Download as PDF Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Dated: December 22, 2010. Joseph A. Main, Assistant Secretary for Mine Safety and Health. [FR Doc. 2010–32744 Filed 12–28–10; 8:45 am] BILLING CODE 4510–43–P DEPARTMENT OF LABOR Office of Workers’ Compensation Programs Division of Federal Employees’ Compensation; Proposed Extension of the Approval of Information Collection Requirements ACTION: Notice. The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and/or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA95) [44 U.S.C. 3506(c)(2)(A)]. This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Office of Workers’ Compensation Programs is soliciting comments concerning the proposed collection: Claim for Continuance of Compensation (CA–12). A copy of the proposed information collection request can be obtained by contacting the office listed below in the ADDRESSES section of this Notice. DATES: Written comments must be submitted to the office listed in the ADDRESSES section below on or before February 28, 2011. ADDRESSES: Mr. Vincent Alvarez, U.S. Department of Labor, 200 Constitution Ave., NW., Room S–3201, Washington, DC 20210, telephone (202) 693–0372, fax (202) 693–1378, e-mail Alvarez.Vincent@dol.gov. Please use only one method of transmission for comments (mail, fax, or e-mail). SUPPLEMENTARY INFORMATION: srobinson on DSKHWCL6B1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 04:00 Dec 29, 2010 Jkt 223001 I. Background: The Office of Workers’ Compensation Programs administers the Federal Employees’ Compensation Act, 5 U.S.C. 8133. Under the Act, eligible dependents of deceased employees receive compensation benefits on account of the employee’s death. OWCP has to monitor death benefits for current marital status, potential for dual benefits, and other criteria for qualifying as a dependent under the law. The CA– 12 is sent annually to beneficiaries in death cases to ensure that their status has not changed and that they remain entitled to benefits. The information collected is used by OWCP claims examiners to ensure that death benefits being paid are correct, and that payments are not made to ineligible survivors. This information collection is currently approved for use through May 31, 2011. II. Review Focus: The Department of Labor is particularly interested in comments which: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility; • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; • Enhance the quality, utility and clarity of the information to be collected; and • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submissions of responses. III. Current Actions: The Department of Labor seeks extension of approval to collect this information collection in order to ensure that death benefits being paid are correct. Type of Review: Extension. Agency: Office of Workers’ Compensation Programs. Title: Claim for Continuance of Compensation. OMB Number: 1240–0015. PO 00000 Frm 00111 Fmt 4703 Sfmt 4703 82075 Agency Number: CA–12. Affected Public: Individuals or households. Total Respondents: 4,570. Total Annual Responses: 4,570. Average Time per Response: 5 minutes. Estimated Total Burden Hours: 379. Frequency: Annually. Total Burden Cost (capital/startup): $0. Total Burden Cost (operating/ maintenance): $2,011. Comments submitted in response to this notice will be summarized and/or included in the request for Office of Management and Budget approval of the information collection request; they will also become a matter of public record. Dated: December 22, 2010. Vincent Alvarez, Agency Clearance Officer, Office of Workers’ Compensation Programs, U.S. Department of Labor. [FR Doc. 2010–32742 Filed 12–28–10; 8:45 am] BILLING CODE 4510–CH–P MILLENNIUM CHALLENGE CORPORATION [MCC FR 10–17] Notice of Quarterly Report (July 1, 2010–September 30, 2010) Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter July 1, 2010 through September 30, 2010, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act. AGENCY: Dated: December 22, 2010. T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. E:\FR\FM\29DEN1.SGM 29DEN1 82076 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Objectives Cumulative disbursements Country: Madagascar Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Madagascar Total Obligation: $87,998,166 Total Quarterly Disbursement: $214,736 Land Tenure Project ......... $30,123,098 Increase Land Titling and Security. $29,304,770 Financial Sector Reform Project. $25,705,099 Increase Competition in the Financial Sector. $23,535,781 Agricultural Business Investment Project. $13,687,987 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. $13,582,533 Program Administration 1 and Control, Monitoring and Evaluation. Pending subsequent reports.2 srobinson on DSKHWCL6B1PROD with NOTICES Measures $18,481,991 .......................................... $17,789,908 ........................ .......................................... Area secured with land certificates or titles in the Zones. Legal and regulatory reforms adopted. Number of land documents inventoried in the Zones and Antananarivo. Number of land documents restored in the Zones and Antananarivo. Number of land documents digitized in the Zones and Antananarivo. Average time for Land Services Offices to issue a duplicate copy of a title. Average cost to a user to obtain a duplicate copy of a title from the Land Services Offices. Number of land certificates delivered in the Zones during the period. Number of new guichets fonciers operating in the Zones. The 256 Plan Local d’Occupation Foncier—Local Plan of Land Occupation (PLOFs) are completed. Volume of funds processed annually by the national payment system. Number of accountants and financial experts registered to become CPA. Number of Central Bank branches capable of accepting auction tenders. Outstanding value of savings accounts from CEM in the Zones. Number of MFIs participating in the Refinancing and Guarantee funds. Maximum check clearing delay. Network equipment and integrator. Real time gross settlement system (RTGS). Telecommunication facilities. Retail payment clearing system. Number of CEM branches built in the Zones. Number of savings accounts from CEM in the Zones. Percent of Micro-Finance Institution (MFI) loans recorded in the Central Bank database. Number of farmers receiving technical assistance. Number of marketing contracts of ABC clients. Number of farmers employing technical assistance. Value of refinancing loans and guarantees issued to participating MFIs (as a measure of value of agricultural and rural loans). ` Number of Mnistere de l’Agriculture, de l’Elevage et ˆ de la Peche-Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in marketing and investment promotion. Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities. $1,368,813 FY2010 Madagascar post-compact disbursement related to final payment of audit expenses. VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00112 Fmt 4703 Sfmt 4703 E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements 82077 Measures Country: Honduras Year: 2010 Quarter 4 Total Obligation: $205,000,000 Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $25,043,989 Rural Development Project $68,273,380 Increase the productivity and business skills of farmers who operate small and medium-size farms and their employees. $61,630,024 Transportation Project ....... $120,591,240 Reduce transportation costs between targeted production centers and national, regional and global markets. $111,068,610 Program Administration1, 3 and Control, Monitoring and Evaluation. Pending subsequent reports.2 $16,135,380 .......................................... $24,767,387 Projects ¥$3 Obligated Objectives Cumulative disbursements Country: Cape Verde Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Cape Verde srobinson on DSKHWCL6B1PROD with NOTICES Watershed and Agricultural Support Project. VerDate Mar<15>2010 04:09 Dec 29, 2010 Number of program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Number of business plans prepared by program farmers with assistance from the implementing entity. Total value of net sales. Total number of recruited farmers receiving technical assistance. Value of loans disbursed to farmers, agribusiness, and other producers and vendors in the horticulture industry, including Program Farmers, cumulative to date, Trust Fund Resources. Number of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI–VOCA). Number of hectares under irrigation. Number of farmers connected to the community irrigation system. Freight shipment cost from Tegucigalpa to Puerto Cortes. Average annual daily traffic volume—CA–5. International roughness index (IRI)—CA–5. Kilometers of road upgraded—CA–5. Percent of contracted road works disbursed—CA–5. Average annual daily traffic volume—secondary roads. International roughness index (IRI)—secondary roads. Kilometers of road upgraded—secondary roads. Average annual daily traffic volume—rural roads. Average speed—Cost per journey (rural roads). Kilometers of road upgraded—rural roads. Percent disbursed for contracted studies Value of signed contracts for feasibility, design, supervision and program mgmt contracts. Kilometers (km) of roads under design. Number of Construction works and supervision contracts signed. Kilometers (km) of roads under works contracts. $12,031,549 Jkt 223001 Increase agricultural production in three targeted watershed areas on three islands. PO 00000 Frm 00113 Fmt 4703 Total Obligation: $110,078,488 Total Quarterly Disbursement: $18,659,128 $10,779,392 Sfmt 4703 Measures Productivity: Horticulture, Paul watershed. Productivity: Horticulture, Faja watershed. Productivity: Horticulture, Mosteiros watershed. Number of farmers adopting drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Area irrigated with drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Irrigation Works: Percent contracted works disbursed. All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Number of reservoirs constructed in all intervention watersheds (Paul, Faja and Mosteiros) (incremental). E:\FR\FM\29DEN1.SGM 29DEN1 82078 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Infrastructure Improvement Project. Objectives Cumulative disbursements $82,630,208 Increase integration of the internal market and reduce transportation costs. $67,214,181 $1,931,223 $1,555,936 $13,485,508 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. .......................................... ........................ .......................................... $480 Obligated Objectives Projects Cumulative disbursements Country: Nicaragua Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Nicaragua Property Regularization Project. srobinson on DSKHWCL6B1PROD with NOTICES Transportation Project ....... VerDate Mar<15>2010 Number of farmers that have completed training in at least 3 of 5 core agricultural disciplines: All intervention watersheds (Paul, Faja and Mosteiros) (incremental). Travel time ratio: Percentage of beneficiary population further than 30 minutes from nearest market. Kilometers of roads rehabilitated. Percent of contracted Santiago Roads works disbursed (cumulative). Percent of contracted Santo Antao Bridge works disbursed (cumulative). Port of Praia: Percent of contracted port works disbursed (cumulative). Cargo village: Percent of contracted works disbursed (cumulative). Quay 2 improvements: Percent of contracted works disbursed (cumulative). Access road: Percent of contracted works disbursed (cumulative). MFI portfolio at risk, adjusted (level). $23,248,592 Private Sector Development Project. Program Administration 1, 3 and Control, Monitoring and Evaluation. Pending subsequent reports.2 Measures 04:09 Dec 29, 2010 Total Obligation: $113,500,000 Total Quarterly Disbursement: $7,519,183 $7,180,454 Increase investment by strengthening property rights. $5,386,594 $57,999,999 Reduce transportation costs between Leon and Chinandega and national, regional and global markets. $56,893,204 Jkt 223001 PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 Measures Automated database of registry and cadastre installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. Number of additional parcels with a registered title, urban. Number of additional parcels with a registered title, rural. Area covered by cadastral mapping. Cost to conduct a land transaction. Annual average daily traffic volume: N1 Section R1. Annual average daily traffic volume: N1 Section R2. Annual average daily traffic volume: Port Sandino (S13). Annual average daily traffic volume: Villanueva— Guasaule Annual. Average daily traffic volume: Somotillo-Cinco Pinos (S1). ´ Annual average daily traffic volume: Leon-Poneloya˜ Las Penitas. International Roughness Index: N–I Section R1. International Roughness Index: N–I Section R2. International Roughness Index: Port Sandino (S13). International Roughness Index: Villanueva— Guasaule. International Roughness Index: Somotillo-Cinco Pinos. ´ International Roughness Index: Leon-Poneloya-Las ˜ Penitas. Kilometers of NI upgraded: R1 and R2 and S13. Kilometers of NI upgraded: Villanueva—Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objectives Cumulative disbursements Rural Development Project $32,875,845 Increase the value added of farms and enterprises in the region. $27,429,435 Program Administration, 1 Due Diligence, Monitoring and Evaluation. Pending subsequent reports.2 $15,443,702 .......................................... .......................................... $1,487,373 Obligated Objective Projects Number of beneficiaries with business plans. Numbers of manzanas (1 Manzana = 1.7 hectares), by sector, harvesting higher-value crops. Number of beneficiaries with business plans prepared with assistance of Rural Business Development Project. Number of beneficiaries implementing Forestry business plans under Improvement of Water Supplies Activity. Number of Manzanas reforested. Number of Manzanas with trees planted. Cumulative disbursements Country: Georgia Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Georgia Measures Total Obligation: $395,300,000 Total Quarterly Disbursement: $92,476,526 Regional Infrastructure Rehabilitation Project. $315,750,000 Key Regional Infrastructure Rehabilitated. $202,815,531 Regional Enterprise Development Project. srobinson on DSKHWCL6B1PROD with NOTICES Measures $14,670,657 ........................ 82079 $52,530,800 Enterprises in Regions Developed. $41,856,073 Program Administration 1, 3, Due Diligence, Monitoring and Evaluation. Pending subsequent reports.2 $32,350,000 .......................................... $18,641,284 ........................ .......................................... $2 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 Household savings from Infrastructure Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Annual average daily traffic (AADT). Travel Time. Road paved/completed. Construction Works completed (Contract 1). Construction Works completed (Contract 2). Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of roads under works contracts. Site rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. Savings in household expenditures for all RID subprojects. Population Served by all RID subprojects. RID Subprojects completed. Value of RID Grant Agreements signed. Value of project works and goods contracts Signed. RID subprojects with works initiated. Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Beneficiaries (direct and indirect)—ADA. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies (PC). Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies (PC). Funds disbursed to the portfolio companies. E:\FR\FM\29DEN1.SGM 29DEN1 82080 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements Measures November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30, 2009. Projects Obligated Objective Cumulative disbursements Country: Vanuatu Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Vanuatu Total Obligation: $65,690,000 Total Quarterly Disbursement: $7,256,856 Transportation Infrastructure Project. $60,162,579 Facilitate transportation to increase tourism and business development. $59,105,315 Program Administration,1 Due Diligence, Monitoring and Evaluation. Pending subsequent reports.2 $5,527,421 .......................................... $3,703,400 ........................ .......................................... $19,947 Obligated Objective Projects Traffic volume (average annual daily traffic)—Efate: Ring Road. Traffic Volume (average annual daily traffic)—Santo: East Coast Road. Kilometers of road upgraded—Efate: Ring Road. Kilometers of roads upgraded—Santo: East Coast Road. Percent of contracted roads works disbursed (USD disbursed): Total (Cumulative). Cumulative disbursements Country: Armenia Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Armenia Measures Total Obligation: $235,650,000 Total Quarterly Disbursement: $19,213,705 Irrigated Agriculture Project (Agriculture and Water). $152,709,208 Increase agricultural productivity, Improve and Quality of Irrigation. $66,605,940 Rural Road Rehabilitation Project. $67,100,000 Better access to economic and social infrastructure. $7,870,945 Program Administration 1, 3, Due Diligence, Monitoring and Evaluation. Pending subsequent reports.2 $15,840,792 .......................................... $19,937,668 ........................ .......................................... $925,337 Obligated Objective Projects Access to Financial Services Project. VerDate Mar<15>2010 04:09 Dec 29, 2010 $19,650,000 Jkt 223001 Expand Access to Financial Services. PO 00000 Frm 00116 Fmt 4703 Training/technical assistance provided for On-Farm Water Management. Training/technical assistance provided for Post-Harvest Processing. Loans Provided. Percent of contracted works disbursed. Value of signed contracts for irrigation works. Number of farmers using better on-farm water management. Number of enterprises using improved techniques. Value of irrigation feasibility and/or detailed design contracts signed. Additional Land irrigated under project. Percent of contracted irrigation feasibility and/or design studies disbursed. Average annual daily traffic on Pilot Roads. International roughness index for Pilot Roads. Road Sections Rehabilitated—Pilot Roads. Pilot Roads: Percent of Works Completed. Cumulative disbursements Country: Benin Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Benin srobinson on DSKHWCL6B1PROD with NOTICES Measures Measures Total Obligation: $307,298,040 Total Quarterly Disbursement: $23,613,176 $4,804,163 Sfmt 4703 Volume of credits granted by the Micro-Finance Institutions (MFI). Volume of saving collected by the Micro-Finance Institutions. Average portfolio at risk >90 days of microfinance institutions at the national level. Operational self-sufficiency of MFIs at the national level. Number of institutions receiving grants through the Facility. Number of MFIs inspected by CSSFD. E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements Access to Justice Project .. $34,270,000 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims. $4,387,059 Access to Land Project ..... $35,645,826 Strengthen property rights and increase investment in rural and urban land. $15,927,586 Access to Markets Project $171,059,549 Improve Access to Markets through Improvements to the Port of Cotonou. $57,220,564 82081 Measures Average time to enforce a contract. Percent of firms reporting confidence in the judicial system. Passage of new legal codes. Average time required for Tribunaux de premiere instance—arbitration centers and courts of first instance (TPI) to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Number of Courthouses completed. Average time required to register a business ´ ´ (societe). Average time required to register a business (sole proprietorship). Total value of investment in targeted urban land parcels. Total value of investment in targeted rural land parcels. Average cost required to convert occupancy permit to land title through systematic process. Share of respondents perceiving land security in the PH–TF or PFR areas. Number of preparatory studies completed. Number of Legal and Regulatory Reforms Adopted. Amount of Equipment Purchased. Number of new land titles obtained by transformation of occupancy permit. Number of land certificates issued within MCABenin implementation. Number of PFRs established with MCA Benin implementation. Number of permanent stations installed. Number of stakeholders Trained. Number of communes with new cadastres. Number of operational land market information systems. Volume of merchandise traffic through the Port Autonome de Cotonou. Bulk ship carriers waiting times at the port. Port design-build contract awarded. Port crime levels (number of thefts). Average time to clear customs. Port meets—international port security standards (ISPS). srobinson on DSKHWCL6B1PROD with NOTICES Program Administration,1 Due Diligence, Monitoring and Evaluation. Pending subsequent reports. 2 VerDate Mar<15>2010 $46,672,665 .......................................... $37,359,740 ........................ .......................................... $283,062 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00117 Fmt 4703 Sfmt 4703 E:\FR\FM\29DEN1.SGM 29DEN1 82082 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements Country: Ghana Year: 2010 Quarter 3 Entity to which the assistance is provided: MCA Ghana Total Obligation: $547,009,000 Total Quarterly Disbursement: $47,465,045 $214,514,087 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. $95,228,311 Rural Development Project $73,436,385 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. $28,739,320 Transportation Project ....... srobinson on DSKHWCL6B1PROD with NOTICES Agriculture Project ............. $214,054,795 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. $63,198,451 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00118 Fmt 4703 Measures Sfmt 4703 Number of farmers trained in Commercial Agriculture. Number of agribusinesses assisted. Number of preparatory land studies completed. Legal and Regulatory land reforms adopted. Number of landholders reached by public outreach efforts. Number of hectares under production. Number of personnel trained. Number of buildings rehabilitated/constructed. Value of equipment purchased. Feeder Roads International Roughness Index. Feeder Roads Annualized Average Daily Traffic. Value of signed contracts for feasibility and/or design studies of Feeder Roads. Percent of contracted design/feasibility studies completed for Feeder Roads. Value of signed works contracts for Feeder Roads. Percent of contracted Feeder Road works disbursed. Value of loans disbursed to clients from agriculture loan fund. Value of signed contracts for feasibility and/or design studies (irrigation). Percent of contracted (design/feasibility) studies complete (irrigation). Value of signed contracts for irrigation works (irrigation) Rural hectares mapped. Percent of contracted irrigation works disbursed. Percent of people aware of their land rights in Pilot Land Registration Areas. Total number of parcels surveyed in the Pilot Land Registration Areas (PLRAs). Volume of products passing through post-harvest treatment. Number of students enrolled in schools affected by Education Facilities Sub-Activity. Number of schools rehabilitated. Number of basic school blocks constructed to Ministry of Education (MOE) construction standards. Distance to collect water. Time to collect water. Incidence of guinea worm. Average number of days lost due to guinea worm. Number of people affected by Water and Sanitation Facilities Sub-Activity. Number of stand-alone boreholes/wells/nonconventional water systems constructed/rehabilitated. Number of small-town water systems designed and due diligence completed for construction. Number of pipe extension projects designed and due diligence completed for construction. Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. Trunk Roads International roughness index. N1 International Roughness Index. N1 Annualized Average Daily Traffic. N1 Kilometers of road upgraded. Value of signed contracts for feasibility and/or design studies of the N1. Percent of contracted design/feasibility studies completed of the N1. Value of signed contracts for road works N1, Lot 1. Value of signed contracts for road works N1, Lot 2. Trunk Roads Annualized Average Daily Traffic. Trunk Roads Kilometers of roads completed. E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements 82083 Measures Percent of contracted design/feasibility studies completed of Trunk Roads. Percent of contracted Trunk Road works disbursed. Ferry Activity: Annualized average daily traffic vehicles. Ferry Activity: Annual average daily traffic (passengers). Landing stages rehabilitated. Ferry terminal upgraded. Rehabilitation of Akosombo Floating Dock completed. Rehabilitation of landing stages completed. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted work disbursed: Ferry and floating dock. Percent of contracted work disbursed: Landings and terminals. Value of signed contracts for feasibility and/or design studies of Trunk Roads. Value of signed contracts for Trunk Roads. Program Administration,1 3 Due Diligence, Monitoring and Evaluation.. Pending subsequent reports. 2 $45,003,733 .......................................... $47,463,272 ........................ .......................................... $28,614 Obligated Objective Projects Cumulative disbursements Country: El Salvador Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA El Salvador Human Development Project. $101,753,001 srobinson on DSKHWCL6B1PROD with NOTICES Productive Development Project. Connectivity Project .......... $71,824,000 $246,122,000 Productive Development Project. VerDate Mar<15>2010 04:09 Dec 29, 2010 $71,824,000 Jkt 223001 Total Obligation: $460,940,000 Total Quarterly Disbursement: $42,934,886 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. $29,384,863 Increase production and employment in the Northern Zone. $26,483,228 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. .......................................... $81,051,126 PO 00000 Frm 00119 Fmt 4703 Measures Employment rate of graduates of middle technical schools. Graduation rates of middle technical schools. Middle technical schools remodeled and equipped. Scholarships granted to students of middle technical schools. Students of non-formal training. Cost of water. Time collecting water. Households benefiting with water solutions built. Potable water and basic sanitation systems with construction contracts signed. Cost of electricity. Households benefiting with a connection to the electricity network. Household benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Number of hectares under production with MCC support. Number of beneficiaries of technical assistance and training—Agriculture. Number of beneficiaries of technical assistance and training—Agribusiness. Value of Agricultural Loans to Farmers/Agribusiness. Average annual daily traffic. International roughness index. Kilometers of roads rehabilitated. Kilometers of roads with Construction Initiated. $34,480,068 Sfmt 4703 E:\FR\FM\29DEN1.SGM 29DEN1 82084 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report. 2 Objective Cumulative disbursements $41,240,999 .......................................... $20,477,971 ........................ .......................................... $0 Obligated Objective Projects Cumulative disbursements Country: Mali Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Mali Measures Total Obligation: $460,811,164 Total Quarterly Disbursement: $41,672,745 Bamako Senou Airport Improvement Project. $181,254,264 .......................................... $25,720,644 Alatona Irrigation Project .. srobinson on DSKHWCL6B1PROD with NOTICES Measures $234,884,675 Increase the agricultural production and productivity in the Alatona zone of the ON. $86,376,257 Industrial Park Project ....... $2,643,432 Terminated ....................... $2,637,472 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00120 Fmt 4703 Sfmt 4703 Employment at airport. Signature of design contract. Average number of weekly flights (arrivals) Passenger traffic (annual average). Percent works complete. Time required for passenger processing at departures and arrivals. Percent works complete. Percent of airport management and maintenance plan implemented. Airport meets Federal Aviation Administration (FAA) and International Civil Aviation Organization (ICAO) security standards. Technical assistance delivered to project. Main season rice yields. International roughness index (IRI) on the NionoGoma Coura Route. Average daily vehicle count. Percentage works completed on Niono-Goma Coura road. Number of hectares of land irrigated in the Alatona Canal. Irrigation system efficiency on Alatona Canal during the rainy season and the dry season. Completion rate of work on the construction of the main system (B03). Percentage of contracted irrigation construction works disbursed. Number of titles registered in the land registration office of the Alatona zone. Number of market gardens allocated in Alatona zones (for PAPs) (market garden parcels allotted to PAP women). Decree transferring legal control of the project impact area is passed. Contractor implementing the ‘‘Mapping of Agricultural and Communal Land Parcels’’ contract is mobilized. Net school enrollment rate (in Alatona zone). Percent of Alatona population with access to drinking water. Number of schools available in Alatona. Number of health centers available in Alatona. Number of affected people who have been compensate. Resettlement Census verified. Adoption of Rate of Extension Techniques. Area planted with rice during the rainy season. Area planted with shallots during dry season. Number of farmers trained. Water management system design and capacity building strategy implemented. Amount of credit extended to Alatona farmers. Number of farmers accessing grant assistance for first loan from financial institutions. Financial institution partners identified (report on assessment of the financial institution in the Office du Niger—Office of Niger zone (ON zonel). Loan Portfolio quality of Alatona MFIs: portfolio at risk. E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Program Administration1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 Objective Cumulative disbursements $42,028,793 .......................................... .......................................... $18,398 Obligated Objective Measures $20,385,241 ........................ 82085 Projects Cumulative disbursements Country: Mongolia Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Mongolia Property Rights Project ..... $27,201,061 Increase security and capitalization of land assets held by lower-income Mongolians, and increased peri-urban herder productivity and incomes. Measures Total Obligation: $284,911,362 Total Quarterly Disbursement: $14,768,683 $2,825,022 Vocational Education Project. $47,355,638 Increase employment and income among unemployed and underemployed Mongolians. $2,976,911 Health Project ................... $38,974,817 $5,575,398 Roads Project ................... Energy and Environmental Project. Rail Project ........................ Program Administration 1 and Control, Monitoring and Evaluation. Pending subsequent reports.2 $79,750,000 $46,966,205 Increase the adoption of behaviors that reduce non-communicable diseases (NCDIs) among target populations and improved medical treatment and control of NCDIs. TBD .................................. TBD .................................. $369,560 $44,294,082 Terminated ....................... .......................................... $369,560 $13,273,879 ........................ .......................................... Number of studies completed. Legal and regulatory reforms adopted. Number of landholders reached by public outreach efforts. Training to Leaseholders—Intensive and Semi-Intensive Farming. Number of Buildings rehabilitated/constructed. Value of equipment purchased. Rural hectares Mapped. Urban Parcels Mapped. Leaseholds Awarded. Hashaa Plots Directly Registered by the Property Rights Project. Rate of employment of TVET Graduates. Students completing newly designed long-term programs. Percent of active teachers receiving certification training. Technical and vocational education and training (TVET) legislation passed. Diabetes and hypertension controlled. Percentage of cancer cases diagnosed in early stages. Road and traffic safety activity finalized and key interventions developed. $134,701 $4,570,157 $271,173 TBD. TBD. Terminated. In late 2009, the MCC’s Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road project. Projects Obligated Objective Cumulative disbursements Country: Mozambique Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Mozambique srobinson on DSKHWCL6B1PROD with NOTICES Water Supply and Sanitation Project. VerDate Mar<15>2010 $203,585,393 04:09 Dec 29, 2010 Jkt 223001 Increase access to reliable and quality water and sanitation facilities. PO 00000 Frm 00121 Fmt 4703 Total Obligation: $506,924,053 Total Quarterly Disbursement: $7,529,614 $5,635,522 Sfmt 4703 Measures Time to get to non-private water source. Percent of urban population with improved water sources. Percent of urban population with improved sanitation facilities. Percent of rural population with access to improved water sources. Number of private household water connections in urban areas. Number of Rural water points constructed. Number of standpipes in urban areas. Final detailed design for 5 towns submitted. Final detailed design for 3 cities submitted. E:\FR\FM\29DEN1.SGM 29DEN1 82086 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Road Rehabilitation Project $176,307,480 Increase access to productive resources and markets. $3,144,038 Land Tenure Project ......... $39,068,307 Establish efficient, secure land access for households and investors. $5,977,098 Farmer Income Support Project. srobinson on DSKHWCL6B1PROD with NOTICES Obligated $18,400,117 Improve coconut productivity and diversification into cash crop. $4,219,775 Program Administration1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 $69,562,756 .......................................... $15,929,371 ........................ .......................................... $224,469 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 Objective Cumulative disbursements Projects PO 00000 Frm 00122 Fmt 4703 Sfmt 4703 Measures Kilometers of road rehabilitated. ´ Percent of Namialo—Rio Lurio Road—Metoro feasibility, design, and supervision contract disbursed. Percent of Rio Ligonha-Nampula feasibility, design, and supervision contract disbursed. Percent of Chimuara-Nicoadala feasibility, design, and supervision contract disbursed. ´ Percent of Namialo—Rio Lurio Road construction contract disbursed. ´ Percent of Rio Lurio—Metoro Road construction contract disbursed. Percent of Rio Ligonha—Nampula Road construction contract disbursed. Percent of Chimuara-Nicoadala Road construction contract disbursed. Average annual daily traffic volume. Average annual daily traffic volume. Average annual daily traffic volume. Average annual daily traffic volume. Change in International Roughness Index (IRI)— Namialo—Rio Lurio Road. Change in International Roughness Index (IRI)—on Rio Ligonha-Nampula Road. Change in International Roughness Index (IRI)—on Rio Lurio-Metoro Road. Change in International Roughness Index (IRI)—on Chimuara-Nicoadala Road. Total number of officials and residents reached with land strategy and policy awareness and outreach messages. Time to get land usage rights (DUAT), urban. Time to get land usage rights (DUAT), rural. Number of buildings rehabilitated or built. Total value of procured equipment and materials. Number of people trained. Rural hectares mapped in Site Specific Activity. Rural hectares mapped in Community Land Fund Initiative. Urban parcels mapped. Rural hectares formalized through Site Specific Activity. Rural hectares formalized through Community Land Fund Initiative. Urban parcels formalized. Number of communities delimited. Number of households having land formalized, rural. Number of households having land formalized, urban. Number of diseased or dead palm trees cleared. Number of coconut seedlings planted. Hectares under production. Number of farmers trained in pest and disease control. Number of farmers trained in crop diversification technologies. Income from coconuts and coconut products (estates). Income from coconuts and coconuts products (households). E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Cumulative disbursements Country: Lesotho Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Lesotho Measures Total Obligation: $362,551,000 Total Quarterly Disbursement: $8,824,926 Water Project .................... $164,027,999 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. $11,510,014 Health Project ................... $122,398,000 Increase access to life-extending ART and essential health services by providing a sustainable delivery platform. $8,975,636 $5,068,026 Private Sector Development Project. $36,470,318 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 $39,654,682 .......................................... ........................ .......................................... $830,982 Obligated Objective School days lost due to water borne diseases. Diarrhea notification at health centers. Time saved due to access to water source. Rural household (HH) provided with access to improved water supply. Rural HH provided with access to improved ventilated latrines. Rural population with knowledge of good hygiene principles. Urban HH with access to potable water supply. Number of enterprises connected to water network. Households connected to improved water network. Cubic meters of treated water from metolong dam delivered through a conveyance system to Water and Sewerage Authority (WASA). Hydrological flows variability. Reclaimed area. People with HIV still alive 12 months after initiation of treatment. TB notification (per 100,000 pop.). Percentage of PLWA receiving ARV treatment (by age & sex). Deliveries conducted in the health centers. Immunization coverage rate. Average time (days) required to enforce a contract. Value of commercial cases. Cases referred to ADR that are successfully completed. Portfolio of loans. Loan processing time. Performing loans. Electronic payments—salaries. Electronic payments—pensions. Debit/smart cards issued. Mortgage bonds registered. Value of registered mortgage bonds. Clearing time—Maseru. Time to complete transfer of land rights. Land transactions recorded. Land parcels regularized and registered. People trained on gender equality and economic rights. ID cards issued. Monetary cost of a lease transaction. $17,965,233 Projects Cumulative disbursements Country: Morocco Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Morocco Fruit Tree Productivity Project. srobinson on DSKHWCL6B1PROD with NOTICES 82087 $300,896,445 Small Scale Fisheries Project. $116,168,027 Artisan and Fez Medina Project. $111,873,858 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 Reduce volatility of agricultural production and increase volume of fruit agricultural production. Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources. Increase value added to tourism and artisan sectors. PO 00000 Frm 00123 Fmt 4703 Measures Total Obligation: $697,500,000 Total Quarterly Disbursement: $33,030,895 $28,776,035 $3,750,631 $679,067 Sfmt 4703 Number of farmers trained. Number of agribusinesses assisted. Number of hectares under production. Value of agricultural production. Landing sites and ports rehabilitated. Mobile fish vendors using new equipments. Fishing boats using new landing sites. Average price of fish at auction markets. Average price of fish at wholesale. Average price of fish at ports. Average revenue of SME pottery workshops. Construction and rehabilitation of Fez Medina Sites. Tourist receipts in Fez. Training of potters. E:\FR\FM\29DEN1.SGM 29DEN1 82088 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Objective Enterprise Support Project $33,850,000 Financial Services Project Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 Cumulative disbursements $46,200,000 $88,511,670 Improved survival rate of new SMEs and INDHfunded income generating activities; increased revenue for new SMEs and INDHfunded income generating activities. TBD .................................. .......................................... $19,193,986 $35,553,639 ........................ .......................................... $6,448,551 Obligated Objectives Projects $4,434,211 Increase value added to businesses. $15,590,343 Transport Sector Project ... srobinson on DSKHWCL6B1PROD with NOTICES $206,042,428 $368,847,428 Increase cash crop revenue and aggregate visitor spending. $35,775,976 Jkt 223001 PO 00000 Frm 00124 Fmt 4703 TBD. Measures Total obligation: $698,136,000 Total Quarterly Disbursement: $33,634,843 Energy Sector Project ....... 04:09 Dec 29, 2010 Number of enterprises in pilot project receiving coaching. Value added per enterprise. Survival rate after two years. Cumulative disbursements Country: Tanzania Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Tanzania VerDate Mar<15>2010 Measures Sfmt 4703 New power customers: Kigoma. New power customers: Morogoro. New power customers: Tanga. New power customers: Mbeya. New power customers: Iringa. New power customers: Dodoma. New power customers: Mwanza. New power customers: Zanzibar. Energy generation: Kigoma. Transmission capacity: Kigoma. Transmission capacity: Morogoro. Transmission capacity: Tanga. Transmission capacity: Mbeya. Transmission capacity: Iringa. Transmission capacity: Dodoma. Transmission capacity: Mwanza. Transmission capacity: Zanzibar. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted: Distribution Rehabilitation and extension activity. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted; Zanzibar Interconnector activity. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted; Malagarasi hydropower and Kigoma distribution activity. International roughness index: Tunduma Sumbawanga. International roughness index: Tanga Horohoro. International roughness index: Namtumbo Songea. International roughness index: Peramiho Mbinga. Annual average daily traffic: Tunduma Sumbawanga. Annual average daily traffic: Tanga Horohoro. Annual average daily traffic: Namtumbo Songea. Annual average daily traffic: Peramiho Mbinga. Kilometers upgraded/completed: Tunduma Sumbawanga. Kilometers upgraded/completed: Tanga Horohoro. Kilometers upgraded/completed: Namtumbo Songea. Kilometers upgraded/completed: Peramiho Mbinga. Percent disbursed on construction works: Tunduma Sumbawanga Percent disbursed on construction works: Tanga Horohoro. Percent disbursed on construction works: Namtumbo Songea. Percent disbursed on construction works: Peramiho Mbinga. E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Cumulative disbursements Objectives Water Sector Project ......... $65,692,143 Increase investment in human and physical capital and to reduce the prevalence of water-related disease. Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 $57,554,001 .......................................... ........................ .......................................... Objective Percent disbursed for feasibility and/or design studies: Tunduma Sumbawanga. Percent disbursed for feasibility and/or design studies: Tanga Horohoro. Percent disbursed for feasibility and/or design studies: Namtumbo Songea. Percent disbursed for feasibility and/or design studies: Peramiho Mbinga. International roughness index: Pemba. Average annual daily traffic: Pemba. Kilometers upgraded/completed: Pemba. Percent disbursed on construction works: Pemba. Signed contracts for construction works (Zanzibar Rural Roads). Percent disbursed on signed contracts for feasibility and/or design studies: Pemba. Passenger arrivals: Mafia Island. Percentage of upgrade complete: Mafia Island. Percent disbursed on construction works: Mafia Island. Number of households using improved source for drinking water (Dar es Salaam). Number of households using improved source for drinking water (Morogoro). Number of businesses using improved water source (Dar es Salaam). Number of businesses using improved water source (Morogoro). Volume of water produced (Lower Ruvu). Volume of water produced (Morogoro). Percent disbursed on Feasibility Design Update contract Lower Ruvu Plant Expansion. $206,195 Obligated Measures $22,498,946 Projects Country: Burkina Faso Year: 2010 $3,003,213 Cumulative disbursements Quarter 4 Measures Total Obligation: $478,943,569 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursement: $10,124,580 Roads Project ................... $194,130,681 Bright II Schools Project ... $26,829,669 Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 $56,138,545 Enhance access to markets through investments in the road network. Increase investment in land and rural productivity through improved land tenure security and land management. Expand the productive use of land in order to increase the volume and value of agricultural production in project zones. Increase primary school completion rates. .......................................... ........................ .......................................... $59,934,615 Agriculture Development Project. srobinson on DSKHWCL6B1PROD with NOTICES Rural Land Governance Project. $141,910,059 VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00125 Fmt 4703 $1,724,994 To Be Determined (TBD). $4,249,902 TBD. $4,164,147 TBD. $26,95,776 TBD. $16,887,315 ¥$65,145 Sfmt 4703 82089 E:\FR\FM\29DEN1.SGM 29DEN1 82090 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Projects Obligated Cumulative disbursements Objective Country: Namibia Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Namibia Education Project .............. $144,976,559 Tourism Project ................. $66,959,292 Agriculture Project ............. $47,550,008 Program Administration 1 and Control, Monitoring and Evaluation. Pending Subsequent Report.2 Measures Total Obligation: $304,477,819 Total Quarterly Disbursement: $6,739,123 $7,526,081 TBD. $3,521,203 TBD. $2,784,242 TBD. $44,991,960 Improve the education sector’s effectiveness, efficiency and quality. Increase incomes and create employment opportunities by improving the marketing, management and infrastructure of Etosha National Park. Sustainably improve the economic performance and profitability of the livestock sector and increase the volume of the indigenous natural products for export. .......................................... ........................ .......................................... $2,023,825 Obligated Objective Projects $7,155,706 Cumulative disbursements Country: Moldova Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Moldova Measures Total Obligation: $262,000,000 Total Quarterly Disbursement: $150,215 Road Rehabilitation Project Transition to High Value Agriculture Project. Program Administration 1 and Monitoring and Evaluation.2 $132,840,000 $101,773,401 .......................................... .......................................... $0 $0 $27,386,599 .......................................... $150,215 Projects Obligated To Be Determined (TBD). TBD. TBD. Cumulative disbursements Objective Country: Senegal Year: 2010 Quarter 4 Entity to which the assistance is provided: MCA Moldova Measures Total Obligation: $540,000,000 Total Quarterly Disbursement: $853.650 Road Rehabilitation Project $324,062,499 .......................................... $0 To Be Determined (TBD). Transition to High Value $170,008,860 .......................................... $0 TBD. Agriculture Project. Program Administration 1 $45,928,641 .......................................... $829,986 TBD. and Monitoring and Evaluation. Pending Subsequent Re........................ .......................................... $123,829 port. 2 1 Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. 2 These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s) 3 FY2010 overstatement of program admin disbursements for selected countries is related to expense accruals. The accruals will be reversed in 2011 and applied to various projects and activities. 619(b) Transfer or Allocation of Funds Amount Description of program or project USAID srobinson on DSKHWCL6B1PROD with NOTICES U.S. Agency to which Funds were Transferred or Allocated $28,827,779 Threshold Program. VerDate Mar<15>2010 04:09 Dec 29, 2010 Jkt 223001 PO 00000 Frm 00126 Fmt 4703 Sfmt 4703 E:\FR\FM\29DEN1.SGM 29DEN1 Federal Register / Vol. 75, No. 249 / Wednesday, December 29, 2010 / Notices Dated: December 22, 2010. lllllllllllllllllllll T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. [FR Doc. 2010–32725 Filed 12–28–10; 8:45 am] BILLING CODE 9211–03–P NUCLEAR REGULATORY COMMISSION [NRC–2010–0318] Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request U.S. Nuclear Regulatory Commission (NRC). ACTION: Notice of the OMB review of information collection and solicitation of public comment. AGENCY: The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on October 13, 2010. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR Part 26, ‘‘Fitness for Duty Programs.’’ 3. Current OMB approval number: 3150–0146. 4. The form number if applicable: N/A. 5. How often the collection is required: Annually and on occasion. 6. Who will be required or asked to report: Nuclear power reactor licensees licensed under 10 CFR part 50 or 52 (except those who have permanently ceased operations and have verified that fuel has been permanently removed from the reactor); all holders of nuclear power plant construction permits and early site permits with a limited work authorization and applicants for nuclear power plant construction permits that have a limited work authorization under the provisions of 10 CFR part 50; all holders of a combined license for a nuclear power plant issued under 10 CFR part 52 and applicants for a combined license that have a limited work authorization; all licensees, who are authorized to possess, use, or srobinson on DSKHWCL6B1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 04:04 Dec 29, 2010 Jkt 223001 transport formula quantities of strategic special nuclear material (SSNM) under the provisions of 10 CFR part 70; all holders of a certificate of compliance of an approved compliance plan issued under 10 CFR part 76, if the holder engages in activities involving formula quantities of SSNM; and all contractor/ vendors (C/V) who implement fitnessfor-duty (FFD) programs or program elements to the extent that the licensees and other entities listed in this paragraph rely on those C/V FFD programs or program elements to comply with 10 CFR part 26. 7. An estimate of the number of annual responses: 521,919 (120 total annual reporting responses + 42 recordkeepers + 521,757 third-party responses). 8. The estimated number of annual respondents: 89,510 (31 FFD program responses + 1 Subpart K construction FFD program respondent + 10 HHScertified laboratories + 89,468 thirdparty respondents). 9. An estimate of the total number of hours needed annually to complete the requirement or request: 666,824 (6,615 reporting + 358,352 recordkeeping + 301,857 third party disclosure). 10. Abstract: NRC regulations in 10 CFR part 26 prescribe requirements to establish, implement, and maintain fitness-for-duty programs at affected licensees and other entities. The objectives of these requirements are to provide reasonable assurance that persons subject to the rule are trustworthy, reliable, and not under the influence of any substance, legal or illegal, or mentally or physically impaired from any cause, which in any way could adversely affect their ability to safely and competently perform their duties. These requirements also provide reasonable assurance that the effects of fatigue and degraded alertness on individuals’ abilities to safely and competently perform their duties are managed commensurate with maintaining public health and safety. The information collections required by part 26 are necessary to properly manage FFD programs and to enable effective and efficient regulatory oversight of affected licensees other entities. These licensees and other entities must perform certain tasks, maintain records, and submit reports to comply with part 26 drug and alcohol provisions and fatigue management requirements. These records and reports are necessary to enable regulatory inspection and evaluation of a licensee’s or entity’s compliance with NRC regulations, its FFD performance, and of any significant FFD-related event to help maintain public health and safety, PO 00000 Frm 00127 Fmt 4703 Sfmt 4703 82091 promote the common defense and security, and protect the environment. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O–1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC World Wide Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by January 28, 2011. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Christine J. Kymn, Desk Officer, Office of Information and Regulatory Affairs (3150–0146), NEOB–10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to Christine.J.Kymn@omb.eop.gov or submitted by telephone at (202) 395– 4638. The NRC Clearance Officer is Tremaine Donnell, (301) 415–6258. Dated at Rockville, Maryland, December 21, 2010. For the Nuclear Regulatory Commission. Fajr Majeed, Acting NRC Clearance Officer, Office of Information Services. [FR Doc. 2010–32825 Filed 12–28–10; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–331; NRC–2008–0618] NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Notice of Issuance of Renewed Facility, Operating License No. DPR–49 for an Additional 20-Year Period Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued renewed facility operating license No. DPR–49 to NextEra Energy Duane Arnold, LLC (licensee), the operator of the Duane Arnold Energy Center (DAEC). Renewed facility operating license No. DPR–49 authorizes operation of DAEC by the licensee at reactor core power levels not in excess of 1912 megawatts thermal in accordance with the provisions of the DAEC renewed license and its technical specifications. The notice also serves as the record of decision for the renewal of facility E:\FR\FM\29DEN1.SGM 29DEN1

Agencies

[Federal Register Volume 75, Number 249 (Wednesday, December 29, 2010)]
[Notices]
[Pages 82075-82091]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-32725]


=======================================================================
-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 10-17]


Notice of Quarterly Report (July 1, 2010-September 30, 2010)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter July 1, 2010 through September 30, 2010, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: December 22, 2010.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

[[Page 82076]]



                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2010 Quarter 4 Total Obligation: $87,998,166
        Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $214,736
----------------------------------------------------------------------------------------------------------------
Land Tenure Project..............     $30,123,098  Increase Land           $29,304,770  Area secured with land
                                                    Titling and                          certificates or titles
                                                    Security.                            in the Zones.
                                                                                        Legal and regulatory
                                                                                         reforms adopted.
                                                                                        Number of land documents
                                                                                         inventoried in the
                                                                                         Zones and Antananarivo.
                                                                                        Number of land documents
                                                                                         restored in the Zones
                                                                                         and Antananarivo.
                                                                                        Number of land documents
                                                                                         digitized in the Zones
                                                                                         and Antananarivo.
                                                                                        Average time for Land
                                                                                         Services Offices to
                                                                                         issue a duplicate copy
                                                                                         of a title.
                                                                                        Average cost to a user
                                                                                         to obtain a duplicate
                                                                                         copy of a title from
                                                                                         the Land Services
                                                                                         Offices.
                                                                                        Number of land
                                                                                         certificates delivered
                                                                                         in the Zones during the
                                                                                         period.
                                                                                        Number of new guichets
                                                                                         fonciers operating in
                                                                                         the Zones.
                                                                                        The 256 Plan Local
                                                                                         d'Occupation Foncier--
                                                                                         Local Plan of Land
                                                                                         Occupation (PLOFs) are
                                                                                         completed.
Financial Sector Reform Project..     $25,705,099  Increase                $23,535,781  Volume of funds
                                                    Competition in the                   processed annually by
                                                    Financial Sector.                    the national payment
                                                                                         system.
                                                                                        Number of accountants
                                                                                         and financial experts
                                                                                         registered to become
                                                                                         CPA.
                                                                                        Number of Central Bank
                                                                                         branches capable of
                                                                                         accepting auction
                                                                                         tenders.
                                                                                        Outstanding value of
                                                                                         savings accounts from
                                                                                         CEM in the Zones.
                                                                                        Number of MFIs
                                                                                         participating in the
                                                                                         Refinancing and
                                                                                         Guarantee funds.
                                                                                        Maximum check clearing
                                                                                         delay.
                                                                                        Network equipment and
                                                                                         integrator.
                                                                                        Real time gross
                                                                                         settlement system
                                                                                         (RTGS).
                                                                                        Telecommunication
                                                                                         facilities.
                                                                                        Retail payment clearing
                                                                                         system.
                                                                                        Number of CEM branches
                                                                                         built in the Zones.
                                                                                        Number of savings
                                                                                         accounts from CEM in
                                                                                         the Zones.
                                                                                        Percent of Micro-Finance
                                                                                         Institution (MFI) loans
                                                                                         recorded in the Central
                                                                                         Bank database.
Agricultural Business Investment      $13,687,987  Improve                 $13,582,533  Number of farmers
 Project.                                           Agricultural                         receiving technical
                                                    Projection                           assistance.
                                                    Technologies and                    Number of marketing
                                                    Market Capacity in                   contracts of ABC
                                                    Rural Areas.                         clients.
                                                                                        Number of farmers
                                                                                         employing technical
                                                                                         assistance.
                                                                                        Value of refinancing
                                                                                         loans and guarantees
                                                                                         issued to participating
                                                                                         MFIs (as a measure of
                                                                                         value of agricultural
                                                                                         and rural loans).
                                                                                        Number of
                                                                                         Mnist[egrave]re de
                                                                                         l'Agriculture, de
                                                                                         l'Elevage et de la
                                                                                         P[ecirc]che-Ministry of
                                                                                         Agriculture, Livestock,
                                                                                         and Fishing (MAEP)
                                                                                         agents trained in
                                                                                         marketing and
                                                                                         investment promotion.
                                                                                        Number of people
                                                                                         receiving information
                                                                                         from Agricultural
                                                                                         Business Center (ABCs)
                                                                                         on business
                                                                                         opportunities.
Program Administration \1\ and        $18,481,991  ...................     $17,789,908  ........................
 Control, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................      $1,368,813  ........................
----------------------------------------------------------------------------------------------------------------
FY2010 Madagascar post-compact disbursement related to final payment of audit expenses.
----------------------------------------------------------------------------------------------------------------


[[Page 82077]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2010 Quarter 4 Total Obligation: $205,000,000
       Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $25,043,989
----------------------------------------------------------------------------------------------------------------
Rural Development Project........     $68,273,380  Increase the            $61,630,024  Number of program
                                                    productivity and                     farmers harvesting high-
                                                    business skills of                   value horticulture
                                                    farmers who                          crops.
                                                    operate small and                   Number of hectares
                                                    medium-size farms                    harvesting high-value
                                                    and their                            horticulture crops.
                                                    employees.                          Number of business plans
                                                                                         prepared by program
                                                                                         farmers with assistance
                                                                                         from the implementing
                                                                                         entity.
                                                                                        Total value of net
                                                                                         sales.
                                                                                        Total number of
                                                                                         recruited farmers
                                                                                         receiving technical
                                                                                         assistance.
                                                                                        Value of loans disbursed
                                                                                         to farmers,
                                                                                         agribusiness, and other
                                                                                         producers and vendors
                                                                                         in the horticulture
                                                                                         industry, including
                                                                                         Program Farmers,
                                                                                         cumulative to date,
                                                                                         Trust Fund Resources.
                                                                                        Number of loans
                                                                                         disbursed
                                                                                         (disaggregated by trust
                                                                                         fund, leveraged from
                                                                                         trust fund, and
                                                                                         institutions receiving
                                                                                         technical assistance
                                                                                         from ACDI-VOCA).
                                                                                        Number of hectares under
                                                                                         irrigation.
                                                                                        Number of farmers
                                                                                         connected to the
                                                                                         community irrigation
                                                                                         system.
Transportation Project...........    $120,591,240  Reduce                 $111,068,610  Freight shipment cost
                                                    transportation                       from Tegucigalpa to
                                                    costs between                        Puerto Cortes.
                                                    targeted                            Average annual daily
                                                    production centers                   traffic volume--CA-5.
                                                    and national,                       International roughness
                                                    regional and                         index (IRI)--CA-5.
                                                    global markets.                     Kilometers of road
                                                                                         upgraded--CA-5.
                                                                                        Percent of contracted
                                                                                         road works disbursed--
                                                                                         CA-5.
                                                                                        Average annual daily
                                                                                         traffic volume--
                                                                                         secondary roads.
                                                                                        International roughness
                                                                                         index (IRI)--secondary
                                                                                         roads.
                                                                                        Kilometers of road
                                                                                         upgraded--secondary
                                                                                         roads.
                                                                                        Average annual daily
                                                                                         traffic volume--rural
                                                                                         roads.
                                                                                        Average speed--Cost per
                                                                                         journey (rural roads).
                                                                                        Kilometers of road
                                                                                         upgraded--rural roads.
                                                                                        Percent disbursed for
                                                                                         contracted studies
                                                                                        Value of signed
                                                                                         contracts for
                                                                                         feasibility, design,
                                                                                         supervision and program
                                                                                         mgmt contracts.
                                                                                        Kilometers (km) of roads
                                                                                         under design.
                                                                                        Number of Construction
                                                                                         works and supervision
                                                                                         contracts signed.
                                                                                        Kilometers (km) of roads
                                                                                         under works contracts.
Program Administration\1,\ \3\        $16,135,380  ...................     $24,767,387
 and Control, Monitoring and
 Evaluation.
Pending subsequent reports.\2\                                                     -$3
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2010 Quarter 4 Total Obligation: $110,078,488
      Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $18,659,128
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $12,031,549  Increase                $10,779,392  Productivity:
 Support Project.                                   agricultural                         Horticulture, Paul
                                                    production in                        watershed.
                                                    three targeted                      Productivity:
                                                    watershed areas on                   Horticulture, Faja
                                                    three islands.                       watershed.
                                                                                        Productivity:
                                                                                         Horticulture, Mosteiros
                                                                                         watershed.
                                                                                        Number of farmers
                                                                                         adopting drip
                                                                                         irrigation: All
                                                                                         intervention watersheds
                                                                                         (Paul, Faja and
                                                                                         Mosteiros)
                                                                                         (incremental).
                                                                                        Area irrigated with drip
                                                                                         irrigation: All
                                                                                         intervention watersheds
                                                                                         (Paul, Faja and
                                                                                         Mosteiros)
                                                                                         (incremental).
                                                                                        Irrigation Works:
                                                                                         Percent contracted
                                                                                         works disbursed. All
                                                                                         intervention watersheds
                                                                                         (Paul, Faja and
                                                                                         Mosteiros)
                                                                                         (incremental).
                                                                                        Number of reservoirs
                                                                                         constructed in all
                                                                                         intervention watersheds
                                                                                         (Paul, Faja and
                                                                                         Mosteiros)
                                                                                         (incremental).

[[Page 82078]]

 
                                                                                        Number of farmers that
                                                                                         have completed training
                                                                                         in at least 3 of 5 core
                                                                                         agricultural
                                                                                         disciplines: All
                                                                                         intervention watersheds
                                                                                         (Paul, Faja and
                                                                                         Mosteiros)
                                                                                         (incremental).
Infrastructure Improvement            $82,630,208  Increase                $67,214,181  Travel time ratio:
 Project.                                           integration of the                   Percentage of
                                                    internal market                      beneficiary population
                                                    and reduce                           further than 30 minutes
                                                    transportation                       from nearest market.
                                                    costs.                              Kilometers of roads
                                                                                         rehabilitated.
                                                                                        Percent of contracted
                                                                                         Santiago Roads works
                                                                                         disbursed (cumulative).
                                                                                        Percent of contracted
                                                                                         Santo Antao Bridge
                                                                                         works disbursed
                                                                                         (cumulative).
                                                                                        Port of Praia: Percent
                                                                                         of contracted port
                                                                                         works disbursed
                                                                                         (cumulative).
                                                                                        Cargo village: Percent
                                                                                         of contracted works
                                                                                         disbursed (cumulative).
                                                                                        Quay 2 improvements:
                                                                                         Percent of contracted
                                                                                         works disbursed
                                                                                         (cumulative).
                                                                                        Access road: Percent of
                                                                                         contracted works
                                                                                         disbursed (cumulative).
Private Sector Development             $1,931,223  Spur private sector      $1,555,936  MFI portfolio at risk,
 Project.                                           development on all                   adjusted (level).
                                                    islands through
                                                    increased
                                                    investment in the
                                                    priority sectors
                                                    and through
                                                    financial sector
                                                    reform.
Program Administration \1,\ \3\       $13,485,508  ...................     $23,248,592  ........................
 and Control, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................            $480  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2010 Quarter 4 Total Obligation: $113,500,000
       Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $7,519,183
----------------------------------------------------------------------------------------------------------------
Property Regularization Project..      $7,180,454  Increase investment      $5,386,594  Automated database of
                                                    by strengthening                     registry and cadastre
                                                    property rights.                     installed in the 10
                                                                                         municipalities of Leon.
                                                                                        Value of land, urban.
                                                                                        Value of land, rural.
                                                                                        Time to conduct a land
                                                                                         transaction.
                                                                                        Number of additional
                                                                                         parcels with a
                                                                                         registered title,
                                                                                         urban.
                                                                                        Number of additional
                                                                                         parcels with a
                                                                                         registered title,
                                                                                         rural.
                                                                                        Area covered by
                                                                                         cadastral mapping.
                                                                                        Cost to conduct a land
                                                                                         transaction.
Transportation Project...........     $57,999,999  Reduce                  $56,893,204  Annual average daily
                                                    transportation                       traffic volume: N1
                                                    costs between Leon                   Section R1.
                                                    and Chinandega and                  Annual average daily
                                                    national, regional                   traffic volume: N1
                                                    and global markets.                  Section R2.
                                                                                        Annual average daily
                                                                                         traffic volume: Port
                                                                                         Sandino (S13).
                                                                                        Annual average daily
                                                                                         traffic volume:
                                                                                         Villanueva--Guasaule
                                                                                         Annual.
                                                                                        Average daily traffic
                                                                                         volume: Somotillo-Cinco
                                                                                         Pinos (S1).
                                                                                        Annual average daily
                                                                                         traffic volume:
                                                                                         Le[oacute]n-Poneloya-
                                                                                         Las Pe[ntilde]itas.
                                                                                        International Roughness
                                                                                         Index: N-I Section R1.
                                                                                        International Roughness
                                                                                         Index: N-I Section R2.
                                                                                        International Roughness
                                                                                         Index: Port Sandino
                                                                                         (S13).
                                                                                        International Roughness
                                                                                         Index: Villanueva--
                                                                                         Guasaule.
                                                                                        International Roughness
                                                                                         Index: Somotillo-Cinco
                                                                                         Pinos.
                                                                                        International Roughness
                                                                                         Index: Le[oacute]n-
                                                                                         Poneloya-Las
                                                                                         Pe[ntilde]itas.
                                                                                        Kilometers of NI
                                                                                         upgraded: R1 and R2 and
                                                                                         S13.
                                                                                        Kilometers of NI
                                                                                         upgraded: Villanueva--
                                                                                         Guasaule.
                                                                                        Kilometers of S1 road
                                                                                         upgraded.
                                                                                        Kilometers of S9 road
                                                                                         upgraded.

[[Page 82079]]

 
Rural Development Project........     $32,875,845  Increase the value      $27,429,435  Number of beneficiaries
                                                    added of farms and                   with business plans.
                                                    enterprises in the                  Numbers of manzanas (1
                                                    region.                              Manzana = 1.7
                                                                                         hectares), by sector,
                                                                                         harvesting higher-value
                                                                                         crops.
                                                                                        Number of beneficiaries
                                                                                         with business plans
                                                                                         prepared with
                                                                                         assistance of Rural
                                                                                         Business Development
                                                                                         Project.
                                                                                        Number of beneficiaries
                                                                                         implementing Forestry
                                                                                         business plans under
                                                                                         Improvement of Water
                                                                                         Supplies Activity.
                                                                                        Number of Manzanas
                                                                                         reforested.
                                                                                        Number of Manzanas with
                                                                                         trees planted.
Program Administration, \1\ Due       $15,443,702  ...................     $14,670,657  ........................
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................      $1,487,373  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2010 Quarter 4 Total Obligation: $395,300,000
        Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $92,476,526
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $315,750,000  Key Regional           $202,815,531  Household savings from
 Rehabilitation Project.                            Infrastructure                       Infrastructure
                                                    Rehabilitated.                       Rehabilitation
                                                                                         Activities.
                                                                                        Savings in vehicle
                                                                                         operating costs (VOC).
                                                                                        International roughness
                                                                                         index (IRI).
                                                                                        Annual average daily
                                                                                         traffic (AADT).
                                                                                        Travel Time.
                                                                                        Road paved/completed.
                                                                                        Construction Works
                                                                                         completed (Contract 1).
                                                                                        Construction Works
                                                                                         completed (Contract 2).
                                                                                        Signed contracts for
                                                                                         feasibility and/or
                                                                                         design studies.
                                                                                        Percent of contracted
                                                                                         studies disbursed.
                                                                                        Kilometers of roads
                                                                                         under design.
                                                                                        Signed contracts for
                                                                                         road works.
                                                                                        Kilometers of roads
                                                                                         under works contracts.
                                                                                        Site rehabilitated
                                                                                         (phases I, II, III)--
                                                                                         pipeline.
                                                                                        Construction works
                                                                                         completed (phase II)--
                                                                                         pipeline.
                                                                                        Savings in household
                                                                                         expenditures for all
                                                                                         RID subprojects.
                                                                                        Population Served by all
                                                                                         RID subprojects.
                                                                                        RID Subprojects
                                                                                         completed.
                                                                                        Value of RID Grant
                                                                                         Agreements signed.
                                                                                        Value of project works
                                                                                         and goods contracts
                                                                                         Signed.
                                                                                        RID subprojects with
                                                                                         works initiated.
Regional Enterprise Development       $52,530,800  Enterprises in          $41,856,073  Jobs Created by
 Project.                                           Regions Developed.                   Agribusiness
                                                                                         Development Activity
                                                                                         (ADA) and by Georgia
                                                                                         Regional Development
                                                                                         Fund (GRDF).
                                                                                        Household net income--
                                                                                         ADA and GRDF.
                                                                                        Jobs created--ADA.
                                                                                        Firm income--ADA.
                                                                                        Household net income--
                                                                                         ADA.
                                                                                        Beneficiaries (direct
                                                                                         and indirect)--ADA.
                                                                                        Grant agreements signed--
                                                                                         ADA.
                                                                                        Increase in gross
                                                                                         revenues of portfolio
                                                                                         companies (PC).
                                                                                        Increase in portfolio
                                                                                         company employees.
                                                                                        Increase in wages paid
                                                                                         to the portfolio
                                                                                         company employees.
                                                                                        Portfolio companies
                                                                                         (PC).
                                                                                        Funds disbursed to the
                                                                                         portfolio companies.
Program Administration \1,\ \3\,      $32,350,000  ...................     $18,641,284
 Due Diligence, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................              $2  ........................

[[Page 82080]]

 
----------------------------------------------------------------------------------------------------------------
November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
 additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works
 in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the
 original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30,
 2009.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2010 Quarter 4 Total Obligation: $65,690,000
        Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $7,256,856
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,162,579  Facilitate              $59,105,315  Traffic volume (average
 Project.                                           transportation to                    annual daily traffic)--
                                                    increase tourism                     Efate: Ring Road.
                                                    and business                        Traffic Volume (average
                                                    development.                         annual daily traffic)--
                                                                                         Santo: East Coast Road.
                                                                                        Kilometers of road
                                                                                         upgraded--Efate: Ring
                                                                                         Road.
                                                                                        Kilometers of roads
                                                                                         upgraded--Santo: East
                                                                                         Coast Road.
                                                                                        Percent of contracted
                                                                                         roads works disbursed
                                                                                         (USD disbursed): Total
                                                                                         (Cumulative).
Program Administration,\1\ Due         $5,527,421  ...................      $3,703,400
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................         $19,947
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2010 Quarter 4 Total Obligation: $235,650,000
        Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $19,213,705
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project        $152,709,208  Increase                $66,605,940  Training/technical
 (Agriculture and Water).                           agricultural                         assistance provided for
                                                    productivity,                        On-Farm Water
                                                    Improve and                          Management.
                                                    Quality of                          Training/technical
                                                    Irrigation.                          assistance provided for
                                                                                         Post-Harvest
                                                                                         Processing.
                                                                                        Loans Provided.
                                                                                        Percent of contracted
                                                                                         works disbursed.
                                                                                        Value of signed
                                                                                         contracts for
                                                                                         irrigation works.
                                                                                        Number of farmers using
                                                                                         better on-farm water
                                                                                         management.
                                                                                        Number of enterprises
                                                                                         using improved
                                                                                         techniques.
                                                                                        Value of irrigation
                                                                                         feasibility and/or
                                                                                         detailed design
                                                                                         contracts signed.
                                                                                        Additional Land
                                                                                         irrigated under
                                                                                         project.
                                                                                        Percent of contracted
                                                                                         irrigation feasibility
                                                                                         and/or design studies
                                                                                         disbursed.
Rural Road Rehabilitation Project     $67,100,000  Better access to         $7,870,945  Average annual daily
                                                    economic and                         traffic on Pilot Roads.
                                                    social                              International roughness
                                                    infrastructure.                      index for Pilot Roads.
                                                                                        Road Sections
                                                                                         Rehabilitated--Pilot
                                                                                         Roads.
                                                                                        Pilot Roads: Percent of
                                                                                         Works Completed.
Program Administration \1,\ \3\,      $15,840,792  ...................     $19,937,668
 Due Diligence, Monitoring and
 Evaluation.
Pending subsequent reports.\2\     ..............  ...................        $925,337
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2010 Quarter 4 Total Obligation: $307,298,040
         Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $23,613,176
----------------------------------------------------------------------------------------------------------------
Access to Financial Services          $19,650,000  Expand Access to         $4,804,163  Volume of credits
 Project.                                           Financial Services.                  granted by the Micro-
                                                                                         Finance Institutions
                                                                                         (MFI).
                                                                                        Volume of saving
                                                                                         collected by the Micro-
                                                                                         Finance Institutions.
                                                                                        Average portfolio at
                                                                                         risk >90 days of
                                                                                         microfinance
                                                                                         institutions at the
                                                                                         national level.
                                                                                        Operational self-
                                                                                         sufficiency of MFIs at
                                                                                         the national level.
                                                                                        Number of institutions
                                                                                         receiving grants
                                                                                         through the Facility.
                                                                                        Number of MFIs inspected
                                                                                         by CSSFD.

[[Page 82081]]

 
Access to Justice Project........     $34,270,000  Improved Ability of      $4,387,059  Average time to enforce
                                                    Justice System to                    a contract.
                                                    Enforce Contracts                   Percent of firms
                                                    and Reconcile                        reporting confidence in
                                                    Claims.                              the judicial system.
                                                                                        Passage of new legal
                                                                                         codes.
                                                                                        Average time required
                                                                                         for Tribunaux de
                                                                                         premiere instance--
                                                                                         arbitration centers and
                                                                                         courts of first
                                                                                         instance (TPI) to reach