Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing, 3626 [2011-1065]

Download as PDF 3626 Federal Register / Vol. 76, No. 13 / Thursday, January 20, 2011 / Notices Item No. Docket No. Company MULTI–INDUSTRY M–1 ........ RM07–9–003 ............................................... Revisions to Forms, Statements and Reporting Requirements for Natural Gas Pipelines. HYDRO H–1 ........ H–2 ........ P–13653–001 .............................................. P–10482–105 .............................................. Claverack Creek, LLC. AER NY–Gen, LLC, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC. CERTIFICATES C–1 C–2 C–3 C–4 ........ ........ ........ ........ CP10–496–000 ............................................ CP10–194–000 ............................................ CP07–414–002 ............................................ CP11–34–000 .............................................. Kimberly D. Bose, Secretary. A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2011–1238 Filed 1–18–11; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSKH9S0YB1PROD with NOTICES [Project No. 13808–000; Project No. 13813– 000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing January 12, 2011. On July 12, 2010, at 8:30 a.m., the Commission received two preliminary permit applications for proposed VerDate Mar<15>2010 18:24 Jan 19, 2011 Jkt 223001 Cameron LNG, LLC. Central New York Oil and Gas Company, LLC. Golden Triangle Storage, Inc. Golden Pass Pipeline LLC. projects to be located at the New Savannah Bluff Lock and Dam on the Savannah River, near Augusta, Georgia.1 The applications were filed by Lock+ Hydro Friends Fund XLIX, for Project No. 13808–000, and FFP Missouri 14, LLC, for Project No. 13813–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On January 18, 2011, at 2 p.m. (Eastern Time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First Street, NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Friday July 9, 2010, and 8:30 a.m. on Monday July 12, 2010. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010). 2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011–1065 Filed 1–19–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP11–1566–000] Tennessee Gas Pipeline Company; Notice of Technical Conference January 12, 2011. On November 30, 2010, pursuant to section 4 of the Natural Gas Act (NGA), Tennessee Gas Pipeline Company (Tennessee) filed revised tariff records proposing a rate increase for existing services and changes to certain terms and conditions of service, including elimination of certain rate schedules. On December 29, 2010 the Commission accepted and suspended the primary tariff records proposed to be effective June 1, 2011, subject to refund and to the outcome of a hearing and technical conference. Tennessee Gas Pipeline Company, 133 FERC ¶ 61,266 (2010). Take notice that a technical conference to discuss non-rate issues raised by Tennessee’s filing will be held on Wednesday, February 2, 2011 at 10 a.m. (EST) and Thursday, February 3, 2011 at 10 a.m. (EST), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Federal Energy Regulatory Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–208– E:\FR\FM\20JAN1.SGM 20JAN1

Agencies

[Federal Register Volume 76, Number 13 (Thursday, January 20, 2011)]
[Notices]
[Page 3626]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-1065]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13808-000; Project No. 13813-000]


Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice 
Announcing Preliminary Permit Drawing

January 12, 2011.
    On July 12, 2010, at 8:30 a.m., the Commission received two 
preliminary permit applications for proposed projects to be located at 
the New Savannah Bluff Lock and Dam on the Savannah River, near 
Augusta, Georgia.\1\ The applications were filed by Lock+ Hydro Friends 
Fund XLIX, for Project No. 13808-000, and FFP Missouri 14, LLC, for 
Project No. 13813-000.
---------------------------------------------------------------------------

    \1\ The Commission is open each day from 8:30 a.m. to 5 p.m., 
except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). 
The applications were filed between 5 p.m. on Friday July 9, 2010, 
and 8:30 a.m. on Monday July 12, 2010. Under the Commission's Rules 
of Practice and Procedure, any document received after regular 
business hours is considered filed at 8:30 a.m. on the next regular 
business day. 18 CFR 385.2001(a)(2) (2010).
---------------------------------------------------------------------------

    Where all permit applicants are municipalities or all permit 
applicants are non-municipalities, and no applicant's plans are better 
adapted than the others' to develop, conserve, and utilize in the 
public interest the water resources of a region, the Commission issues 
a permit to the applicant who filed first in time.\2\ In this case, 
because two applications from entities not claiming municipal 
preference are deemed filed at the same time, the Commission will 
conduct a random tie breaker to determine priority. In the event that 
the Commission concludes that neither applicant's plans are better 
adapted than the other, priority will be determined accordingly.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, 
LLC, 126 FERC ] 61,132 (2009).
---------------------------------------------------------------------------

    On January 18, 2011, at 2 p.m. (Eastern Time), the Secretary of the 
Commission, or her designee, will, by random drawing, determine the 
filing priority for the two applicants identified in this notice. The 
drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First Street, NE., Washington, 
DC 20426. The results of the drawing will be recorded by the Secretary 
or her designee. A subsequent notice will be issued by the Secretary 
announcing the results of the drawing.

Kimberly D. Bose,
Secretary.