Download as PDF Federal Register / Vol. 75, No. 228 / Monday, November 29, 2010 / Notices free at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13745–000, 13758–000, 13767–000, or 13788–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–29854 Filed 11–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13855–000] NortHydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 18, 2010. On October 1, 2010, and supplemented on November 16, 2010, NortHydro, LLC filed an application for a preliminary permit pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Boulder Creek Water Power Project (Boulder Creek project) to be located on Boulder Creek in the vicinity of Bonner’s Ferry, Idaho and Troy, Montana in Boundary County, Idaho and Lincoln County, Montana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project will consist of the following: (1) A 6-foot-high, 75-footlong reinforced concrete diversion and inlet structure on Boulder Creek; (2) an impoundment of less than 1 acre-foot; (3) an 8,500-foot-long, 4.5-foot-diameter pressurized HDPE penstock from the intake structure to the powerhouse; (4) a powerhouse containing one or more turbines with a total installed capacity of 4.3 megawatts; (5) a concrete or riprap-lined tailrace channel to return flows from the powerhouse to Boulder Creek; (6) an approximately 5-mile-long, 115 kV transmission line which will tie into an undetermined interconnection; and (7) appurtenant facilities. The estimated annual generation of the Boulder Creek project would be 15.75 gigawatt-hours. Applicant Contact: Darius Ruen, NortHydro, LLC, 3201 Huetter Rd Suite 102, Coeur d’Alene, ID 83814; phone: (208) 292–0820. FERC Contact: Ryan Hansen (202) 502–8074. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site http: //www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13855–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–29841 Filed 11–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10–97–001; Docket No. PR10–101–001; Docket No. PR10–125–001; Docket No. PR10–83–001] Enstor Grama Ridge Storage and Transportation, LLC, Enstor Katy Storage and Transportation, LP, et al.; Notice of Baseline Filings November 18, 2010. mstockstill on DSKH9S0YB1PROD with NOTICES Enstor Grama Ridge Storage and Transportation, LLC .................................................................................... Enstor Katy Storage and Transportation, LP ..................................................................................................... NorthWestern Corporation ................................................................................................................................. New York State Electric & Gas Corporation ..................................................................................................... Take notice that on November 10, 2010, November 12, 2010, and November 17, 2010, the applicants listed above submitted a revised baseline filing of their Statement of Operating Conditions for services provided under Section 311 of the Natural Gas Policy Act of 1978 (‘‘NGPA’’). Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must VerDate Mar<15>2010 21:56 Nov 26, 2010 Jkt 223001 file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 73069 Docket No. PR10–97–001. Docket No. PR10–101–001. Docket No. PR10–125–001. Docket No. PR10–83–001. Not Consolidated. be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 75, Number 228 (Monday, November 29, 2010)]
[Notices]
[Page 73069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29841]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Project No. 13855-000]


 NortHydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

November 18, 2010.
    On October 1, 2010, and supplemented on November 16, 2010, 
NortHydro, LLC filed an application for a preliminary permit pursuant 
to section 4(f) of the Federal Power Act (FPA), proposing to study the 
feasibility of the Boulder Creek Water Power Project (Boulder Creek 
project) to be located on Boulder Creek in the vicinity of Bonner's 
Ferry, Idaho and Troy, Montana in Boundary County, Idaho and Lincoln 
County, Montana. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project will consist of the following: (1) A 6-foot-
high, 75-foot-long reinforced concrete diversion and inlet structure on 
Boulder Creek; (2) an impoundment of less than 1 acre-foot; (3) an 
8,500-foot-long, 4.5-foot-diameter pressurized HDPE penstock from the 
intake structure to the powerhouse; (4) a powerhouse containing one or 
more turbines with a total installed capacity of 4.3 megawatts; (5) a 
concrete or rip-rap-lined tailrace channel to return flows from the 
powerhouse to Boulder Creek; (6) an approximately 5-mile-long, 115 kV 
transmission line which will tie into an undetermined interconnection; 
and (7) appurtenant facilities. The estimated annual generation of the 
Boulder Creek project would be 15.75 gigawatt-hours.
    Applicant Contact: Darius Ruen, NortHydro, LLC, 3201 Huetter Rd 
Suite 102, Coeur d'Alene, ID 83814; phone: (208) 292-0820.
    FERC Contact: Ryan Hansen (202) 502-8074.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http: //www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13855-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29841 Filed 11-26-10; 8:45 am]
BILLING CODE 6717-01-P