participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘eFiling’’ link.
Comment Date: December 3, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29317 Filed 11–19–10; 8:45 am]
jlentini on DSKJ8SOYB1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:49 Nov 19, 2010
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13862–000]
Deer Creek Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
November 12, 2010.
On October 14, 2010, Deer Creek
Hydro, LLC (Deer Creek Hydro) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Deer Creek Pumped
Storage Project (Project) near Glenrock,
Converse County, Wyoming. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project will consist of:
(1) Two artificial reservoirs created by
embankments and joined by
approximately 9,715 feet of conduit; (2)
an underground powerhouse to be
located approximately 3,000 feet
southeast of the lower reservoir dam, at
an elevation of approximately 5,450
feet; (3) two 150-megawatt (MW) and
two 100-MW reversible pump-turbines,
totaling 500 MW of generating capacity,
with up to 150 MW of additional
pumping capacity, for a total of 650 MW
pumping capacity; (4) a double-circuit
230-kilovolt, approximately 1.2-milelong transmission line connecting to an
existing substation; and (5) appurtenant
facilities. The estimated annual energy
production for the proposed Project is
approximately 1,533,000 megawatthours.
Applicant Contact: Matthew Shapiro,
CEO, Gridflex Energy, LLC, 1210 W.
Franklin St. Ste. 2, Boise, ID 83702;
phone: (208) 246–9925.
FERC Contact: Patrick Murphy
(202) 502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13862–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29311 Filed 11–19–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13799–000]
San Jose Water Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
November 12, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: 13799–000.
c. Date filed: June 25, 2010 and
supplemented August 27, 2010.
d. Applicant: San Jose Water
Company.
e. Name of Project: Cox Station
Project.
f. Location: The project is located in
Santa Clara County, California.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Thomas Gee,
San Jose Water Company, 1265 South
Bascom Avenue, San Jose, CA 95128,
(408) 279–7886.
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 75, Number 224 (Monday, November 22, 2010)]
[Notices]
[Page 71106]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29311]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13862-000]
Deer Creek Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
November 12, 2010.
On October 14, 2010, Deer Creek Hydro, LLC (Deer Creek Hydro) filed
an application for a preliminary permit, pursuant to section 4(f) of
the Federal Power Act (FPA), proposing to study the feasibility of the
Deer Creek Pumped Storage Project (Project) near Glenrock, Converse
County, Wyoming. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project will consist of: (1) Two artificial reservoirs
created by embankments and joined by approximately 9,715 feet of
conduit; (2) an underground powerhouse to be located approximately
3,000 feet southeast of the lower reservoir dam, at an elevation of
approximately 5,450 feet; (3) two 150-megawatt (MW) and two 100-MW
reversible pump-turbines, totaling 500 MW of generating capacity, with
up to 150 MW of additional pumping capacity, for a total of 650 MW
pumping capacity; (4) a double-circuit 230-kilovolt, approximately 1.2-
mile-long transmission line connecting to an existing substation; and
(5) appurtenant facilities. The estimated annual energy production for
the proposed Project is approximately 1,533,000 megawatt-hours.
Applicant Contact: Matthew Shapiro, CEO, Gridflex Energy, LLC, 1210
W. Franklin St. Ste. 2, Boise, ID 83702; phone: (208) 246-9925.
FERC Contact: Patrick Murphy (202) 502-8755.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13862-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29311 Filed 11-19-10; 8:45 am]