Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: December 9, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29846 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13869–000]
Qualified Hydro 35, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
mstockstill on DSKH9S0YB1PROD with NOTICES
November 18, 2010.
On October 15, 2010, Qualified Hydro
35, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Tionesta Dam Hydroelectric Project to
be located on Tionesta Creek near
Tionesta, in Forest County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
VerDate Mar<15>2010
17:57 Nov 26, 2010
Jkt 223001
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) Two vertical Kaplan
turbine-generators with a combined
capacity of 5 megawatts; (2) a 150-footlong steel liner with a bifurcated 75foot-long penstock leading to the
powerhouse; (3) a 40-foot by 80-foot
concrete powerhouse; (4) a new 5 MVA
substation adjacent to the powerhouse;
(5) a 9,800-foot-long transmission line;
and (6) appurtenant facilities. The
estimated annual generation of the
Tionesta Dam Hydroelectric Project
would be 22,000 megawatt-hours.
Applicant Contact: Ramya
Swaminathan, Qualified Hydro 35, LLC,
33 Commercial Street, Gloucester, MA
01930; phone: (978) 283–2822.
FERC Contact: Allyson Conner (202)
502–6082.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13869–000) in the docket number
field to access the document. For
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29842 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13763–000; Project No. 13772–
000]
FFP Missouri 13, LLC; Grays Hydro,
LLC; Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments, and
Motions To Intervene
November 19, 2010.
On May 18, 2010, FFP Missouri 13,
LLC and Grays Hydro, LLC filed
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of hydropower at
the U.S. Army Corps of Engineers
(Corps) Grays Landing Lock & Dam
located on the Monongahela River in
Greene County, Pennsylvania. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Descriptions of the proposed Grays
Landing Lock & Dam Projects:
FFP Missouri 13, LLC’s project
(Project No. 13763–000) would consist
of: (1) An excavated intake channel
slightly longer and wider than the
powerhouse; (2) a 140-foot-long, 16-footwide, 40-foot-high proposed
powerhouse containing two generating
units having a total installed capacity of
15.0 megawatts (MW); (3) an excavated
tailrace channel slightly longer and
wider than the powerhouse; (4) a
proposed 7,400-foot-long, 34.0 to 230kilovolt (kV) transmission line. The
proposed project would have an average
annual generation of 47.0 gigawatthours (GWh), which would be sold to a
local utility.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone (978)
283–2822.
Grays Hydro, LLC’s project (Project
No. 13772–000) would consist of: (1) A
proposed 230-foot-long excavated power
canal; (2) a proposed powerhouse
E:\FR\FM\29NON1.SGM
29NON1
73067
Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices
containing three generating units having
a total installed capacity of 12.0 MW; (3)
a 450-foot-long excavated tailrace;
(4) a proposed 0.9-mile-long, 25.0-kV
transmission line. The proposed project
would have an average annual
generation of 52.6 GWh, which would
be sold to a local utility.
Applicant Contact: Mr. Brent Smith,
Symbiotics LLC, P.O. Box 535, Rigby, ID
83442; phone (208) 745–0834.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13763–000, or 13772–000) in the
docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29857 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13746–000; Project No. 13750–
000; Project No. 13776–000; Project No.
13782–000]
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments, and
Motions To Intervene
Lock + Hydro Friends Fund XL ...................................................................................................................................
FFP Missouri 4, LLC ......................................................................................................................................................
Allegheny 4 Hydro, LLC ...............................................................................................................................................
Three Rivers Hydro, LLC ..............................................................................................................................................
mstockstill on DSKH9S0YB1PROD with NOTICES
November 19, 2010.
On May 18, 2010, Lock+ Hydro
Friends Fund XL, FFP Missouri 4, LLC,
Allegheny 4 Hydro, LLC, and Three
Rivers Hydro LLC filed applications,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of hydropower at the U.S.
Army Corps of Engineers (Corps)
Allegheny River Lock and Dam No. 4
located on the Allegheny River in
Allegheny County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Descriptions of the proposed
Allegheny River Lock and Dam No. 4
Projects:
Lock+ Hydro Friends Fund XL project
(Project No. 13746–000) would consist
of: (1) Two 34-foot-high, 75-foot-long
prefabricated concrete walls attached to
the downstream side of the Corps dam
which would support one frame
modules; (2) each frame module would
be 109 feet long and weigh 1.16 million
pounds and contain 10 generating units
with a total combined capacity of 10.0
megawatts (MW); (3) a new switchyard
containing a transformer; and (4) a
proposed 400-foot-long, 69-kilovolt (kV)
VerDate Mar<15>2010
21:56 Nov 26, 2010
Jkt 223001
transmission line connecting to an
existing substation. The proposed
project would have an average annual
generation of 43.83 gigawatt-hours
(GWh), which would be sold to a local
utility.
Applicant Contact: Mr. Mark R.
Stover, Hydro Green Energy LLC, 5090
Richmond Avenue #390, Houston, TX
77056; phone (877) 556–6566 x711.
FFP Missouri 4, LLC’s project (Project
No. 13750–000) would consist of: (1) An
excavated intake channel slightly longer
and wider than the powerhouse; (2) a
125-foot-long, 160-foot-wide, 60-foothigh proposed powerhouse containing
three generating units having a total
installed capacity of 15.0 MW; (3) an
excavated tailrace channel slightly
longer and wider than the powerhouse;
and (4) a proposed 500-foot-long,
ranging from 34.0 to 230-kilovolt (kV)
transmission line. The proposed project
would have an average annual
generation of 89.0 GWh, which would
be sold to a local utility.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone (978)
283–2822.
Allegheny 4 Hydro, LLC’s project
(Project No. 13776–000) would consist
of: (1) A proposed 165-foot-long
excavated power canal; (2) a proposed
powerhouse containing three generating
units having a total installed capacity of
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Project
Project
Project
Project
No.
No.
No.
No.
13746–000.
13750–000.
13776–000.
13782–000.
15.9 MW; (3) a 135-foot-long excavated
tailrace; and (4) a proposed 0.3-milelong, 69.0-kV transmission line. The
proposed project would have an average
annual generation of 62.6 GWh, which
would be sold to a local utility.
Applicant Contact: Mr. Brent Smith,
Symbiotics, LLC., P.O. Box 535, Rigby,
ID 83442; phone (208) 745–0834.
Three Rivers Hydro, LLC’s project
(Project No. 13782–000) would consist
of: (1) A proposed 85-foot-long
excavated power canal; (2) a 125-footlong, 160-foot-wide, 60-foot-high
proposed powerhouse containing three
generating units having a total installed
capacity of 15.0 MW; (3) a 95-foot-long
excavated tailrace; and (4) a proposed
500-foot-long, 138-kV transmission line.
The proposed project would have an
average annual generation of 89.0 GWh,
which would be sold to a local utility.
Applicant Contact: Mr. Joseph Watt,
Esq., Three Rivers Hydro, LLC, 316
South Clinton Street, Suite 4, Syracuse,
NY 13202; phone (315) 477–9914.
FERC Contact: Tim Looney (202) 502–
6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 75, Number 228 (Monday, November 29, 2010)]
[Notices]
[Pages 73066-73067]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29857]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13763-000; Project No. 13772-000]
FFP Missouri 13, LLC; Grays Hydro, LLC; Notice of Competing
Preliminary Permit Applications Accepted for Filing and Soliciting
Comments, and Motions To Intervene
November 19, 2010.
On May 18, 2010, FFP Missouri 13, LLC and Grays Hydro, LLC filed
applications, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of hydropower at the U.S. Army Corps
of Engineers (Corps) Grays Landing Lock & Dam located on the
Monongahela River in Greene County, Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
Descriptions of the proposed Grays Landing Lock & Dam Projects:
FFP Missouri 13, LLC's project (Project No. 13763-000) would
consist of: (1) An excavated intake channel slightly longer and wider
than the powerhouse; (2) a 140-foot-long, 16-foot-wide, 40-foot-high
proposed powerhouse containing two generating units having a total
installed capacity of 15.0 megawatts (MW); (3) an excavated tailrace
channel slightly longer and wider than the powerhouse; (4) a proposed
7,400-foot-long, 34.0 to 230-kilovolt (kV) transmission line. The
proposed project would have an average annual generation of 47.0
gigawatt-hours (GWh), which would be sold to a local utility.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power
Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978)
283-2822.
Grays Hydro, LLC's project (Project No. 13772-000) would consist
of: (1) A proposed 230-foot-long excavated power canal; (2) a proposed
powerhouse
[[Page 73067]]
containing three generating units having a total installed capacity of
12.0 MW; (3) a 450-foot-long excavated tailrace; (4) a proposed 0.9-
mile-long, 25.0-kV transmission line. The proposed project would have
an average annual generation of 52.6 GWh, which would be sold to a
local utility.
Applicant Contact: Mr. Brent Smith, Symbiotics LLC, P.O. Box 535,
Rigby, ID 83442; phone (208) 745-0834.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 Days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13763-000, or 13772-000) in the docket
number field to access the document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.