Columbia Gulf Transmission Company and Southern Natural Gas Company; Notice of Intent to Prepare an Environmental Assessment for the Proposed East Cameron Block 23A Field Line Abandonment Project and Request for Comments on Environmental Issues, 76453-76455 [2010-30757]
Download as PDF
Federal Register / Vol. 75, No. 235 / Wednesday, December 8, 2010 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 22, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–30756 Filed 12–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–9–000]
CAlifornians for Renewable Energy,
Inc., (CARE), and Barbara Durkin v.
National Grid, Cape Wind, and the
Massachusetts Department of Public
Utilities; Notice of Complaint
Kimberly D. Bose,
Secretary.
jlentini on DSKJ8SOYB1PROD with NOTICES
December 1, 2010.
Take notice that on December 1, 2010,
pursuant to the Federal Power Act, 16
U.S.C. 824d, 824e, 825e, and 825h
(2008) and Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206, (2010),
CAlifornians for Renewable Energy, Inc.
(CARE) and Barbara Durkin
(Complainants) filed a complaint against
National Grid, Cape Wind, and the
Massachusetts Department of Public
Utilities (Collectively Respondents),
alleging that the Respondents are
violating the Federal Power Act by
approving a contract for capacity and
energy that exceeds the utilities’
avoided cost cap and which also usurps
the Commission’s exclusive jurisdiction
to determine the wholesale rates for
electricity under its jurisdiction.
Any person desiring to intervene or to
protest this filing must file in
VerDate Mar<15>2010
18:23 Dec 07, 2010
Jkt 223001
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 22, 2010.
[FR Doc. 2010–30755 Filed 12–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EG10–65–000; EG10–66–000;
EG10–67–000; EG10–68–000; EG10–69–000;
EG10–70–000; EG10–71–000]
Top of the World Wind Energy, LLC;
Kit Carson Windpower, LLC; Chestnut
Flats Wind, LLC; Minco Wind, LLC;
Arizona Solar One LLC; Criterion
Power Partners, LLC; Sundevil Power
Holdings, LLC; Notice of Effectiveness
of Exempt Wholesale Generator Status
December 1, 2010.
Take notice that during the month of
November 2010, the status of the abovecaptioned entities as Exempt Wholesale
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
76453
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2010).
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–30752 Filed 12–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–14–000]
Columbia Gulf Transmission Company
and Southern Natural Gas Company;
Notice of Intent to Prepare an
Environmental Assessment for the
Proposed East Cameron Block 23A
Field Line Abandonment Project and
Request for Comments on
Environmental Issues
December 1, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the East Cameron Block 23A Field Line
Abandonment Project involving
abandonment of facilities by Columbia
Gulf Transmission Company (Columbia
Gulf) and Southern Natural Gas
Company (Southern) in Cameron Parish,
Louisiana. This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on January 3,
2011.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Columbia Gulf provided to
landowners. This fact sheet addresses a
number of typically-asked questions,
including how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (https://www.ferc.gov).
E:\FR\FM\08DEN1.SGM
08DEN1
76454
Federal Register / Vol. 75, No. 235 / Wednesday, December 8, 2010 / Notices
Summary of the Proposed Project
Columbia Gulf and Southern propose
to abandon approximately 9.3 miles of
pipeline in Cameron Parish, Louisiana.
Approximately 3.0 miles of pipeline
would be abandoned onshore, and
approximately 6.3 miles of pipeline
would be abandoned offshore.
The project would abandon:
• Approximately 6.3 miles of 16-inch
diameter pipeline (known as Segment
5823 [OCS–G04321]) and appurtenances
extending from the producer’s platform
located in East Cameron Block 23
Offshore Facilities to the shoreline;
• Approximately 3.0 miles of 16-inch
diameter pipeline onshore to a point
near the site of Meter No. 4216 where
a blind flange would be installed that
physically separates the offshore
pipeline from the remainder of the
onshore pipeline located in Cameron
Parish, Louisiana;
• Meter No. 641 (near the producer’s
platform) and appurtenances; and
• The gas transportation services
provided by Columbia Gulf and
Southern through the East Cameron
Block 23 Offshore Facilities, if any.
The general location of the project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Abandonment of the facilities would
disturb a total of about 0.37 acre
(including all necessary workspaces) at
three discrete onshore and offshore
locations:
• One 60-foot by 20-foot excavation
area within the existing pipeline rightof-way at Meter Station 4216 (29° 39′
49.50″ North Latitude, 92° 43′ 51.00″
West Longitude);
• One 60-foot by 30-foot spoil
placement area within and immediately
adjacent to the existing pipeline rightof-way at Meter Station 4216; and
• One 15-foot by 25-foot excavation
(hand-jetted) area within the existing
right-of-way at a pipeline interconnect
in State waters (29° 34′ 34.24″ North
Latitude, 92° 45′ 9.83″ West Longitude).
The EA Process
jlentini on DSKJ8SOYB1PROD with NOTICES
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
VerDate Mar<15>2010
18:23 Dec 07, 2010
Jkt 223001
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources and wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise; and
• Endangered and threatened species.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section beginning on page 4.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultations under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian Tribes, and the public
on the project’s potential effects on
historic properties.3 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project is further developed. On
natural gas facility projects, the APE at
a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before January 3,
2011.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP11–14–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. With eFiling
you can provide comments in a variety
3 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Historic properties are
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register for Historic Places.
E:\FR\FM\08DEN1.SGM
08DEN1
Federal Register / Vol. 75, No. 235 / Wednesday, December 8, 2010 / Notices
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
jlentini on DSKJ8SOYB1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
VerDate Mar<15>2010
18:23 Dec 07, 2010
Jkt 223001
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and enter
the docket number, excluding the last
three digits in the Docket Number field
(i.e., CP11–14). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–30757 Filed 12–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
76455
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 16, 2010.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[Docket No. EL11–4–000]
[FR Doc. 2010–30753 Filed 12–7–10; 8:45 am]
Coso Energy Developers; Coso
Finance Partners; Coso Power
Developers; Notice Of Filing
December 1, 2010.
Take notice that on November 18,
2010, Coso Energy Developers, Coso
Finance Partners, and Coso Power
Developers, pursuant to section 207 of
the Federal Energy Regulatory
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207 (2010), filed
a request for waiver of the
interconnection financial security (IFS)
deposit requirement set forth in section
9.3.1 of the California Independent
System Operator Corporation’s Large
Generator Interconnection Process for
Queue Requests in a Cluster Window
(Cluster LGIP).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–6–000]
Alta Wind I, LLC; Notice of Petition for
Declaratory Order
December 1, 2010.
Take notice that on November 19,
2010, Alta Wind I, LLC filed a Petition
for Declaratory Order requesting that the
Federal Energy Regulatory Commission
(Commission) disclaim jurisdiction,
under section 201 of the Federal Power
Act, over owner lessors and owner
participants associated with a sale and
leaseback transaction related to a
generation project under development.
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 75, Number 235 (Wednesday, December 8, 2010)]
[Notices]
[Pages 76453-76455]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-30757]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-14-000]
Columbia Gulf Transmission Company and Southern Natural Gas
Company; Notice of Intent to Prepare an Environmental Assessment for
the Proposed East Cameron Block 23A Field Line Abandonment Project and
Request for Comments on Environmental Issues
December 1, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the East Cameron Block 23A Field
Line Abandonment Project involving abandonment of facilities by
Columbia Gulf Transmission Company (Columbia Gulf) and Southern Natural
Gas Company (Southern) in Cameron Parish, Louisiana. This EA will be
used by the Commission in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on January 3, 2011.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this planned
project and encourage them to comment on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Columbia Gulf provided to landowners. This fact sheet
addresses a number of typically-asked questions, including how to
participate in the Commission's proceedings. It is also available for
viewing on the FERC Web site (https://www.ferc.gov).
[[Page 76454]]
Summary of the Proposed Project
Columbia Gulf and Southern propose to abandon approximately 9.3
miles of pipeline in Cameron Parish, Louisiana. Approximately 3.0 miles
of pipeline would be abandoned onshore, and approximately 6.3 miles of
pipeline would be abandoned offshore.
The project would abandon:
Approximately 6.3 miles of 16-inch diameter pipeline
(known as Segment 5823 [OCS-G04321]) and appurtenances extending from
the producer's platform located in East Cameron Block 23 Offshore
Facilities to the shoreline;
Approximately 3.0 miles of 16-inch diameter pipeline
onshore to a point near the site of Meter No. 4216 where a blind flange
would be installed that physically separates the offshore pipeline from
the remainder of the onshore pipeline located in Cameron Parish,
Louisiana;
Meter No. 641 (near the producer's platform) and
appurtenances; and
The gas transportation services provided by Columbia Gulf
and Southern through the East Cameron Block 23 Offshore Facilities, if
any.
The general location of the project facilities is shown in Appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Abandonment of the facilities would disturb a total of about 0.37
acre (including all necessary workspaces) at three discrete onshore and
offshore locations:
One 60-foot by 20-foot excavation area within the existing
pipeline right-of-way at Meter Station 4216 (29[deg] 39[min] 49.50[sec]
North Latitude, 92[deg] 43[min] 51.00[sec] West Longitude);
One 60-foot by 30-foot spoil placement area within and
immediately adjacent to the existing pipeline right-of-way at Meter
Station 4216; and
One 15-foot by 25-foot excavation (hand-jetted) area
within the existing right-of-way at a pipeline interconnect in State
waters (29[deg] 34[min] 34.24[sec] North Latitude, 92[deg] 45[min]
9.83[sec] West Longitude).
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping''. The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise; and
Endangered and threatened species.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section beginning on page 4.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Consultations under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian Tribes, and the public on the project's potential effects on
historic properties.\3\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project is
further developed. On natural gas facility projects, the APE at a
minimum encompasses all areas subject to ground disturbance (examples
include construction right-of-way, contractor/pipe storage yards,
compressor stations, and access roads). Our EA for this project will
document our findings on the impacts on historic properties and
summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\3\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Historic
properties are defined in those regulations as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register for Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before January 3,
2011.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP11-14-000) with your submission.
The Commission encourages electronic filing of comments and has expert
eFiling staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling you
can provide comments in a variety
[[Page 76455]]
of formats by attaching them as a file with your submission. New
eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making. A comment on a particular project is considered a ``Comment on
a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., CP11-14). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-30757 Filed 12-7-10; 8:45 am]