FFP Missouri 13, LLC; Grays Hydro, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene, 73066-73067 [2010-29857]

Download as PDF 73066 Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: December 9, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–29846 Filed 11–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13869–000] Qualified Hydro 35, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications mstockstill on DSKH9S0YB1PROD with NOTICES November 18, 2010. On October 15, 2010, Qualified Hydro 35, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Tionesta Dam Hydroelectric Project to be located on Tionesta Creek near Tionesta, in Forest County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or VerDate Mar<15>2010 17:57 Nov 26, 2010 Jkt 223001 otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) Two vertical Kaplan turbine-generators with a combined capacity of 5 megawatts; (2) a 150-footlong steel liner with a bifurcated 75foot-long penstock leading to the powerhouse; (3) a 40-foot by 80-foot concrete powerhouse; (4) a new 5 MVA substation adjacent to the powerhouse; (5) a 9,800-foot-long transmission line; and (6) appurtenant facilities. The estimated annual generation of the Tionesta Dam Hydroelectric Project would be 22,000 megawatt-hours. Applicant Contact: Ramya Swaminathan, Qualified Hydro 35, LLC, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 283–2822. FERC Contact: Allyson Conner (202) 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13869–000) in the docket number field to access the document. For PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–29842 Filed 11–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13763–000; Project No. 13772– 000] FFP Missouri 13, LLC; Grays Hydro, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene November 19, 2010. On May 18, 2010, FFP Missouri 13, LLC and Grays Hydro, LLC filed applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower at the U.S. Army Corps of Engineers (Corps) Grays Landing Lock & Dam located on the Monongahela River in Greene County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. Descriptions of the proposed Grays Landing Lock & Dam Projects: FFP Missouri 13, LLC’s project (Project No. 13763–000) would consist of: (1) An excavated intake channel slightly longer and wider than the powerhouse; (2) a 140-foot-long, 16-footwide, 40-foot-high proposed powerhouse containing two generating units having a total installed capacity of 15.0 megawatts (MW); (3) an excavated tailrace channel slightly longer and wider than the powerhouse; (4) a proposed 7,400-foot-long, 34.0 to 230kilovolt (kV) transmission line. The proposed project would have an average annual generation of 47.0 gigawatthours (GWh), which would be sold to a local utility. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978) 283–2822. Grays Hydro, LLC’s project (Project No. 13772–000) would consist of: (1) A proposed 230-foot-long excavated power canal; (2) a proposed powerhouse E:\FR\FM\29NON1.SGM 29NON1 73067 Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices containing three generating units having a total installed capacity of 12.0 MW; (3) a 450-foot-long excavated tailrace; (4) a proposed 0.9-mile-long, 25.0-kV transmission line. The proposed project would have an average annual generation of 52.6 GWh, which would be sold to a local utility. Applicant Contact: Mr. Brent Smith, Symbiotics LLC, P.O. Box 535, Rigby, ID 83442; phone (208) 745–0834. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 Days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13763–000, or 13772–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–29857 Filed 11–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746–000; Project No. 13750– 000; Project No. 13776–000; Project No. 13782–000] Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene Lock + Hydro Friends Fund XL ................................................................................................................................... FFP Missouri 4, LLC ...................................................................................................................................................... Allegheny 4 Hydro, LLC ............................................................................................................................................... Three Rivers Hydro, LLC .............................................................................................................................................. mstockstill on DSKH9S0YB1PROD with NOTICES November 19, 2010. On May 18, 2010, Lock+ Hydro Friends Fund XL, FFP Missouri 4, LLC, Allegheny 4 Hydro, LLC, and Three Rivers Hydro LLC filed applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower at the U.S. Army Corps of Engineers (Corps) Allegheny River Lock and Dam No. 4 located on the Allegheny River in Allegheny County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. Descriptions of the proposed Allegheny River Lock and Dam No. 4 Projects: Lock+ Hydro Friends Fund XL project (Project No. 13746–000) would consist of: (1) Two 34-foot-high, 75-foot-long prefabricated concrete walls attached to the downstream side of the Corps dam which would support one frame modules; (2) each frame module would be 109 feet long and weigh 1.16 million pounds and contain 10 generating units with a total combined capacity of 10.0 megawatts (MW); (3) a new switchyard containing a transformer; and (4) a proposed 400-foot-long, 69-kilovolt (kV) VerDate Mar<15>2010 21:56 Nov 26, 2010 Jkt 223001 transmission line connecting to an existing substation. The proposed project would have an average annual generation of 43.83 gigawatt-hours (GWh), which would be sold to a local utility. Applicant Contact: Mr. Mark R. Stover, Hydro Green Energy LLC, 5090 Richmond Avenue #390, Houston, TX 77056; phone (877) 556–6566 x711. FFP Missouri 4, LLC’s project (Project No. 13750–000) would consist of: (1) An excavated intake channel slightly longer and wider than the powerhouse; (2) a 125-foot-long, 160-foot-wide, 60-foothigh proposed powerhouse containing three generating units having a total installed capacity of 15.0 MW; (3) an excavated tailrace channel slightly longer and wider than the powerhouse; and (4) a proposed 500-foot-long, ranging from 34.0 to 230-kilovolt (kV) transmission line. The proposed project would have an average annual generation of 89.0 GWh, which would be sold to a local utility. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978) 283–2822. Allegheny 4 Hydro, LLC’s project (Project No. 13776–000) would consist of: (1) A proposed 165-foot-long excavated power canal; (2) a proposed powerhouse containing three generating units having a total installed capacity of PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Project Project Project Project No. No. No. No. 13746–000. 13750–000. 13776–000. 13782–000. 15.9 MW; (3) a 135-foot-long excavated tailrace; and (4) a proposed 0.3-milelong, 69.0-kV transmission line. The proposed project would have an average annual generation of 62.6 GWh, which would be sold to a local utility. Applicant Contact: Mr. Brent Smith, Symbiotics, LLC., P.O. Box 535, Rigby, ID 83442; phone (208) 745–0834. Three Rivers Hydro, LLC’s project (Project No. 13782–000) would consist of: (1) A proposed 85-foot-long excavated power canal; (2) a 125-footlong, 160-foot-wide, 60-foot-high proposed powerhouse containing three generating units having a total installed capacity of 15.0 MW; (3) a 95-foot-long excavated tailrace; and (4) a proposed 500-foot-long, 138-kV transmission line. The proposed project would have an average annual generation of 89.0 GWh, which would be sold to a local utility. Applicant Contact: Mr. Joseph Watt, Esq., Three Rivers Hydro, LLC, 316 South Clinton Street, Suite 4, Syracuse, NY 13202; phone (315) 477–9914. FERC Contact: Tim Looney (202) 502– 6096. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 75, Number 228 (Monday, November 29, 2010)]
[Notices]
[Pages 73066-73067]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29857]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13763-000; Project No. 13772-000]


FFP Missouri 13, LLC; Grays Hydro, LLC; Notice of Competing 
Preliminary Permit Applications Accepted for Filing and Soliciting 
Comments, and Motions To Intervene

November 19, 2010.
    On May 18, 2010, FFP Missouri 13, LLC and Grays Hydro, LLC filed 
applications, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of hydropower at the U.S. Army Corps 
of Engineers (Corps) Grays Landing Lock & Dam located on the 
Monongahela River in Greene County, Pennsylvania. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    Descriptions of the proposed Grays Landing Lock & Dam Projects:
    FFP Missouri 13, LLC's project (Project No. 13763-000) would 
consist of: (1) An excavated intake channel slightly longer and wider 
than the powerhouse; (2) a 140-foot-long, 16-foot-wide, 40-foot-high 
proposed powerhouse containing two generating units having a total 
installed capacity of 15.0 megawatts (MW); (3) an excavated tailrace 
channel slightly longer and wider than the powerhouse; (4) a proposed 
7,400-foot-long, 34.0 to 230-kilovolt (kV) transmission line. The 
proposed project would have an average annual generation of 47.0 
gigawatt-hours (GWh), which would be sold to a local utility.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power 
Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978) 
283-2822.
    Grays Hydro, LLC's project (Project No. 13772-000) would consist 
of: (1) A proposed 230-foot-long excavated power canal; (2) a proposed 
powerhouse

[[Page 73067]]

containing three generating units having a total installed capacity of 
12.0 MW; (3) a 450-foot-long excavated tailrace; (4) a proposed 0.9-
mile-long, 25.0-kV transmission line. The proposed project would have 
an average annual generation of 52.6 GWh, which would be sold to a 
local utility.
    Applicant Contact: Mr. Brent Smith, Symbiotics LLC, P.O. Box 535, 
Rigby, ID 83442; phone (208) 745-0834.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 Days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13763-000, or 13772-000) in the docket 
number field to access the document. For assistance, contact FERC 
Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29857 Filed 11-26-10; 8:45 am]
BILLING CODE 6717-01-P