NortHydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 73069 [2010-29841]
Download as PDF
Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices
free at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13745–000, 13758–000, 13767–000,
or 13788–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29854 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13855–000]
NortHydro, LLC; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
November 18, 2010.
On October 1, 2010, and
supplemented on November 16, 2010,
NortHydro, LLC filed an application for
a preliminary permit pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Boulder Creek Water Power Project
(Boulder Creek project) to be located on
Boulder Creek in the vicinity of
Bonner’s Ferry, Idaho and Troy,
Montana in Boundary County, Idaho
and Lincoln County, Montana. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project will consist of
the following: (1) A 6-foot-high, 75-footlong reinforced concrete diversion and
inlet structure on Boulder Creek; (2) an
impoundment of less than 1 acre-foot;
(3) an 8,500-foot-long, 4.5-foot-diameter
pressurized HDPE penstock from the
intake structure to the powerhouse; (4)
a powerhouse containing one or more
turbines with a total installed capacity
of 4.3 megawatts; (5) a concrete or riprap-lined tailrace channel to return
flows from the powerhouse to Boulder
Creek; (6) an approximately 5-mile-long,
115 kV transmission line which will tie
into an undetermined interconnection;
and (7) appurtenant facilities. The
estimated annual generation of the
Boulder Creek project would be 15.75
gigawatt-hours.
Applicant Contact: Darius Ruen,
NortHydro, LLC, 3201 Huetter Rd Suite
102, Coeur d’Alene, ID 83814; phone:
(208) 292–0820.
FERC Contact: Ryan Hansen (202)
502–8074.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site http:
//www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13855–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29841 Filed 11–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR10–97–001; Docket No.
PR10–101–001; Docket No. PR10–125–001;
Docket No. PR10–83–001]
Enstor Grama Ridge Storage and
Transportation, LLC, Enstor Katy
Storage and Transportation, LP, et al.;
Notice of Baseline Filings
November 18, 2010.
mstockstill on DSKH9S0YB1PROD with NOTICES
Enstor Grama Ridge Storage and Transportation, LLC ....................................................................................
Enstor Katy Storage and Transportation, LP .....................................................................................................
NorthWestern Corporation .................................................................................................................................
New York State Electric & Gas Corporation .....................................................................................................
Take notice that on November 10,
2010, November 12, 2010, and
November 17, 2010, the applicants
listed above submitted a revised
baseline filing of their Statement of
Operating Conditions for services
provided under Section 311 of the
Natural Gas Policy Act of 1978
(‘‘NGPA’’).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
VerDate Mar<15>2010
21:56 Nov 26, 2010
Jkt 223001
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
73069
Docket No. PR10–97–001.
Docket No. PR10–101–001.
Docket No. PR10–125–001.
Docket No. PR10–83–001.
Not Consolidated.
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 75, Number 228 (Monday, November 29, 2010)]
[Notices]
[Page 73069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29841]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13855-000]
NortHydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
November 18, 2010.
On October 1, 2010, and supplemented on November 16, 2010,
NortHydro, LLC filed an application for a preliminary permit pursuant
to section 4(f) of the Federal Power Act (FPA), proposing to study the
feasibility of the Boulder Creek Water Power Project (Boulder Creek
project) to be located on Boulder Creek in the vicinity of Bonner's
Ferry, Idaho and Troy, Montana in Boundary County, Idaho and Lincoln
County, Montana. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project will consist of the following: (1) A 6-foot-
high, 75-foot-long reinforced concrete diversion and inlet structure on
Boulder Creek; (2) an impoundment of less than 1 acre-foot; (3) an
8,500-foot-long, 4.5-foot-diameter pressurized HDPE penstock from the
intake structure to the powerhouse; (4) a powerhouse containing one or
more turbines with a total installed capacity of 4.3 megawatts; (5) a
concrete or rip-rap-lined tailrace channel to return flows from the
powerhouse to Boulder Creek; (6) an approximately 5-mile-long, 115 kV
transmission line which will tie into an undetermined interconnection;
and (7) appurtenant facilities. The estimated annual generation of the
Boulder Creek project would be 15.75 gigawatt-hours.
Applicant Contact: Darius Ruen, NortHydro, LLC, 3201 Huetter Rd
Suite 102, Coeur d'Alene, ID 83814; phone: (208) 292-0820.
FERC Contact: Ryan Hansen (202) 502-8074.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http: //www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13855-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29841 Filed 11-26-10; 8:45 am]