White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests, 71102 [2010-29308]
Download as PDF
71102
Federal Register / Vol. 75, No. 224 / Monday, November 22, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11313–019]
White Mountain Hydroelectric Corp.;
Notice of Application for Amendment
of License, and Soliciting Comments,
Motions To Intervene, and Protests
jlentini on DSKJ8SOYB1PROD with NOTICES
November 12, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-Capacity
Amendment of License.
b. Project No.: 11313–019.
c. Date Filed: March 31, 2010.
d. Applicant: White Mountain
Hydroelectric Corp.
e. Name of Project: Apthorp
Hydroelectric Project.
f. Location: The project is located on
the Ammonoosuc River in Grafton
County, New Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Peter Govoni,
White Mountain Hydroelectric Corp.,
P.O. Box 715, Lincoln, New Hampshire
03251; telephone: (207) 487–3328.
i. FERC Contact: Any questions
regarding this notice should be directed
to Mr. Anthony DeLuca (202) 502–6632
or Anthony.deluca@ferc.gov.
j. Deadline for filing comments,
motions to intervene and protest:
December 13, 2010. All documents may
be filed electronically via the Internet.
See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number
(P–11313–019) on any comments,
motions, or recommendations filed.
k. Description of Request: The
licensee proposes to delete from the
license the authorized but
unconstructed 175-kW generating unit.
The licensee states that the unit, which
was authorized under the license issued
October 17, 1995, was never constructed
due to project economics.
VerDate Mar<15>2010
17:49 Nov 19, 2010
Jkt 223001
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29308 Filed 11–19–10; 8:45 am]
BILLING CODE 6717–01–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13860–000]
Jones Canyon Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
November 12, 2010.
On October 14, 2010, Jones Canyon
Hydro, LLC (Jones Canyon Hydro) filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Jones Canyon Pumped
Storage Project (Project) near Grass
Valley, Sherman County, Oregon. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project will consist of:
(1) Two artificial reservoirs created by
embankments and joined by
approximately 6,225 feet of conduit; (2)
one 250-megawatt (MW), one 100–MW,
and one 50–MW reversible pumpturbines, totaling 400 MW of generating
capacity, with up to 100 MW of
additional pumping capacity, for a total
of 500 MW pumping capacity; (3) a
4.15-kilovolt, 1,800-foot-long,
underground transmission line
connecting to an existing substation;
and (4) appurtenant facilities. The
estimated annual energy production for
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 75, Number 224 (Monday, November 22, 2010)]
[Notices]
[Page 71102]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29308]
[[Page 71102]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11313-019]
White Mountain Hydroelectric Corp.; Notice of Application for
Amendment of License, and Soliciting Comments, Motions To Intervene,
and Protests
November 12, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-Capacity Amendment of License.
b. Project No.: 11313-019.
c. Date Filed: March 31, 2010.
d. Applicant: White Mountain Hydroelectric Corp.
e. Name of Project: Apthorp Hydroelectric Project.
f. Location: The project is located on the Ammonoosuc River in
Grafton County, New Hampshire.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Peter Govoni, White Mountain Hydroelectric
Corp., P.O. Box 715, Lincoln, New Hampshire 03251; telephone: (207)
487-3328.
i. FERC Contact: Any questions regarding this notice should be
directed to Mr. Anthony DeLuca (202) 502-6632 or
Anthony.deluca@ferc.gov.
j. Deadline for filing comments, motions to intervene and protest:
December 13, 2010. All documents may be filed electronically via the
Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and seven copies should be mailed to:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments.
Please include the project number (P-11313-019) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee proposes to delete from the
license the authorized but unconstructed 175-kW generating unit. The
licensee states that the unit, which was authorized under the license
issued October 17, 1995, was never constructed due to project
economics.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29308 Filed 11-19-10; 8:45 am]