire. Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\20JAN1.SGM 20JAN1 3626 Federal Register / Vol. 76, No. 13 / Thursday, January 20, 2011 / Notices Item No. Docket No. Company MULTI–INDUSTRY M–1 ........ RM07–9–003 ............................................... Revisions to Forms, Statements and Reporting Requirements for Natural Gas Pipelines. HYDRO H–1 ........ H–2 ........ P–13653–001 .............................................. P–10482–105 .............................................. Claverack Creek, LLC. AER NY–Gen, LLC, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC. CERTIFICATES C–1 C–2 C–3 C–4 ........ ........ ........ ........ CP10–496–000 ............................................ CP10–194–000 ............................................ CP07–414–002 ............................................ CP11–34–000 .............................................. Kimberly D. Bose, Secretary. A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2011–1238 Filed 1–18–11; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSKH9S0YB1PROD with NOTICES [Project No. 13808–000; Project No. 13813– 000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing January 12, 2011. On July 12, 2010, at 8:30 a.m., the Commission received two preliminary permit applications for proposed VerDate Mar<15>2010 18:24 Jan 19, 2011 Jkt 223001 Cameron LNG, LLC. Central New York Oil and Gas Company, LLC. Golden Triangle Storage, Inc. Golden Pass Pipeline LLC. projects to be located at the New Savannah Bluff Lock and Dam on the Savannah River, near Augusta, Georgia.1 The applications were filed by Lock+ Hydro Friends Fund XLIX, for Project No. 13808–000, and FFP Missouri 14, LLC, for Project No. 13813–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On January 18, 2011, at 2 p.m. (Eastern Time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First Street, NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Friday July 9, 2010, and 8:30 a.m. on Monday July 12, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011–1065 Filed 1–19–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP11–1566–000] Tennessee Gas Pipeline Company; Notice of Technical Conference January 12, 2011. On November 30, 2010, pursuant to section 4 of the Natural Gas Act (NGA), Tennessee Gas Pipeline Company (Tennessee) filed revised tariff records proposing a rate increase for existing services and changes to certain terms and conditions of service, including elimination of certain rate schedules. On December 29, 2010 the Commission accepted and suspended the primary tariff records proposed to be effective June 1, 2011, subject to refund and to the outcome of a hearing and technical conference. Tennessee Gas Pipeline Company, 133 FERC ¶ 61,266 (2010). Take notice that a technical conference to discuss non-rate issues raised by Tennessee’s filing will be held on Wednesday, February 2, 2011 at 10 a.m. (EST) and Thursday, February 3, 2011 at 10 a.m. (EST), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Federal Energy Regulatory Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208– E:\FR\FM\20JAN1.SGM 20JAN1

Agencies

[Federal Register Volume 76, Number 13 (Thursday, January 20, 2011)]
[Notices]
[Pages 3625-3626]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1238]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

January 13, 2011.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING:  Federal Energy Regulatory Commission.

DATE AND TIME: January 20, 2011, 9 a.m. *NOTE--There has been a time 
change for this meeting only.

PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda, *NOTE--Items listed on the agenda may 
be deleted without further notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at  https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

966th--Meeting, Regular Meeting, January 20, 2011, 9 a.m.

----------------------------------------------------------------------------------------------------------------
        Item No.                     Docket No.                                    Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1.....................  AD02-1-000......................  Discussion on RTO/ISO Performance Metrics.
A-2.....................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                             Operations.
A-3.....................  AD11-8-000......................  Frequency Response Metrics to Assess Requirements
                                                             for Reliable Integration of Variable Renewable
                                                             Generation.
----------------------------------------------------------------------------------------------------------------
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1.....................  RM04-7-009......................  Market-Based Rates for Wholesale Sales of Electric
                                                             Energy, Capacity and Ancillary Services by Public
                                                             Utilities.
E-2.....................  RM10-20-000.....................  Market-Based Rate Affiliate Restrictions.
E-3.....................  OMITTED.........................
E-4.....................  RM08-13-001.....................  Transmission Relay Loadability Reliability Standard.
E-5.....................  ER11-2170-000, ER09-408-002,      PacifiCorp.
                           ER09-408-003.
E-6.....................  ER11-2183-000...................  American Electric Power Service Corporation.
E-7.....................  ER10-1281-001...................  Hudson Transmission Partners, LLC.
E-8.....................  ER10-713-001, ER10-713-002......  PJM Interconnection, L.L.C. and Carolina Power &
                                                             Light Company.
E-9.....................  OMITTED.........................
E-10....................  OMITTED.........................
E-11....................  RD10-6-000, RD09-7-002..........  North American Electric Reliability Corporation.
E-12....................  OA07-110-003....................  NorthWestern Corporation.
E-13....................  EL10-64-002.....................  California Public Utilities Commission.
                           EL10-66-002....................  Southern California Edison Company, Pacific Gas and
                                                             Electric Company, San Diego Gas & Electric Company.
E-14....................  ER11-2178-000...................  Southern California Edison Company.
E-15....................  ER11-2177-000...................  Southern California Edison Company.
                          ER11-2369-000...................  California Independent System Operator Corporation.
E-16....................  ER11-2074-000...................  PJM Interconnection, L.L.C.
E-17....................  QM10-4-004......................  Public Service Company of New Hampshire.
----------------------------------------------------------------------------------------------------------------

[[Page 3626]]

 
                                                 MULTI-INDUSTRY
----------------------------------------------------------------------------------------------------------------
M-1.....................  RM07-9-003......................  Revisions to Forms, Statements and Reporting
                                                             Requirements for Natural Gas Pipelines.
----------------------------------------------------------------------------------------------------------------
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1.....................  P-13653-001.....................  Claverack Creek, LLC.
H-2.....................  P-10482-105.....................  AER NY-Gen, LLC, Eagle Creek Hydro Power, LLC, Eagle
                                                             Creek Water Resources, LLC, Eagle Creek Land
                                                             Resources, LLC.
----------------------------------------------------------------------------------------------------------------
                                                  CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1.....................  CP10-496-000....................  Cameron LNG, LLC.
C-2.....................  CP10-194-000....................  Central New York Oil and Gas Company, LLC.
C-3.....................  CP07-414-002....................  Golden Triangle Storage, Inc.
C-4.....................  CP11-34-000.....................  Golden Pass Pipeline LLC.
----------------------------------------------------------------------------------------------------------------


Kimberly D. Bose,
Secretary.
    A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2011-1238 Filed 1-18-11; 4:15 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.