Drawbridge Operation Regulations; Mystic River, Mystic, CT, 78163 [2010-31409]
Download as PDF
Federal Register / Vol. 75, No. 240 / Wednesday, December 15, 2010 / Rules and Regulations
request to open is given in accordance
with the subpart.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
Winter conditions on the Upper
Mississippi River coupled with the
closure of Army Corps of Engineer’s
Lock No. 20 (Mile 343.2 UMR), Lock No.
21 (Mile 324.9 UMR) and Lock No. 22
(Mile 301.2 UMR) from January 3, 2011
to February 28, 2011 will preclude any
significant navigation demands for the
drawspan opening.
The Clinton Railroad Drawbridge, in
the closed-to-navigation position,
provides a vertical clearance of 18.7 feet
above normal pool. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft. The drawbridge will open if
at least 24-hours advance notice is
given. This temporary deviation has
been coordinated with waterway users.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: December 2, 2010.
Eric A. Washburn,
Bridge Administrator.
[FR Doc. 2010–31408 Filed 12–14–10; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1028]
Drawbridge Operation Regulations;
Mystic River, Mystic, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 1 Bridge
across the Mystic River, mile 2.8, at
Mystic, CT. The deviation is necessary
to facilitate painting operations at the
bridge. Under this deviation the bridge
may remain in the closed position
during the winter months December
through April.
DATES: This deviation is effective for
enforcement: With actual notice from
December 2, 2010, through December
15, 2010 and with constructive notice
from December 15, 2010 through April
5, 2011.
emcdonald on DSK2BSOYB1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:44 Dec 14, 2010
Jkt 223001
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1028 and are available online at https://
www.regulations.gov, inserting
USCG–2010–1028 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
DEPARTMENT OF HOMELAND
SECURITY
If
you have questions on this rule, call or
e-mail Ms. Judy K. Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, judy.k.leungyee@uscg.mil. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUMMARY:
78163
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
The Route
1 Bridge across the Mystic River at mile
2.8, has a vertical clearance of 4 feet at
mean high water and 7 feet at men low
water. The drawbridge operation
regulations are listed at 33 CFR 117.211.
The normal waterway users are
predominantly recreational craft of
various sizes.
The owner of the bridge, Connecticut
Department of Transportation, requested
a temporary deviation from the
regulations to allow the bridge to remain
in the closed position to facilitate
painting operations at the bridge.
Under this temporary deviation the
Route 1 Bridge may remain in the closed
position from December 2, 2010,
through April 15, 2011, for bridge
painting. Vessels that can pass under
the bridge in the closed position may do
so at any time.
The bridge has received few requests
to open during this time period during
the past three years. The waterway users
were advised of the requested bridge
closure and no objections were received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: December 2, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2010–31409 Filed 12–14–10; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00013
Fmt 4700
Sfmt 4700
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1077]
Drawbridge Operation Regulations;
Annisquam River and Blynman Canal,
Gloucester, MA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Massachusetts Bay
Commuter Railroad Bridge at mile 0.7
across the Annisquam River and
Blynman Canal. The deviation is
necessary to facilitate emergency
structural repair. This deviation allows
the bridge to remain in the closed
position during the deviation period.
DATES: This deviation is effective for
enforcement: With actual notice from
December 1, 2010, through December
15, 2010 and with constructive notice
from December 15, 2010 through April
17, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1077 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1077 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, contact
Mr. John McDonald, Project Officer,
First Coast Guard District,
john.w.mcdonald@uscg.mil, or
telephone (617) 223–8364. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Massachusetts Bay Commuter Railroad
(MBCR) bridge, across the Annisquam
River and Blynman Canal at mile 0.7, at
Gloucester, MA, has a vertical clearance
in the closed position of 16 feet at mean
high water and 25 feet at mean low
water. The drawbridge operation
regulations are listed at 33 CFR 117.586.
E:\FR\FM\15DER1.SGM
15DER1
Agencies
[Federal Register Volume 75, Number 240 (Wednesday, December 15, 2010)]
[Rules and Regulations]
[Page 78163]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-31409]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-1028]
Drawbridge Operation Regulations; Mystic River, Mystic, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 1 Bridge across the Mystic River, mile 2.8, at Mystic, CT. The
deviation is necessary to facilitate painting operations at the bridge.
Under this deviation the bridge may remain in the closed position
during the winter months December through April.
DATES: This deviation is effective for enforcement: With actual notice
from December 2, 2010, through December 15, 2010 and with constructive
notice from December 15, 2010 through April 5, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-1028 and are available online
at https://www.regulations.gov, inserting USCG-2010-1028 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Ms. Judy K. Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 668-7165, judy.k.leung-yee@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 1 Bridge across the Mystic River
at mile 2.8, has a vertical clearance of 4 feet at mean high water and
7 feet at men low water. The drawbridge operation regulations are
listed at 33 CFR 117.211. The normal waterway users are predominantly
recreational craft of various sizes.
The owner of the bridge, Connecticut Department of Transportation,
requested a temporary deviation from the regulations to allow the
bridge to remain in the closed position to facilitate painting
operations at the bridge.
Under this temporary deviation the Route 1 Bridge may remain in the
closed position from December 2, 2010, through April 15, 2011, for
bridge painting. Vessels that can pass under the bridge in the closed
position may do so at any time.
The bridge has received few requests to open during this time
period during the past three years. The waterway users were advised of
the requested bridge closure and no objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 2, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2010-31409 Filed 12-14-10; 8:45 am]
BILLING CODE 9110-04-P