Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 75, No. 244 / Tuesday, December 21, 2010 / Notices California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Report (EIR)/ Final Environmental Impact Statement (EIS) for the proposed Eldorado-Ivanpah Transmission Project (EITP), Clark County, Nevada, and San Bernardino County, California, and by this notice are announcing its availability. DATES: The BLM will not issue a Record of Decision based on the EITP Final EIR/ EIS until 30 days after the date the Environmental Protection Agency publishes its Notice of Availability in the Federal Register. ADDRESSES: Copies of the EITP Final EIR/EIS are available at the Needles Field Office, 1303 South U.S. Highway 95, Needles, California 92363; on the Internet at: https://www.blm.gov/ca/st/ en/fo/needles.html; and at the BLM California State Office, 2800 Cottage Way, Sacramento, California 95825. Electronic (CD–ROM) or paper copies may also be obtained by contacting George Meckfessel at (760) 326–7000 or by e-mailing your request to caeitp@blm.gov. Please include your name and mailing address. FOR FURTHER INFORMATION CONTACT: For further information and/or to have your name added to our mailing list, contact Tom Hurshman, Project Manager, address: 2465 South Townsend Avenue, Montrose, Colorado 81401; phone: (970) 240–5345; fax: (970) 240–5368, or email: Tom_Hurshman@blm.gov. SUPPLEMENTARY INFORMATION: The BLM’s purpose and need for the EITP is to respond to Southern California Edison’s (SCE) application under Title V of the FLPMA (43 USC 1761) for authorization of a right-of-way (ROW) on BLM-managed lands to upgrade and replace an existing 115-kilovolt (kV) transmission line on public lands with a new double circuit 230-kV transmission line in compliance with FLPMA, BLM’s ROW regulations, and other applicable Federal laws. The upgraded transmission line would extend approximately 35 miles from southern Clark County, Nevada (28 miles), into northeastern San Bernardino County, California (7 miles). The project would also include a new Ivanpah substation in California near Primm, Nevada, which would serve as a connector hub for solar energy generated in the Ivanpah Valley area. The existing Eldorado Substation would be modified to accommodate the new EITP. The segment of transmission line to be replaced is approximately 36 miles long and originates at the existing Eldorado Substation in T. 25 S., R. 62 E., Sec. 1, Mount Diablo Meridian, and terminates at the proposed Ivanpah VerDate Mar<15>2010 20:40 Dec 20, 2010 Jkt 223001 Substation in T. 16 N., R. 14 E., Sec. 4, San Bernardino Meridian. The BLM will decide whether to approve, approve with modification, or deny issuance of a ROW authorization to SCE for the proposed EITP. The EITP would carry electricity from several renewable energy projects proposed in and around the Ivanpah Valley, including the Ivanpah Solar Energy Generation System currently under construction by BrightSource Energy Partners. The proposed transmission line and new substation would be constructed within an existing designated utility corridor. Telecommunications lines are also proposed. The public lands in the project area are managed by the BLM in accordance with the California Desert Conservation Area Plan and the Las Vegas Field Office Resource Management Plan. The BLM will consider approval of the EITP in a manner that avoids or reduces impacts to public lands. This action is consistent with Federal law and the Department of the Interior’s policy to facilitate and encourage the development of renewable energy resources on the public lands pursuant to Title V of FLPMA and Section 211 of the Energy Policy Act of 2005 (119 Stat. 594, 660). In addition to the proposed action and the no action alternatives, the Final EIR/ EIS analyzes six additional action alternatives that address alternative routes for the transmission and telecommunications lines. As proposed, the transmission line has been sited to take advantage of existing designated ROW corridors which are areas identified by BLM land use plans as suitable for ROW development. A Notice of Intent to prepare an EIR/ EIS for the EITP was published in the Federal Register on July 27, 2009 (74 FR 37053) followed by a 30-day public scoping period. A Notice of Availability for the Draft EIR/EIS was published in the Federal Register on May 7, 2010 (75 FR 25288) followed by a 45-day public comment period. The BLM and the CPUC conducted one public meeting during the comment period on the Draft EIR/EIS. Major comments addressed in this Final EIR/EIS concern project impacts on biological resources, compatibility with the proposed Southern Nevada Supplemental Airport, consistency with existing BLM land use plans, and cumulative impacts. PO 00000 Authority: 40 CFR 1506.6, 1506.10, and 43 CFR 1610.2. Thomas Pogacnik, Deputy State Director. [FR Doc. 2010–31970 Filed 12–17–10; 8:45 am] BILLING CODE 4310–40–P DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLES956000–L14200000–BJ0000– LXSITRST0000] Eastern States: Filing of Plat of Survey Bureau of Land Management, Interior. ACTION: Notice of Filing of Plat of Survey; Alabama. AGENCY: The Bureau of Land Management (BLM) will file the plat of survey of the lands described below in the BLM–Eastern States office in Springfield, Virginia, 30 calendar days from the date of publication in the Federal Register. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management-Eastern States, 7450 Boston Boulevard, Springfield, Virginia 22153. Attn: Cadastral Survey. SUPPLEMENTARY INFORMATION: The survey was requested by the Bureau of Indian Affairs. The lands surveyed are: SUMMARY: St. Stephens Meridian, Alabama T. 17 N., R. 19 E. The plat of survey represents the dependent resurvey of Parcel No. 17, land held in trust for the Poarch Band of the Creek Indians, in Township 17 North, Range 19 East, of the St. Stephens Meridian, in the State of Alabama, and was accepted September 28, 2010. We will place a copy of the plat we described in the open files. It will be available to the public as a matter of information. If BLM receives a protest against the survey, as shown on the plat, prior to the date of the official filing, we will stay the filing pending our consideration of the protest. We will not officially file the plat until the day after we have accepted or dismissed all protests and they have become final, including decisions on appeals. Dated: December 14, 2010. Dominica Van Koten, Chief Cadastral Surveyor. [FR Doc. 2010–31984 Filed 12–20–10; 8:45 am] BILLING CODE 4310–GJ–P Frm 00036 Fmt 4703 Sfmt 9990 80069 E:\FR\FM\21DEN1.SGM 21DEN1

Agencies

[Federal Register Volume 75, Number 244 (Tuesday, December 21, 2010)]
[Notices]
[Page 80069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-31984]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[LLES956000-L14200000-BJ0000-LXSITRST0000]


Eastern States: Filing of Plat of Survey

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of Filing of Plat of Survey; Alabama.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) will file the plat of 
survey of the lands described below in the BLM-Eastern States office in 
Springfield, Virginia, 30 calendar days from the date of publication in 
the Federal Register.

FOR FURTHER INFORMATION CONTACT: Bureau of Land Management-Eastern 
States, 7450 Boston Boulevard, Springfield, Virginia 22153. Attn: 
Cadastral Survey.

SUPPLEMENTARY INFORMATION: The survey was requested by the Bureau of 
Indian Affairs.
    The lands surveyed are:

St. Stephens Meridian, Alabama

T. 17 N., R. 19 E.

    The plat of survey represents the dependent resurvey of Parcel 
No. 17, land held in trust for the Poarch Band of the Creek Indians, 
in Township 17 North, Range 19 East, of the St. Stephens Meridian, 
in the State of Alabama, and was accepted September 28, 2010.

    We will place a copy of the plat we described in the open files. It 
will be available to the public as a matter of information.
    If BLM receives a protest against the survey, as shown on the plat, 
prior to the date of the official filing, we will stay the filing 
pending our consideration of the protest.
    We will not officially file the plat until the day after we have 
accepted or dismissed all protests and they have become final, 
including decisions on appeals.

     Dated: December 14, 2010.
Dominica Van Koten,
Chief Cadastral Surveyor.
[FR Doc. 2010-31984 Filed 12-20-10; 8:45 am]
BILLING CODE 4310-GJ-P