Leader One Energy, LLC; Notice of Application, 74703-74704 [2010-30154]

Download as PDF Federal Register / Vol. 75, No. 230 / Wednesday, December 1, 2010 / Notices (P–13837–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–30159 Filed 11–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232–586] Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests jlentini on DSKJ8SOYB1PROD with NOTICES November 23, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No.: 2232–586. c. Date Filed: November 15, 2010. d. Applicant: Duke Energy Carolinas, LLC. e. Name of Project: Catawba-Wateree Hydroelectric Project. f. Location: The proposed non-project use would be located on Lake Wateree in Kershaw County, South Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Kevin K. Reagan, Manager, Lake Services, P.O. Box 1006, Charlotte, NC 28201–1006; telephone (704) 382–9386. i. FERC Contact: Hillary Berlin: (202) 502–8915; e-mail: Hillary.Berlin@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: December 23, 2010. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. VerDate Mar<15>2010 20:11 Nov 30, 2010 Jkt 223001 k. Description of Request: The licensee is requesting authorization to lease 1.596 acres of project lands to Shaw Air Force Base for a commercial marina consisting of the following three areas: 0.297 acre for three courtesy docks and two boat ramps; 0.744 acre for a cluster dock with 12 docking locations; and 0.555 acre for one courtesy dock. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 74703 protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–30158 Filed 11–30–10; 8:45 am] BILLING CODE 6717–01–P FEDERAL ENERGY REGULATORY COMMISSION [Docket Nos. CP11–33–000; PF10–15–000] Leader One Energy, LLC; Notice of Application November 23, 2010 Take notice that on November 15, 2010, Leader One Energy, LLC (Leader One), 4643 South Ulster Street, Suite 1100, Denver, Colorado 80237, filed in Docket No. CP11–33–000 an application pursuant to Section 7(c) of the Natural Gas Act (NGA) seeking authorization to construct and operate the Leader One Gas Storage Project in Adams County, Colorado. Specifically, Leader One requests authorization to: (1) Convert a depleted natural gas field to storage; (2) construct a new 18,000 horsepower (hp) compressor station comprising of four 4,500 hp electric driven compressors; and (3) construct a 22.4 mile header to interconnect with Colorado Interstate Gas Company. Additionally, Leader One requests a blanket certificates pursuant to parts 157 and 284 of the commission’s regulations and authorization to provide storage and hub services at market based rates, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. This filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ E:\FR\FM\01DEN1.SGM 01DEN1 jlentini on DSKJ8SOYB1PROD with NOTICES 74704 Federal Register / Vol. 75, No. 230 / Wednesday, December 1, 2010 / Notices link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the application should be directed to Joseph S. Koury, Wright & Talisman, PC, 1200 G Street, NW., Suite 600, Washington, DC 20005, at (202) 393–1200 or koury@wrightlaw.com. On March 31, 2010, the Commission staff granted Leader One’s March 26, 2010, request to use the pre-filing process and assigned Docket No. PF10– 15–000 for this proceeding during the pre-filing review of the Leader One Gas Storage Project. Now, as of the filing of Leader One’s application on November 15, 2010, the pre-filing process for this project has ended. From this time forward, Leader One’s proceeding will be conducted in Docket No. CP11–33– 000, as noted in the caption of this Notice. Pursuant to section 157.9 of the Commission’s regulations, 18 CFR 157.9, within 90 days of this Notice, the Commission’s staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission’s staff issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to reach a final decision on a request for federal authorization within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the VerDate Mar<15>2010 20:11 Nov 30, 2010 Jkt 223001 Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. Comment Date: December 14, 2010. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Kimberly D. Bose, Secretary. [FR Doc. 2010–30154 Filed 11–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1894–203] South Carolina Electric and Gas Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests November 24, 2010. Take notice that the following hydroelectric application has been filed with the Federal Energy Regulatory Commission (Commission) and is available for public inspection: a. Application Type: Application for non-project use of project lands and waters. b. Project No.: 1894–203. c. Date Filed: October 7, 2010. d. Applicant: South Carolina Electric and Gas Company. e. Name of Project: Parr Hydroelectric Project. f. Location: The project is located on the Broad River in Fairfield and Newberry Counties, South Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: William R. Argentieri, South Carolina Electric and Gas Company, Mail Code A221, 220 Operation Way, Cayce, South Carolina 29033–3701. Tel: (803) 217–9162. i. FERC Contact: Any questions regarding this notice should be addressed to Joy Kurtz at (202) 502– 6760, or e-mail joy.kurtz@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: December 27, 2010. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘efiling’’ link. The Commission strongly encourages electronic filings (e-filing). In lieu of e-filing, all paper documents (original and eight copies) should be filed with: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 1894–203) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all interveners E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 75, Number 230 (Wednesday, December 1, 2010)]
[Notices]
[Pages 74703-74704]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-30154]


-----------------------------------------------------------------------

FEDERAL ENERGY REGULATORY COMMISSION

[Docket Nos. CP11-33-000; PF10-15-000]


Leader One Energy, LLC; Notice of Application

November 23, 2010
    Take notice that on November 15, 2010, Leader One Energy, LLC 
(Leader One), 4643 South Ulster Street, Suite 1100, Denver, Colorado 
80237, filed in Docket No. CP11-33-000 an application pursuant to 
Section 7(c) of the Natural Gas Act (NGA) seeking authorization to 
construct and operate the Leader One Gas Storage Project in Adams 
County, Colorado. Specifically, Leader One requests authorization to: 
(1) Convert a depleted natural gas field to storage; (2) construct a 
new 18,000 horsepower (hp) compressor station comprising of four 4,500 
hp electric driven compressors; and (3) construct a 22.4 mile header to 
interconnect with Colorado Interstate Gas Company. Additionally, Leader 
One requests a blanket certificates pursuant to parts 157 and 284 of 
the commission's regulations and authorization to provide storage and 
hub services at market based rates, all as more fully set forth in the 
application, which is on file with the Commission and open to public 
inspection. This filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary''

[[Page 74704]]

link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
    Any questions regarding the application should be directed to 
Joseph S. Koury, Wright & Talisman, PC, 1200 G Street, NW., Suite 600, 
Washington, DC 20005, at (202) 393-1200 or koury@wrightlaw.com.
    On March 31, 2010, the Commission staff granted Leader One's March 
26, 2010, request to use the pre-filing process and assigned Docket No. 
PF10-15-000 for this proceeding during the pre-filing review of the 
Leader One Gas Storage Project. Now, as of the filing of Leader One's 
application on November 15, 2010, the pre-filing process for this 
project has ended. From this time forward, Leader One's proceeding will 
be conducted in Docket No. CP11-33-000, as noted in the caption of this 
Notice.
    Pursuant to section 157.9 of the Commission's regulations, 18 CFR 
157.9, within 90 days of this Notice, the Commission's staff will 
either complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission's staff issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to reach a final decision on a request 
for federal authorization within 90 days of the date of issuance of the 
Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link.
    Comment Date: December 14, 2010.


Kimberly D. Bose,
Secretary.
[FR Doc. 2010-30154 Filed 11-30-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.