Advisory Committee on Reactor Safeguards; Notice of Meeting, 81317-81318 [2010-32431]

Download as PDF Federal Register / Vol. 75, No. 247 / Monday, December 27, 2010 / Notices For further details with respect to the proposed action, see the licensee’s letter dated August 3, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102230442), as supplemented by letters dated October 22, 2010 (ADAMS Accession No. ML102950490) and November 15, 2010 (ADAMS Accession No. ML103200126). Documents may be examined, and/or copied for a fee, at the NRC’s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc. gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800–397–4209 or 301–415–4737, or send an e-mail to pdr. resource@nrc.gov. Dated at Rockville, Maryland, this 14th day of December, 2010. For the Nuclear Regulatory Commission. Mahesh Chawla, Project Manager, Plant Licensing Branch III– 1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2010–32425 Filed 12–23–10; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards; Notice of Meeting erowe on DSK5CLS3C1PROD with NOTICES In accordance with the purposes of Sections 29 and 182b of the Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on Reactor Safeguards (ACRS) will hold a meeting on January 13–15, 2011, 11545 Rockville Pike, Rockville, Maryland. The date of this meeting was previously published in the Federal Register on Thursday, October 21, 2010 (74 FR 65038–65039). Thursday, January 13, 2011, Conference Room T2–B1, Two White Flint North, Rockville, Maryland 8:30 a.m.–8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)—The ACRS Chairman will make opening remarks regarding the conduct of the meeting. 8:35 a.m.–10 a.m.: Aircraft Impact Assessment for the Revised AP1000 Design (Open/Closed)—The Committee VerDate Mar<15>2010 15:15 Dec 23, 2010 Jkt 223001 will hear presentations by and hold discussions with representatives of the NRC staff and Westinghouse regarding the Aircraft Impact Assessment for the revised AP1000 Design. [Note: A portion of this session may be closed in order to protect unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), and information designated as proprietary by Westinghouse, pursuant to 5 U.S.C. 552b(c)(4).] 10:15 a.m.–12 p.m.: Final Safety Evaluation Report Associated With the Vogtle Units 3 and 4 Combined License Application (Open/Closed)—The Committee will hear presentations by and hold discussions with representatives of the NRC staff, Southern Nuclear Company, and NuStar Energy regarding the Final Safety Evaluation Report associated with the Vogtle Units 3 and 4 Combined License Application. [Note: A portion of this session may be closed in order to protect information designated as proprietary by Westinghouse pursuant to 5 U.S.C. 552b(c)(4).] 2 p.m.–3:30 p.m.: Draft Final Revision 2 to Regulatory Guide (RG) 1.174, ‘‘An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,’’ and Draft Final Revision 1 to RG 1.177, ‘‘An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications’’ (Open) The Committee will hear presentations by and hold discussions with representatives of the NRC staff regarding Draft Final Revision 2 to RG 1.174, ‘‘An Approach for Using Probabilistic Risk Assessment in RiskInformed Decisions on Plant-Specific Changes to the Licensing Basis’’; Draft Final Revision 1 to RG 1.177, ‘‘An Approach for Plant-Specific, RiskInformed Decisionmaking: Technical Specifications’’; and the staff’s reconciliation of public comments. 3:45 p.m.–7 p.m.: Preparation of ACRS Reports (Open/Closed)—The Committee will discuss proposed ACRS reports on matters discussed during this meeting. [Note: A portion of this session may be closed in order to protect unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), and information designated as proprietary by Westinghouse, pursuant to 5 U.S.C. 552b(c)(4).] Friday, January 14, 2011, Conference Room T2–B1, Two White Flint North, Rockville, Maryland 8:30 a.m.–8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)—The ACRS Chairman will make PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 81317 opening remarks regarding the conduct of the meeting. 8:35 a.m.–10:30 a.m.: Draft Final Rule and Regulatory Guidance Regarding Enhancements to Emergency Preparedness Regulations (Open): The Committee will hear presentations by and hold discussions with representatives of the NRC staff regarding the draft final rule, ‘‘Enhancements to Emergency Preparedness Regulations’’; Regulatory Guide 1.219, ‘‘Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors’’; Interim Staff Guidance (ISG) NSIR/DPR–ISG–01,‘‘Emergency Planning for Nuclear Power Plants’’; and NUREG/CR–7002, ‘‘Criteria for Development of Evacuation Time Estimate Studies.’’ 10:45 a.m.–12:15 p.m.: Staff Assessment of the RAMONA5–FA Code (Open/Closed): The Committee will hear presentations by and hold discussions with representatives of the NRC staff and AREVA regarding the staff’s assessment of the RAMONA5–FA code. [Note: A portion of this session may be closed in order to protect information designated as proprietary by AREVA pursuant to 5 U.S.C. 552b(c)(4).] 1:15 p.m.–2:45 p.m.: Future ACRS Activities/Report of the Planning and Procedures Subcommittee (Open/ Closed)—The Committee will discuss the recommendations of the Planning and Procedures Subcommittee regarding items proposed for consideration by the Full Committee during future ACRS meetings, and matters related to the conduct of ACRS business, including anticipated workload and member assignments. [Note: A portion of this meeting may be closed pursuant to 5 U.S.C. 552b (c)(2) and (6) to discuss organizational and personnel matters that relate solely to internal personnel rules and practices of ACRS, and information the release of which would constitute a clearly unwarranted invasion of personal privacy.] 2:45 p.m.–3 p.m.: Reconciliation of ACRS Comments and Recommendations (Open)—The Committee will discuss the responses from the NRC Executive Director for Operations to comments and recommendations included in recent ACRS reports and letters. 3:15 p.m.–4:15 p.m.: Preparation of ACRS Reports (Open/Closed)—The Committee will continue its discussion of proposed ACRS reports. [Note: A portion of this session may be closed in order to protect unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), and information designated E:\FR\FM\27DEN1.SGM 27DEN1 81318 Federal Register / Vol. 75, No. 247 / Monday, December 27, 2010 / Notices erowe on DSK5CLS3C1PROD with NOTICES as proprietary by Westinghouse or AREVA, pursuant to 5 U.S.C 552b(c)(4).] Saturday, January 15, 2011 Conference Room T2–B1, Two White Flint North, Rockville, Maryland 8:30 a.m.–1 p.m.: Preparation of ACRS Reports (Open/Closed)—The Committee will continue its discussion of proposed ACRS reports. [Note: A portion of this session may be closed in order to protect unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), and information designated as proprietary by Westinghouse or AREVA, pursuant to 5 U.S.C 552b(c)(4).] 1 p.m.–1:30 p.m.: Miscellaneous (Open)—The Committee will continue its discussion related to the conduct of Committee activities and specific issues that were not completed during previous meetings. Procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 21, 2010, (75 FR 65038–65039). In accordance with those procedures, oral or written views may be presented by members of the public, including representatives of the nuclear industry. Persons desiring to make oral statements should notify Ms. Ilka Berrios, Cognizant ACRS Staff (Telephone: 301– 415–3179, E-mail: Ilka.Berrios@nrc.gov), five days before the meeting, if possible, so that appropriate arrangements can be made to allow necessary time during the meeting for such statements. In view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with the Cognizant ACRS staff if such rescheduling would result in major inconvenience. Thirty-five hard copies of each presentation or handout should be provided 30 minutes before the meeting. In addition, one electronic copy of each presentation should be e-mailed to the Cognizant ACRS Staff one day before meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Cognizant ACRS Staff with a CD containing each presentation at least 30 minutes before the meeting. In accordance with Subsection 10(d) Public Law 92–463, and 5 U.S.C. 552b(c), certain portions of this meeting may be closed, as specifically noted above. Use of still, motion picture, and television cameras during the meeting may be limited to selected portions of the meeting as determined by the Chairman. Electronic recordings will be permitted only during the open portions of the meeting. VerDate Mar<15>2010 15:15 Dec 23, 2010 Jkt 223001 ACRS meeting agenda, meeting transcripts, and letter reports are available through the NRC Public Document Room at pdr.resource@nrc.gov, or by calling the PDR at 1–800–397–4209, or from the Publicly Available Records System (PARS) component of NRC’s document system (ADAMS) which is accessible from the NRC Web site at https:// www.nrc.gov/reading-rm/adams.html or https://www.nrc.gov/reading-rm/doccollections/ACRS/. Video teleconferencing service is available for observing open sessions of ACRS meetings. Those wishing to use this service for observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio Visual Technician (301–415–8066), between 7:30 a.m. and 3:45 p.m. (ET), at least 10 days before the meeting to ensure the availability of this service. Individuals or organizations requesting this service will be responsible for telephone line charges and for providing the equipment and facilities that they use to establish the video teleconferencing link. The availability of video teleconferencing services is not guaranteed. Dated: December 20, 2010. Andrew L. Bates, Advisory Committee Management Officer. [FR Doc. 2010–32431 Filed 12–23–10; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS) Meeting of The ACRS Subcommittee on AP1000; Notice of Meeting The ACRS Subcommittee on AP1000 will hold a meeting on January 10–11, 2011, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance with the exception of portions that may be closed to protect proprietary information pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting shall be as follows: Monday, January 10, 2011—8:30 AM until 5:00 PM and Tuesday, January 11, 2011—8:30 a.m. until 12 p.m. The Subcommittee will review the Final Safety Evaluation Report (FSER) associated with the Virgil C. Summer Combined License Application. The Subcommittee will hear presentations by and hold discussions with representatives of South Carolina Electric & Gas, the NRC staff, and other interested persons regarding this matter. PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Weidong Wang (Telephone 301–415–6279 or E-mail: Weidong.Wang@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be e-mailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 21, 2010, (75 FR 65038–65039). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. Dated: December 20, 2010. Ilka Berrios, Acting Chief, Reactor Safety Branch B, Advisory Committee on Reactor Safeguards. [FR Doc. 2010–32428 Filed 12–23–10; 8:45 am] BILLING CODE 7590–01–P POSTAL SERVICE Product Change—Express Mail Negotiated Service Agreement Postal ServiceTM. ACTION: Notice. AGENCY: Postal Service notice of filing of a request with the Postal Regulatory SUMMARY: E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 75, Number 247 (Monday, December 27, 2010)]
[Notices]
[Pages 81317-81318]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-32431]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards; Notice of Meeting

    In accordance with the purposes of Sections 29 and 182b of the 
Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on 
Reactor Safeguards (ACRS) will hold a meeting on January 13-15, 2011, 
11545 Rockville Pike, Rockville, Maryland. The date of this meeting was 
previously published in the Federal Register on Thursday, October 21, 
2010 (74 FR 65038-65039).

Thursday, January 13, 2011, Conference Room T2-B1, Two White Flint 
North, Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-10 a.m.: Aircraft Impact Assessment for the Revised 
AP1000 Design (Open/Closed)--The Committee will hear presentations by 
and hold discussions with representatives of the NRC staff and 
Westinghouse regarding the Aircraft Impact Assessment for the revised 
AP1000 Design.

    [Note: A portion of this session may be closed in order to 
protect unclassified safeguards information, pursuant to 5 U.S.C. 
552b(c)(3), and information designated as proprietary by 
Westinghouse, pursuant to 5 U.S.C. 552b(c)(4).]

    10:15 a.m.-12 p.m.: Final Safety Evaluation Report Associated With 
the Vogtle Units 3 and 4 Combined License Application (Open/Closed)--
The Committee will hear presentations by and hold discussions with 
representatives of the NRC staff, Southern Nuclear Company, and NuStar 
Energy regarding the Final Safety Evaluation Report associated with the 
Vogtle Units 3 and 4 Combined License Application.

    [Note: A portion of this session may be closed in order to 
protect information designated as proprietary by Westinghouse 
pursuant to 5 U.S.C. 552b(c)(4).]

    2 p.m.-3:30 p.m.: Draft Final Revision 2 to Regulatory Guide (RG) 
1.174, ``An Approach for Using Probabilistic Risk Assessment in Risk-
Informed Decisions on Plant-Specific Changes to the Licensing Basis,'' 
and Draft Final Revision 1 to RG 1.177, ``An Approach for Plant-
Specific, Risk-Informed Decisionmaking: Technical Specifications'' 
(Open) The Committee will hear presentations by and hold discussions 
with representatives of the NRC staff regarding Draft Final Revision 2 
to RG 1.174, ``An Approach for Using Probabilistic Risk Assessment in 
Risk-Informed Decisions on Plant-Specific Changes to the Licensing 
Basis''; Draft Final Revision 1 to RG 1.177, ``An Approach for Plant-
Specific, Risk-Informed Decisionmaking: Technical Specifications''; and 
the staff's reconciliation of public comments.
    3:45 p.m.-7 p.m.: Preparation of ACRS Reports (Open/Closed)--The 
Committee will discuss proposed ACRS reports on matters discussed 
during this meeting.

    [Note: A portion of this session may be closed in order to 
protect unclassified safeguards information, pursuant to 5 U.S.C. 
552b(c)(3), and information designated as proprietary by 
Westinghouse, pursuant to 5 U.S.C. 552b(c)(4).]

Friday, January 14, 2011, Conference Room T2-B1, Two White Flint North, 
Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-10:30 a.m.: Draft Final Rule and Regulatory Guidance 
Regarding Enhancements to Emergency Preparedness Regulations (Open): 
The Committee will hear presentations by and hold discussions with 
representatives of the NRC staff regarding the draft final rule, 
``Enhancements to Emergency Preparedness Regulations''; Regulatory 
Guide 1.219, ``Guidance on Making Changes to Emergency Plans for 
Nuclear Power Reactors''; Interim Staff Guidance (ISG) NSIR/DPR-ISG-
01,``Emergency Planning for Nuclear Power Plants''; and NUREG/CR-7002, 
``Criteria for Development of Evacuation Time Estimate Studies.''
    10:45 a.m.-12:15 p.m.: Staff Assessment of the RAMONA5-FA Code 
(Open/Closed): The Committee will hear presentations by and hold 
discussions with representatives of the NRC staff and AREVA regarding 
the staff's assessment of the RAMONA5-FA code.

    [Note: A portion of this session may be closed in order to 
protect information designated as proprietary by AREVA pursuant to 5 
U.S.C. 552b(c)(4).]

    1:15 p.m.-2:45 p.m.: Future ACRS Activities/Report of the Planning 
and Procedures Subcommittee (Open/Closed)--The Committee will discuss 
the recommendations of the Planning and Procedures Subcommittee 
regarding items proposed for consideration by the Full Committee during 
future ACRS meetings, and matters related to the conduct of ACRS 
business, including anticipated workload and member assignments.

    [Note: A portion of this meeting may be closed pursuant to 5 
U.S.C. 552b (c)(2) and (6) to discuss organizational and personnel 
matters that relate solely to internal personnel rules and practices 
of ACRS, and information the release of which would constitute a 
clearly unwarranted invasion of personal privacy.]

    2:45 p.m.-3 p.m.: Reconciliation of ACRS Comments and 
Recommendations (Open)--The Committee will discuss the responses from 
the NRC Executive Director for Operations to comments and 
recommendations included in recent ACRS reports and letters.
    3:15 p.m.-4:15 p.m.: Preparation of ACRS Reports (Open/Closed)--The 
Committee will continue its discussion of proposed ACRS reports. [Note: 
A portion of this session may be closed in order to protect 
unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), 
and information designated

[[Page 81318]]

as proprietary by Westinghouse or AREVA, pursuant to 5 U.S.C 
552b(c)(4).]

Saturday, January 15, 2011 Conference Room T2-B1, Two White Flint 
North, Rockville, Maryland

    8:30 a.m.-1 p.m.: Preparation of ACRS Reports (Open/Closed)--The 
Committee will continue its discussion of proposed ACRS reports. [Note: 
A portion of this session may be closed in order to protect 
unclassified safeguards information, pursuant to 5 U.S.C. 552b(c)(3), 
and information designated as proprietary by Westinghouse or AREVA, 
pursuant to 5 U.S.C 552b(c)(4).]
    1 p.m.-1:30 p.m.: Miscellaneous (Open)--The Committee will continue 
its discussion related to the conduct of Committee activities and 
specific issues that were not completed during previous meetings.
    Procedures for the conduct of and participation in ACRS meetings 
were published in the Federal Register on October 21, 2010, (75 FR 
65038-65039). In accordance with those procedures, oral or written 
views may be presented by members of the public, including 
representatives of the nuclear industry. Persons desiring to make oral 
statements should notify Ms. Ilka Berrios, Cognizant ACRS Staff 
(Telephone: 301-415-3179, E-mail: Ilka.Berrios@nrc.gov), five days 
before the meeting, if possible, so that appropriate arrangements can 
be made to allow necessary time during the meeting for such statements. 
In view of the possibility that the schedule for ACRS meetings may be 
adjusted by the Chairman as necessary to facilitate the conduct of the 
meeting, persons planning to attend should check with the Cognizant 
ACRS staff if such rescheduling would result in major inconvenience.
    Thirty-five hard copies of each presentation or handout should be 
provided 30 minutes before the meeting. In addition, one electronic 
copy of each presentation should be e-mailed to the Cognizant ACRS 
Staff one day before meeting. If an electronic copy cannot be provided 
within this timeframe, presenters should provide the Cognizant ACRS 
Staff with a CD containing each presentation at least 30 minutes before 
the meeting.
    In accordance with Subsection 10(d) Public Law 92-463, and 5 U.S.C. 
552b(c), certain portions of this meeting may be closed, as 
specifically noted above. Use of still, motion picture, and television 
cameras during the meeting may be limited to selected portions of the 
meeting as determined by the Chairman. Electronic recordings will be 
permitted only during the open portions of the meeting.
    ACRS meeting agenda, meeting transcripts, and letter reports are 
available through the NRC Public Document Room at pdr.resource@nrc.gov, 
or by calling the PDR at 1-800-397-4209, or from the Publicly Available 
Records System (PARS) component of NRC's document system (ADAMS) which 
is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html or https://www.nrc.gov/reading-rm/doc-collections/ACRS/.
    Video teleconferencing service is available for observing open 
sessions of ACRS meetings. Those wishing to use this service for 
observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio 
Visual Technician (301-415-8066), between 7:30 a.m. and 3:45 p.m. (ET), 
at least 10 days before the meeting to ensure the availability of this 
service.
    Individuals or organizations requesting this service will be 
responsible for telephone line charges and for providing the equipment 
and facilities that they use to establish the video teleconferencing 
link. The availability of video teleconferencing services is not 
guaranteed.

    Dated: December 20, 2010.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. 2010-32431 Filed 12-23-10; 8:45 am]
BILLING CODE 7590-01-P