Eagle Crest Energy Company; Notice of Availability of the Draft Environmental Impact Statement for the Eagle Mountain Pumped Storage Hydroelectric Project and Notice of Public Meetings, 1149 [2011-49]
Download as PDF
Federal Register / Vol. 76, No. 5 / Friday, January 7, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13123–002—California]
Eagle Crest Energy Company; Notice
of Availability of the Draft
Environmental Impact Statement for
the Eagle Mountain Pumped Storage
Hydroelectric Project and Notice of
Public Meetings
jdjones on DSK8KYBLC1PROD with NOTICES
December 23, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations contained in the Code of
Federal Regulations (CFR) (18 CFR part
380 [FERC Order No. 486, 52 FR
47897]), the Office of Energy Projects
has reviewed the application for license
for the Eagle Mountain Pumped Storage
Hydroelectric Project (FERC No. 13123),
located on the site of the inactive Eagle
Mountain mine in Riverside County,
California, near the town of Desert
Center and prepared a draft
environmental impact statement (EIS)
for the project. The project would
occupy 1,059.26 acres of federal lands
administered by the U.S. Bureau of
Land Management and 1,162 acres of
private land owned by Kaiser Eagle
Mountain, LLC.
The draft EIS contains staff’s analysis
of the applicant’s proposal and the
alternatives for a licensee for the Eagle
Mountain Project. The draft EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian tribes, the
public, the license applicant, and
Commission staff.
A copy of the draft EIS is available for
review at the Commission or may be
viewed on the Commission’s website at
https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number,
excluding the last three digits, to access
the document. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
All comments must be filed by
Monday, February 28, 2011, and should
reference Project No. 13123–002.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
VerDate Mar<15>2010
15:30 Jan 06, 2011
Jkt 223001
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text-only
comments, click on ‘‘eComment.’’ For
assistance, please contact FERC Online
Support. Although the Commission
strongly encourages electronic filing,
documents may also be paper-filed. To
paper-file, mail an original and eight
copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Anyone may intervene in this
proceeding based on this draft EIS (18
CFR 380.10). You must file your request
to intervene as specified above.1 You do
not need intervenor status to have your
comments considered.
In addition to or in lieu of sending
written comments, you are invited to
attend a public meeting that will be held
to receive comments on the draft EIS.
The time and location of the meeting is
as follows:
Daytime Meeting
Date: February 3, 2011.
Time: 1 p.m.
Place: University of California at
Riverside, Palm Desert Graduate Center.
Address: 75–080 Frank Sinatra Drive,
Room B114/117, Palm Desert, California
92211.
Evening Meeting
Date: February 3, 2011,
Time: 7 p.m.–10 p.m.
Place: University of California at
Riverside, Palm Desert Graduate Center.
Address: 75–080 Frank Sinatra Drive,
Room B200, Palm Desert, California
92211.
At these meetings, resource agency
personnel and other interested persons
will have the opportunity to provide
oral and written comments and
recommendations regarding the draft
EIS. The meetings will be recorded by
a court reporter, and all statements
(verbal and written) will become part of
the Commission’s public record for the
project. This meeting is posted on the
Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
For further information, please
contact Kenneth Hogan at (202) 502–
8434 or at kenneth.hogan@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–49 Filed 1–6–11; 8:45 am]
BILLING CODE 6717–01–P
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
1149
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC11–19–000]
T.W. Phillips Pipeline Corp.; Notice of
Filing
December 30, 2010.
Take notice that on December 17,
2010, T.W. Phillips Pipeline Corp.
submitted a request for a waiver of the
reporting requirement to file the FERC
Form 2–A for 2010 and a waiver of the
reporting requirement to file the FERC
Form 3–Q for the first, second, and third
quarters of 2011.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: January 31, 2011.
Kimberly Bose,
Secretary.
[FR Doc. 2011–39 Filed 1–6–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\07JAN1.SGM
07JAN1
Agencies
[Federal Register Volume 76, Number 5 (Friday, January 7, 2011)]
[Notices]
[Page 1149]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-49]
[[Page 1149]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13123-002--California]
Eagle Crest Energy Company; Notice of Availability of the Draft
Environmental Impact Statement for the Eagle Mountain Pumped Storage
Hydroelectric Project and Notice of Public Meetings
December 23, 2010.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission or FERC)
regulations contained in the Code of Federal Regulations (CFR) (18 CFR
part 380 [FERC Order No. 486, 52 FR 47897]), the Office of Energy
Projects has reviewed the application for license for the Eagle
Mountain Pumped Storage Hydroelectric Project (FERC No. 13123), located
on the site of the inactive Eagle Mountain mine in Riverside County,
California, near the town of Desert Center and prepared a draft
environmental impact statement (EIS) for the project. The project would
occupy 1,059.26 acres of federal lands administered by the U.S. Bureau
of Land Management and 1,162 acres of private land owned by Kaiser
Eagle Mountain, LLC.
The draft EIS contains staff's analysis of the applicant's proposal
and the alternatives for a licensee for the Eagle Mountain Project. The
draft EIS documents the views of governmental agencies, non-
governmental organizations, affected Indian tribes, the public, the
license applicant, and Commission staff.
A copy of the draft EIS is available for review at the Commission
or may be viewed on the Commission's website at https://www.ferc.gov,
using the ``e-Library'' link. Enter the docket number, excluding the
last three digits, to access the document. For assistance, contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-
3676, or for TTY, contact (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
All comments must be filed by Monday, February 28, 2011, and should
reference Project No. 13123-002. Comments may be filed electronically
via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' link. For a simpler method of
submitting text-only comments, click on ``eComment.'' For assistance,
please contact FERC Online Support. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and eight copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
Anyone may intervene in this proceeding based on this draft EIS (18
CFR 380.10). You must file your request to intervene as specified
above.\1\ You do not need intervenor status to have your comments
considered.
---------------------------------------------------------------------------
\1\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
In addition to or in lieu of sending written comments, you are
invited to attend a public meeting that will be held to receive
comments on the draft EIS. The time and location of the meeting is as
follows:
Daytime Meeting
Date: February 3, 2011.
Time: 1 p.m.
Place: University of California at Riverside, Palm Desert Graduate
Center.
Address: 75-080 Frank Sinatra Drive, Room B114/117, Palm Desert,
California 92211.
Evening Meeting
Date: February 3, 2011,
Time: 7 p.m.-10 p.m.
Place: University of California at Riverside, Palm Desert Graduate
Center.
Address: 75-080 Frank Sinatra Drive, Room B200, Palm Desert,
California 92211.
At these meetings, resource agency personnel and other interested
persons will have the opportunity to provide oral and written comments
and recommendations regarding the draft EIS. The meetings will be
recorded by a court reporter, and all statements (verbal and written)
will become part of the Commission's public record for the project.
This meeting is posted on the Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related
information.
For further information, please contact Kenneth Hogan at (202) 502-
8434 or at kenneth.hogan@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-49 Filed 1-6-11; 8:45 am]
BILLING CODE 6717-01-P