Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA, 78162-78163 [2010-31408]
Download as PDF
78162
Federal Register / Vol. 75, No. 240 / Wednesday, December 15, 2010 / Rules and Regulations
Rate set
For plans with a valuation
date
On or after
*
Before
*
207
1–1–11
*
Before
1–1–11
*
*
Immediate
annuity rate
(percent)
*
207
i3
4.00
n1
*
n2
*
*
4.00
7
8
n1
n2
Appendix C to Part 4022—Lump Sum
Interest Rates For Private-Sector
Payments
*
For plans with a valuation
date
i2
*
4.00
2.25
3. In appendix C to part 4022, Rate Set
207 is added to the table to read as
follows:
On or after
i1
*
2–1–11
■
Rate set
Deferred annuities
(percent)
Immediate
annuity rate
(percent)
*
2–1–11
2.25
*
*
Deferred annuities
(percent)
i1
i2
i3
*
4.00
4.00
*
*
*
4.00
7
8
Authority: 29 U.S.C. 1301(a), 1302(b)(3),
1341, 1344, 1362.
PART 4044—ALLOCATION OF
ASSETS IN SINGLE-EMPLOYER
PLANS
Appendix B to Part 4044—Interest
Rates Used To Value Benefits
5. In appendix B to part 4044, a new
entry for January–March 2011 is added
to the table to read as follows:
*
■
4. The authority citation for part 4044
continues to read as follows:
■
The values of
it
*
*
*
*
are:
For valuation dates occurring in the months—
it
*
*
*
*
January–March 2011 ................................................................................
Issued in Washington, DC, on this 13th day
of December 2010.
Vincent K. Snowbarger,
Deputy Director for Operations, Pension
Benefit Guaranty Corporation.
[FR Doc. 2010–31616 Filed 12–14–10; 8:45 am]
BILLING CODE 7709–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1084]
Drawbridge Operation Regulation;
Upper Mississippi River, Clinton, IA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
emcdonald on DSK2BSOYB1PROD with RULES
AGENCY:
ACTION:
The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Clinton
Railroad Drawbridge across the Upper
SUMMARY:
VerDate Mar<15>2010
17:13 Dec 14, 2010
Jkt 223001
0.0407
for t =
*
1–25
Mississippi River, mile 518.0, at
Clinton, Iowa. The deviation is
necessary to allow the bridge owner
time to perform preventive maintenance
that is essential to the continued safe
operation of the drawbridge.
Maintenance is scheduled in the winter
and when there is less impact on
navigation; instead of scheduling work
in the summer, when river traffic
increases. This deviation allows the
bridge to open on signal if at least 24
hours advance notice is given.
DATES: This deviation is effective from
12:01 a.m., December 15, 2010 to 9 a.m.,
March 1, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1084 and are available online by going
to https://www.regulations.gov, inserting
USCG–2010–1084 in the ‘‘Keyword’’ box
and then clicking ‘‘Search’’. They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
PO 00000
Frm 00012
Fmt 4700
Sfmt 4700
it
for t =
it
for t =
*
0.0393
*
>25
N/A
N/A
and 5 p.m., Monday through Friday,
except Federal holidays.
If
you have questions on this rule, call or
e-mail Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast
Guard; telephone 314–269–2378, e-mail
Eric.Washburn@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
FOR FURTHER INFORMATION CONTACT:
The Union
Pacific Railroad requested a temporary
deviation for the Clinton Railroad
Drawbridge, across the Upper
Mississippi River, mile 518.0, at
Clinton, Iowa to open on signal if at
least 24 hours advance notice is given
for 77 days from 12:01 a.m., December
15, 2010 to 9 a.m., March 1, 2011 to
allow the bridge owner time for
preventive maintenance. The Clinton
Railroad Drawbridge currently operates
in accordance with 33 CFR 117.5, which
states the general requirement that
drawbridges shall open promptly and
fully for the passage of vessels when a
SUPPLEMENTARY INFORMATION:
E:\FR\FM\15DER1.SGM
15DER1
Federal Register / Vol. 75, No. 240 / Wednesday, December 15, 2010 / Rules and Regulations
request to open is given in accordance
with the subpart.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
Winter conditions on the Upper
Mississippi River coupled with the
closure of Army Corps of Engineer’s
Lock No. 20 (Mile 343.2 UMR), Lock No.
21 (Mile 324.9 UMR) and Lock No. 22
(Mile 301.2 UMR) from January 3, 2011
to February 28, 2011 will preclude any
significant navigation demands for the
drawspan opening.
The Clinton Railroad Drawbridge, in
the closed-to-navigation position,
provides a vertical clearance of 18.7 feet
above normal pool. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft. The drawbridge will open if
at least 24-hours advance notice is
given. This temporary deviation has
been coordinated with waterway users.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: December 2, 2010.
Eric A. Washburn,
Bridge Administrator.
[FR Doc. 2010–31408 Filed 12–14–10; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1028]
Drawbridge Operation Regulations;
Mystic River, Mystic, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 1 Bridge
across the Mystic River, mile 2.8, at
Mystic, CT. The deviation is necessary
to facilitate painting operations at the
bridge. Under this deviation the bridge
may remain in the closed position
during the winter months December
through April.
DATES: This deviation is effective for
enforcement: With actual notice from
December 2, 2010, through December
15, 2010 and with constructive notice
from December 15, 2010 through April
5, 2011.
emcdonald on DSK2BSOYB1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:44 Dec 14, 2010
Jkt 223001
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1028 and are available online at https://
www.regulations.gov, inserting
USCG–2010–1028 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
DEPARTMENT OF HOMELAND
SECURITY
If
you have questions on this rule, call or
e-mail Ms. Judy K. Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, judy.k.leungyee@uscg.mil. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUMMARY:
78163
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
The Route
1 Bridge across the Mystic River at mile
2.8, has a vertical clearance of 4 feet at
mean high water and 7 feet at men low
water. The drawbridge operation
regulations are listed at 33 CFR 117.211.
The normal waterway users are
predominantly recreational craft of
various sizes.
The owner of the bridge, Connecticut
Department of Transportation, requested
a temporary deviation from the
regulations to allow the bridge to remain
in the closed position to facilitate
painting operations at the bridge.
Under this temporary deviation the
Route 1 Bridge may remain in the closed
position from December 2, 2010,
through April 15, 2011, for bridge
painting. Vessels that can pass under
the bridge in the closed position may do
so at any time.
The bridge has received few requests
to open during this time period during
the past three years. The waterway users
were advised of the requested bridge
closure and no objections were received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: December 2, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2010–31409 Filed 12–14–10; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00013
Fmt 4700
Sfmt 4700
Coast Guard
33 CFR Part 117
[Docket No. USCG–2010–1077]
Drawbridge Operation Regulations;
Annisquam River and Blynman Canal,
Gloucester, MA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Massachusetts Bay
Commuter Railroad Bridge at mile 0.7
across the Annisquam River and
Blynman Canal. The deviation is
necessary to facilitate emergency
structural repair. This deviation allows
the bridge to remain in the closed
position during the deviation period.
DATES: This deviation is effective for
enforcement: With actual notice from
December 1, 2010, through December
15, 2010 and with constructive notice
from December 15, 2010 through April
17, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
1077 and are available online at
https://www.regulations.gov, inserting
USCG–2010–1077 in the ‘‘Keyword’’ and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, contact
Mr. John McDonald, Project Officer,
First Coast Guard District,
john.w.mcdonald@uscg.mil, or
telephone (617) 223–8364. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Massachusetts Bay Commuter Railroad
(MBCR) bridge, across the Annisquam
River and Blynman Canal at mile 0.7, at
Gloucester, MA, has a vertical clearance
in the closed position of 16 feet at mean
high water and 25 feet at mean low
water. The drawbridge operation
regulations are listed at 33 CFR 117.586.
E:\FR\FM\15DER1.SGM
15DER1
Agencies
[Federal Register Volume 75, Number 240 (Wednesday, December 15, 2010)]
[Rules and Regulations]
[Pages 78162-78163]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-31408]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-1084]
Drawbridge Operation Regulation; Upper Mississippi River,
Clinton, IA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Clinton Railroad Drawbridge across the Upper Mississippi River, mile
518.0, at Clinton, Iowa. The deviation is necessary to allow the bridge
owner time to perform preventive maintenance that is essential to the
continued safe operation of the drawbridge. Maintenance is scheduled in
the winter and when there is less impact on navigation; instead of
scheduling work in the summer, when river traffic increases. This
deviation allows the bridge to open on signal if at least 24 hours
advance notice is given.
DATES: This deviation is effective from 12:01 a.m., December 15, 2010
to 9 a.m., March 1, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-1084 and are available online
by going to https://www.regulations.gov, inserting USCG-2010-1084 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Eric A. Washburn, Bridge Administrator, Western Rivers,
Coast Guard; telephone 314-269-2378, e-mail Eric.Washburn@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Union Pacific Railroad requested a
temporary deviation for the Clinton Railroad Drawbridge, across the
Upper Mississippi River, mile 518.0, at Clinton, Iowa to open on signal
if at least 24 hours advance notice is given for 77 days from 12:01
a.m., December 15, 2010 to 9 a.m., March 1, 2011 to allow the bridge
owner time for preventive maintenance. The Clinton Railroad Drawbridge
currently operates in accordance with 33 CFR 117.5, which states the
general requirement that drawbridges shall open promptly and fully for
the passage of vessels when a
[[Page 78163]]
request to open is given in accordance with the subpart.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
Winter conditions on the Upper Mississippi River coupled with the
closure of Army Corps of Engineer's Lock No. 20 (Mile 343.2 UMR), Lock
No. 21 (Mile 324.9 UMR) and Lock No. 22 (Mile 301.2 UMR) from January
3, 2011 to February 28, 2011 will preclude any significant navigation
demands for the drawspan opening.
The Clinton Railroad Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of 18.7 feet above normal pool.
Navigation on the waterway consists primarily of commercial tows and
recreational watercraft. The drawbridge will open if at least 24-hours
advance notice is given. This temporary deviation has been coordinated
with waterway users.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 2, 2010.
Eric A. Washburn,
Bridge Administrator.
[FR Doc. 2010-31408 Filed 12-14-10; 8:45 am]
BILLING CODE 9110-04-P