Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene, 73063-73064 [2010-29856]
Download as PDF
Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices
The proposed project will consist of
the following: (1) The existing 675-footlong, 235-foot-high earth and rockfill
Howard A. Hanson dam; (2) the existing
Howard A. Hanson reservoir, which has
a maximum usable storage of 106,000
acre-feet between elevation 1,206 feet
above mean sea level (msl) and
elevation 1,035 feet msl; (3) an 800-footlong steel liner, placed within the
existing outlet tunnel, bifurcated above
the existing discharge outlet; (4) a 200foot-long, 10-foot-diameter steel
penstock leading from the right branch
of the bifurcation to the powerhouse; (5)
a 40-foot-long, 80-foot-wide reinforced
concrete powerhouse containing one 2megawatt (MW) and one 3-MW Francistype turbine; (6) a substation adjacent to
the powerhouse; (7) a 1,000-foot-long,
69-kilovolt (kV) transmission line that
will interconnect with the local utility;
and (8) appurtenant facilities. The
estimated annual generation of the
Howard A. Hanson project would be 14
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Qualified Hydro 27, LLC,
33 Commercial Street, Gloucester, MA
01930; phone: (978) 283–2822.
FERC Contact: Kelly Wolcott, (202)
502–6480.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13848–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29858 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13762–000; Project No. 13773–
000; Project No. 13784–000]
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments, and
Motions To Intervene
November 19, 2010.
FFP Missouri 15, LLC ....................................................................................................................................................
Morgantown Hydro, LLC ...............................................................................................................................................
Three Rivers Hydro, LLC ..............................................................................................................................................
On May 18, 2010, FFP Missouri 15,
LLC, Morgantown Hydro, LLC, and
Three Rivers Hydro LLC filed
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of hydropower at
the U.S. Army Corps of Engineers
Morgantown Lock & Dam located on the
Monongahela River in Monongahela
County, West Virginia. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
mstockstill on DSKH9S0YB1PROD with NOTICES
Descriptions of the Proposed
Morgantown Lock & Dam Projects
FFP Missouri 15, LLC’s project
(Project No. 13762–000) would consist
of: (1) An excavated intake channel
slightly longer and wider than the
powerhouse; (2) a 60-foot-long, 110-footwide, 40-foot-high proposed
powerhouse containing two generating
units having a total installed capacity of
9.0 megawatts (MW); (3) an excavated
tailrace channel slightly longer and
VerDate Mar<15>2010
17:57 Nov 26, 2010
Jkt 223001
wider than the powerhouse; and (4) a
proposed 13-mile-long, ranging from
34.0 to 230-kilovolt (kV) transmission
line. The proposed project would have
an average annual generation of 26.0
gigawatt-hours (GWh), which would be
sold to a local utility.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone (978)
283–2822.
Morgantown Hydro LLC’s project
(Project No. 13773–000) would consist
of: (1) A proposed 80-foot-long
excavated power canal; (2) a proposed
powerhouse containing two generating
units having a total installed capacity of
7.2 MW; (3) a 120-foot-long excavated
tailrace; and (4) a proposed 0.3-milelong, 69.0-kV transmission line. The
proposed project would have an average
annual generation of 26.2 GWh, which
would be sold to a local utility.
Applicant Contact: Mr. Brent Smith,
Symbiotics, LLC., P.O. Box 535, Rigby,
ID 83442; phone (208) 745–0834.
Three Rivers Hydro, LLC’s project
(Project No. 13784–000) would consist
of: (1) A proposed 85-foot-long
excavated power canal; (2) a 45-footlong, 110-foot-wide, 40-foot-high
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
73063
Project No. 13762–000.
Project No. 13773–000.
Project No. 13784–000.
proposed powerhouse containing two
generating units having a total installed
capacity of 3.7 MW; (3) a 95-foot-long
excavated tailrace; and (4) a proposed
1,100-foot-long, ranging from 34 to 230kV transmission line. The proposed
project would have an average annual
generation of 20.0 GWh, which would
be sold to a local utility.
Applicant Contact: Mr. Joseph Watt,
Esq., Three Rivers Hydro, LLC, 316
South Clinton Street, Suite 4, Syracuse,
NY 13202; phone (315) 477–9914.
FERC Contact: Tim Looney (202) 502–
6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
E:\FR\FM\29NON1.SGM
29NON1
73064
Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13762–000, 13773–000, or 13784–
000) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29856 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13736–000; Project No. 13777–
000]
Lock Hydro Friends Fund XLI;
Allegheny 7 Hydro, LLC; Notice of
Competing Preliminary Permit
Applications Accepted for Filing and
Soliciting Comments, and Motions To
Intervene
November 19, 2010.
mstockstill on DSKH9S0YB1PROD with NOTICES
On May 18, 2010, Lock Hydro Friends
Fund XLI, and Allegheny 7 Hydro, LLC
filed applications, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of hydropower at
the U.S. Army Corps of Engineers
(Corps) Allegheny River Lock & Dam
No. 7 located on the Allegheny River in
Armstrong County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Descriptions of the Proposed Allegheny
River Lock & Dam No. 7 Projects
Lock Hydro Friends Fund XLI’s
project (Project No. 13736–000) would
consist of: (1) Two 24-foot-high, 75-footlong prefabricated concrete walls
attached to the downstream side of the
Corps dam which would support one
frame module; (2) the frame module
would be 109 feet long and weigh 1.16
million pounds and contain 10
generating units with a total combined
capacity of 12.5 megawatts (MW); (3) a
new switchyard containing a
transformer; (4) a proposed 6,000-footlong, 36.7-kilovolt (kV) transmission
line to an existing substation. The
proposed project would have an average
annual generation of 54.787 gigawatthours (GWh), which would be sold to a
local utility.
Applicant Contact: Mr. Mark R.
Stover, Hydro Green Energy LLC, 5090
Richmond Avenue #390, Houston, TX
77056; phone (877) 556–6566 x711.
Allegheny 7 Hydro, LLC’s project
(Project No. 13777–000) would consist
of: (1) A proposed 100-foot-long
excavated power canal; (2) a proposed
powerhouse containing three generating
units having a total installed capacity of
13.3 MW; (3) a 260-foot-long excavated
tailrace; (4) a proposed 2.1-mile-long,
69.0–kV transmission line. The
proposed project would have an average
annual generation of 49.7 GWh, which
would be sold to a local utility.
Applicant Contact: Mr. Brent Smith,
Symbiotics LLC, P.O. Box 535, Rigby, ID
83442; phone (208) 745–0834.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13736–000 or 13777–000) in the
docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29852 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13740–000; Project No. 13749–
000; Project No. 13775–000; Project No.
13781–000]
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments, and
Motions To Intervene
November 19, 2010.
Lock+ Hydro Friends Fund XXXIX ..............................................................................................................................
FFP Missouri 3, LLC ......................................................................................................................................................
Allegheny 3 Hydro, LLC ...............................................................................................................................................
Three Rivers Hydro, LLC ..............................................................................................................................................
On May 18, 2010, Lock+ Hydro
Friends Fund XXXIX, FFP Missouri 3,
LLC, Allegheny 3 Hydro, LLC, and
Three Rivers Hydro LLC filed
applications, pursuant to section 4(f) of
VerDate Mar<15>2010
21:59 Nov 26, 2010
Jkt 223001
the Federal Power Act, proposing to
study the feasibility of hydropower at
the U.S. Army Corps of Engineers
(Corps) C.W. Bill Young Lock and Dam
located on the Allegheny River in
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Project
Project
Project
Project
No.
No.
No.
No.
13740–000
13749–000
13775–000
13781–000
Allegheny County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 75, Number 228 (Monday, November 29, 2010)]
[Notices]
[Pages 73063-73064]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29856]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13762-000; Project No. 13773-000; Project No. 13784-000]
Notice of Competing Preliminary Permit Applications Accepted for
Filing and Soliciting Comments, and Motions To Intervene
November 19, 2010.
FFP Missouri 15, LLC............. Project No. 13762-000.
Morgantown Hydro, LLC............ Project No. 13773-000.
Three Rivers Hydro, LLC.......... Project No. 13784-000.
On May 18, 2010, FFP Missouri 15, LLC, Morgantown Hydro, LLC, and
Three Rivers Hydro LLC filed applications, pursuant to section 4(f) of
the Federal Power Act, proposing to study the feasibility of hydropower
at the U.S. Army Corps of Engineers Morgantown Lock & Dam located on
the Monongahela River in Monongahela County, West Virginia. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
Descriptions of the Proposed Morgantown Lock & Dam Projects
FFP Missouri 15, LLC's project (Project No. 13762-000) would
consist of: (1) An excavated intake channel slightly longer and wider
than the powerhouse; (2) a 60-foot-long, 110-foot-wide, 40-foot-high
proposed powerhouse containing two generating units having a total
installed capacity of 9.0 megawatts (MW); (3) an excavated tailrace
channel slightly longer and wider than the powerhouse; and (4) a
proposed 13-mile-long, ranging from 34.0 to 230-kilovolt (kV)
transmission line. The proposed project would have an average annual
generation of 26.0 gigawatt-hours (GWh), which would be sold to a local
utility.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power
Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978)
283-2822.
Morgantown Hydro LLC's project (Project No. 13773-000) would
consist of: (1) A proposed 80-foot-long excavated power canal; (2) a
proposed powerhouse containing two generating units having a total
installed capacity of 7.2 MW; (3) a 120-foot-long excavated tailrace;
and (4) a proposed 0.3-mile-long, 69.0-kV transmission line. The
proposed project would have an average annual generation of 26.2 GWh,
which would be sold to a local utility.
Applicant Contact: Mr. Brent Smith, Symbiotics, LLC., P.O. Box 535,
Rigby, ID 83442; phone (208) 745-0834.
Three Rivers Hydro, LLC's project (Project No. 13784-000) would
consist of: (1) A proposed 85-foot-long excavated power canal; (2) a
45-foot-long, 110-foot-wide, 40-foot-high proposed powerhouse
containing two generating units having a total installed capacity of
3.7 MW; (3) a 95-foot-long excavated tailrace; and (4) a proposed
1,100-foot-long, ranging from 34 to 230-kV transmission line. The
proposed project would have an average annual generation of 20.0 GWh,
which would be sold to a local utility.
Applicant Contact: Mr. Joseph Watt, Esq., Three Rivers Hydro, LLC,
316 South Clinton Street, Suite 4, Syracuse, NY 13202; phone (315) 477-
9914.
FERC Contact: Tim Looney (202) 502-6096.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the
[[Page 73064]]
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and seven copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13762-000, 13773-000, or 13784-000) in the
docket number field to access the document. For assistance, contact
FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29856 Filed 11-26-10; 8:45 am]