Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE/EIS-0462), 2903 [2011-897]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 76, No. 11 / Tuesday, January 18, 2011 / Notices
year period. The Commission in Order
No. 735 modified its policy concerning
periodic reviews of rates charges by
section 311 and Hinshaw pipelines to
extend the cycle for such reviews from
three to five years.1 Therefore, National
Fuel requests that the date for its next
rate filing be extended to February 12,
2013, which is five years from the date
of National Fuel’s most recent rate filing
with this Commission.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail FERC
OnlineSupport@ferc.gov, or call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
1 Contract Reporting Requirements of Intrastate
Natural Gas Companies, Order No. 735, 131 FERC
¶ 61,150 (May 20, 2010).
VerDate Mar<15>2010
16:24 Jan 14, 2011
Jkt 223001
Comment Date: 5 p.m. Eastern Time
on Wednesday, January 19, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–910 Filed 1–14–11; 8:45 am]
BILLING CODE 6717–01–P
2903
contact Carol M. Borgstrom, Director,
Office of NEPA Policy and Compliance,
GC–54, U.S. Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0119, telephone
(202) 586–4600 or (800) 472–2756,
facsimile (202) 586–7031.
NextEra
Energy Resources (NextEra) applied to
interconnect its proposed 150-megawatt
(MW) Hyde County Wind Energy Center
Project, located in Hyde County, South
Dakota, with the Western’s existing Fort
Thompson Substation in Buffalo
County, South Dakota. NextEra has also
applied to interconnect its proposed
150–MW Crowned Ridge Wind Energy
Center Project with Western’s existing
Watertown Substation in Codington
County, South Dakota. The proposed
Project would be located in Codington
and Grant counties, South Dakota.
Western is preparing separate EISs on
the proposals to interconnect the
projects in accordance with NEPA (42
U.S.C. 4321–4347); DOE NEPA
Implementing Procedures (10 CFR part
1021); and the CEQ regulations for
implementing NEPA (40 CFR parts
1500–1508).1
Separate Notices of Intent were
published in the Federal Register for
both proposed projects on November 30,
2010 (75 FR 74040 for Hyde County and
75 FR 74042 for Crowned Ridge).
Scoping meetings were held on
December 14, 2010, in Highmore, South
Dakota, for the Hyde County Project,
and on December 15, 2010, in
Watertown, South Dakota, for the
Crowned Ridge Project. The Notices of
Intent specified a 45-day public scoping
period, which would end on January 14,
2011. One commenter, writing on his
own behalf and that of other area
landowners, has requested an extension
of the public scoping period deadline to
January 30, 2011, due to the holidays.
Western is granting that request, and by
this notice and local advertising is
extending the formal scoping period to
midnight Monday, January 31, 2011.
SUPPLEMENTARY INFORMATION:
DEPARTMENT OF ENERGY
Western Area Power Administration
Interconnection of the Proposed Hyde
County Wind Energy Center Project
(DOE/EIS–0461), and Proposed
Crowned Ridge Wind Energy Center
Project (DOE/EIS–0462)
Western Area Power
Administration, DOE.
ACTION: Notice of Extension of Scoping
Comment Period.
AGENCY:
Western Area Power
Administration (Western) published
separate Notices of Intent to prepare
environmental impact statements (EISs)
for the Hyde County Wind Energy
Center Project and the Crowned Ridge
Wind Energy Center Project in the
Federal Register on November 30, 2010.
Both Notices of Intent specified a 45-day
public scoping period, which would
end on January 14, 2011. Western
received a request for an extension of
the public scoping period deadline to
January 30, 2010, due to the holidays.
Western is granting that request, and by
this notice and local advertising is
extending the formal scoping period to
midnight Monday, January 31, 2011.
DATES: The public scoping period
commenced with the publication of the
Federal Register notices on November
30, 2010, and will, with the extension
of time, end on midnight, January 31,
2011. Western will consider all
comments on the scope of the EISs
received or postmarked by that date.
The public is invited to submit
comments on either proposed project at
any time during the EIS process.
ADDRESSES: Oral or written comments
on the scope of either proposed project
may be mailed or e-mailed to Matt
Marsh, Upper Great Plains Regional
Office, Western Area Power
Administration, P.O. Box 35800,
Billings, MT 59107–5800, e-mail
MMarsh@wapa.gov, telephone (800)
358–3415.
FOR FURTHER INFORMATION CONTACT: For
additional information on the proposed
projects, the EIS process, or to receive
a copy of either Draft EIS when they are
published, contact Matt Marsh at the
address above. For general information
on the DOE’s NEPA review process,
SUMMARY:
PO 00000
Frm 00026
Fmt 4703
Sfmt 9990
Dated: January 10, 2011.
Timothy J. Meeks,
Administrator.
[FR Doc. 2011–897 Filed 1–14–11; 8:45 am]
BILLING CODE 6450–01–P
1 On October 4, 1999, DOE’s Assistant Secretary
for Environmental, Safety and Health delegated to
Western’s Administrator the authority to approve
EISs for integrating transmission facilities with
Western’s transmission grid.
E:\FR\FM\18JAN1.SGM
18JAN1
Agencies
[Federal Register Volume 76, Number 11 (Tuesday, January 18, 2011)]
[Notices]
[Page 2903]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-897]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Interconnection of the Proposed Hyde County Wind Energy Center
Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center
Project (DOE/EIS-0462)
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of Extension of Scoping Comment Period.
-----------------------------------------------------------------------
SUMMARY: Western Area Power Administration (Western) published separate
Notices of Intent to prepare environmental impact statements (EISs) for
the Hyde County Wind Energy Center Project and the Crowned Ridge Wind
Energy Center Project in the Federal Register on November 30, 2010.
Both Notices of Intent specified a 45-day public scoping period, which
would end on January 14, 2011. Western received a request for an
extension of the public scoping period deadline to January 30, 2010,
due to the holidays. Western is granting that request, and by this
notice and local advertising is extending the formal scoping period to
midnight Monday, January 31, 2011.
DATES: The public scoping period commenced with the publication of the
Federal Register notices on November 30, 2010, and will, with the
extension of time, end on midnight, January 31, 2011. Western will
consider all comments on the scope of the EISs received or postmarked
by that date. The public is invited to submit comments on either
proposed project at any time during the EIS process.
ADDRESSES: Oral or written comments on the scope of either proposed
project may be mailed or e-mailed to Matt Marsh, Upper Great Plains
Regional Office, Western Area Power Administration, P.O. Box 35800,
Billings, MT 59107-5800, e-mail MMarsh@wapa.gov, telephone (800) 358-
3415.
FOR FURTHER INFORMATION CONTACT: For additional information on the
proposed projects, the EIS process, or to receive a copy of either
Draft EIS when they are published, contact Matt Marsh at the address
above. For general information on the DOE's NEPA review process,
contact Carol M. Borgstrom, Director, Office of NEPA Policy and
Compliance, GC-54, U.S. Department of Energy, 1000 Independence Avenue,
SW., Washington, DC 20585-0119, telephone (202) 586-4600 or (800) 472-
2756, facsimile (202) 586-7031.
SUPPLEMENTARY INFORMATION: NextEra Energy Resources (NextEra) applied
to interconnect its proposed 150-megawatt (MW) Hyde County Wind Energy
Center Project, located in Hyde County, South Dakota, with the
Western's existing Fort Thompson Substation in Buffalo County, South
Dakota. NextEra has also applied to interconnect its proposed 150-MW
Crowned Ridge Wind Energy Center Project with Western's existing
Watertown Substation in Codington County, South Dakota. The proposed
Project would be located in Codington and Grant counties, South Dakota.
Western is preparing separate EISs on the proposals to interconnect the
projects in accordance with NEPA (42 U.S.C. 4321-4347); DOE NEPA
Implementing Procedures (10 CFR part 1021); and the CEQ regulations for
implementing NEPA (40 CFR parts 1500-1508).\1\
---------------------------------------------------------------------------
\1\ On October 4, 1999, DOE's Assistant Secretary for
Environmental, Safety and Health delegated to Western's
Administrator the authority to approve EISs for integrating
transmission facilities with Western's transmission grid.
---------------------------------------------------------------------------
Separate Notices of Intent were published in the Federal Register
for both proposed projects on November 30, 2010 (75 FR 74040 for Hyde
County and 75 FR 74042 for Crowned Ridge). Scoping meetings were held
on December 14, 2010, in Highmore, South Dakota, for the Hyde County
Project, and on December 15, 2010, in Watertown, South Dakota, for the
Crowned Ridge Project. The Notices of Intent specified a 45-day public
scoping period, which would end on January 14, 2011. One commenter,
writing on his own behalf and that of other area landowners, has
requested an extension of the public scoping period deadline to January
30, 2011, due to the holidays. Western is granting that request, and by
this notice and local advertising is extending the formal scoping
period to midnight Monday, January 31, 2011.
Dated: January 10, 2011.
Timothy J. Meeks,
Administrator.
[FR Doc. 2011-897 Filed 1-14-11; 8:45 am]