Domtar Paper Company, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 71427 [2010-29436]

Download as PDF Federal Register / Vol. 75, No. 225 / Tuesday, November 23, 2010 / Notices docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11–2020–000] Kimberly D. Bose, Secretary. Domtar Paper Company, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2010–29436 Filed 11–22–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY mstockstill on DSKH9S0YB1PROD with NOTICES November 16, 2010. This is a supplemental notice in the above-referenced proceeding, of Domtar Paper Company, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is December 6, 2010. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed VerDate Mar<15>2010 18:02 Nov 22, 2010 Jkt 223001 Federal Energy Regulatory Commission [Project No.13866–000] Clean River Power 12, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 16, 2010. On October 15, 2010, Clean River Power 12, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Ruth Creek Hydroelectric Project (Ruth Creek project) to be located on Ruth Creek in the vicinity of Glacier, in Whatcom County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project will consist of the following: (1) A 100-foot-long, 8foot-high, reinforced concrete diversion weir on Ruth Creek; (2) a 45-foot-long, 15-foot-wide, 12-foot-high reinforced concrete intake structure adjacent to the weir with a trash rack, fish screen, and closure gate; (3) a 0.1-acre impoundment created by the diversion weir; (4) an 8,000-foot-long, 3.5-footdiameter steel penstock from the intake structure to the powerhouse; (5) a 60foot-long, 40-foot-wide reinforced concrete powerhouse containing one horizontal impulse turbine with a capacity of 2.5 megawatts (MW); (6) a 40-foot-long, concrete and rip rap-lined tailrace channel to return flows from the powerhouse to Ruth Creek; (7) a 4.16/55 kilovolt (kV) three stage step up transformer; (8) an approximately 2.2mile-long, 55-kV transmission line which will tie into an undetermined interconnection; and (9) appurtenant facilities. The estimated annual PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 71427 generation of the Ruth Creek project would be 10.0 gigawatt-hours. Applicant Contact: Ramya Swaminthan, Clean River Power 12, LLC, 33 Commercial St., Gloucester, MA 01930; phone: (978) 283–2822. FERC Contact: Ryan Hansen, (202) 502–8074. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/elibrary. asp. Enter the docket number (P–13866– 000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–29442 Filed 11–22–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13867–000] Clean River Power 11, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 16, 2010. On October 15, 2010, Clean River Power 11, LLC filed an application for E:\FR\FM\23NON1.SGM 23NON1

Agencies

[Federal Register Volume 75, Number 225 (Tuesday, November 23, 2010)]
[Notices]
[Page 71427]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29436]



[[Page 71427]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER11-2020-000]


Domtar Paper Company, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

November 16, 2010.
    This is a supplemental notice in the above-referenced proceeding, 
of Domtar Paper Company, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Anyone filing a motion to intervene or protest must serve a 
copy of that document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability is December 6, 2010.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
    The filings in the above-referenced proceeding(s) are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29436 Filed 11-22-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.