Drawbridge Operation Regulations; Merrimack River, Newburyport and Salisbury, MA, 3516 [2011-1196]
Download as PDF
3516
Federal Register / Vol. 76, No. 13 / Thursday, January 20, 2011 / Rules and Regulations
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1090]
Drawbridge Operation Regulations;
Harlem River, New York City, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the 103rd Street (Wards
Island) Bridge at mile 0.0, across the
Harlem River, New York City, New
York. The deviation is necessary to
facilitate bridge rehabilitation
maintenance. This deviation allows the
bridge to remain in the closed position
for one hundred nineteen days.
DATES: This deviation is effective from
January 10, 2011 through April 29,
2011.
SUMMARY:
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1090 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1090 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Joe Arca, Project Officer,
First Coast Guard District,
joe.m.arca@uscg.mil telephone (212)
668–7165. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The 103rd
Street (Wards Island) Bridge across the
Harlem River at mile 0.0 has a vertical
clearance in the closed position of 55
feet at mean high water and 60 feet at
mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.789(b)(1).
The waterway has seasonal
recreational vessels, and commercial
vessels of various sizes.
The owner of the bridge, New York
City Department of Transportation,
requested a temporary deviation to
jlentini on DSKJ8SOYB1PROD with RULES
ADDRESSES:
VerDate Mar<15>2010
16:17 Jan 19, 2011
Jkt 223001
facilitate rehabilitation construction at
the bridge.
Under this temporary deviation the
103rd Street (Wards Island) Bridge, may
remain in the closed position from
January 10, 2011 through April 29,
2011. Vessels that can pass under the
bridge without a bridge opening may do
so at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 5, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–1194 Filed 1–19–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1134]
Drawbridge Operation Regulations;
Merrimack River, Newburyport and
Salisbury, MA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Newburyport US1
Bridge across the Merrimack River, at
mile 3.4, between Newburyport and
Salisbury, Massachusetts. The deviation
is necessary to paint the bridge. This
deviation allows the bridge to remain in
the closed position.
DATES: This deviation is effective from
February 15, 2011 through April 30,
2011.
SUMMARY:
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1134 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1134 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
ADDRESSES:
PO 00000
Frm 00032
Fmt 4700
Sfmt 4700
If
you have questions on this rule, call or
e-mail Mr. John McDonald, Project
Officer, First Coast Guard District,
john.w.mcdonald@uscg.mil, or
telephone (617) 223–8364. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Newburyport US1 Bridge, across the
Merrimack River at mile 3.4, between
Newburyport and Salisbury,
Massachusetts, has a vertical clearance
in the closed position of 35 feet at mean
high water and 42 feet at mean low
water. The drawbridge operation
regulations are listed at 33 CFR 117.605.
The owner of the bridge,
Massachusetts Department of
Transportation, requested a temporary
deviation from the regulations to
facilitate scheduled bridge painting at
the bridge.
The waterway is predominantly
recreational vessels. This temporary
deviation is being scheduled during the
winter months when the bridge
normally does not receive requests to
open.
Under this temporary deviation the
Newburyport US1 Bridge may remain in
the closed position from February 15,
2011 through April 30, 2011.
Vessels that can pass under the bridge
in the closed position may do so at any
time.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
FOR FURTHER INFORMATION CONTACT:
Dated: January 5, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–1196 Filed 1–19–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1141]
Drawbridge Operation Regulation; Gulf
Intracoastal Waterway, Belle Chasse,
LA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
E:\FR\FM\20JAR1.SGM
20JAR1
Agencies
[Federal Register Volume 76, Number 13 (Thursday, January 20, 2011)]
[Rules and Regulations]
[Page 3516]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1196]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-1134]
Drawbridge Operation Regulations; Merrimack River, Newburyport
and Salisbury, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Newburyport US1 Bridge across the Merrimack River, at mile 3.4, between
Newburyport and Salisbury, Massachusetts. The deviation is necessary to
paint the bridge. This deviation allows the bridge to remain in the
closed position.
DATES: This deviation is effective from February 15, 2011 through April
30, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-1134 and are available online
at https://www.regulations.gov, inserting USCG-2010-1134 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. John McDonald, Project Officer, First Coast Guard
District, john.w.mcdonald@uscg.mil, or telephone (617) 223-8364. If you
have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Newburyport US1 Bridge, across the
Merrimack River at mile 3.4, between Newburyport and Salisbury,
Massachusetts, has a vertical clearance in the closed position of 35
feet at mean high water and 42 feet at mean low water. The drawbridge
operation regulations are listed at 33 CFR 117.605.
The owner of the bridge, Massachusetts Department of
Transportation, requested a temporary deviation from the regulations to
facilitate scheduled bridge painting at the bridge.
The waterway is predominantly recreational vessels. This temporary
deviation is being scheduled during the winter months when the bridge
normally does not receive requests to open.
Under this temporary deviation the Newburyport US1 Bridge may
remain in the closed position from February 15, 2011 through April 30,
2011.
Vessels that can pass under the bridge in the closed position may
do so at any time.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 5, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-1196 Filed 1-19-11; 8:45 am]
BILLING CODE 9110-04-P