Florida Gas Transmission Company, LLC; Notice of Application, 70728-70729 [2010-29057]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
70728
Federal Register / Vol. 75, No. 222 / Thursday, November 18, 2010 / Notices
as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to J.
Gordon Pennington, 2707 N. Kensington
St., Arlington, VA 22207, telephone no.
(703) 533–7638, facsimile no. (703) 241–
1842, and e-mail:
pennington5@verizon.net; or Paul
Lanham, Three Riverway, Suite 1350,
Houston, TX 77056, telephone no. (713)
350–2514, facsimile no. (713) 350–2550,
and e-mail:
paul.lanham@cardinalgs.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify Federal and
State agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
VerDate Mar<15>2010
16:56 Nov 17, 2010
Jkt 223001
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: November 24, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29058 Filed 11–17–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–16–000]
Florida Gas Transmission Company,
LLC; Notice of Application
November 10, 2010.
Take notice that on October 28, 2010,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056, filed in Docket
No. CP11–16–000, an application,
pursuant to section 7(c) of the Natural
Gas Act (NGA), as amended, and Parts
157 of the Federal Energy Regulatory
Commission’s (Commission)
Regulations, to construct, own, operate
and maintain natural gas transmission
facilities (Miami Mainline Loop Project).
Specifically, FGT proposes to construct,
own and operate approximately 3 miles
of 24-inch pipeline loop and install a
pig receiver at Compressor Station No.
22, all of which are located in MiamiDade County, Florida. The total
estimated cost for the proposed Miami
Mainline Loop Project is $35.4 million,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to
Stephen Veatch, Senior Director of
Certificates & Tariffs, Florida Gas
Transmission Company, LLC, 5444
Westheimer Road, Houston, Texas,
77056, or call (713) 989–2024, or fax
(713) 989–1158, or by e-mail
Stephen.Veatch@sug.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
E:\FR\FM\18NON1.SGM
18NON1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 75, No. 222 / Thursday, November 18, 2010 / Notices
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify Federal and
State agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
VerDate Mar<15>2010
16:56 Nov 17, 2010
Jkt 223001
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: December 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–29057 Filed 11–17–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13226–003; Project No. 13368–
002]
Blue Heron Hydro, LLC; Notice of
Applications Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
November 10, 2010.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Types of Application: Original
Major License.
b. Project Nos.: P–13226–003 and P–
13368–002.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
70729
c. Date filed: November 1, 2010.
d. Applicant: Blue Heron Hydro, LLC.
e. Name of Projects: Ball Mountain
Dam Hydroelectric Project; Townshend
Dam Hydroelectric Project.
f. Location: Both projects would be
constructed at existing U.S. Army Corps
of Engineers dams (Corps) that are
located on the West River in Windham
County, Vermont. Each project would
occupy Federal land managed by the
Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lori Barg, Blue
Heron Hydro, LLC 113 Bartlett Road,
Plainfield, Vermont 05667. (802) 454–
1874.
i. FERC Contact: Dr. Nicholas Palso,
nicholas.palso@ferc.gov or (202) 502–
8854.
j. Cooperating agencies: Federal,
State, local, and Tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 30, 2010.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
E:\FR\FM\18NON1.SGM
18NON1
Agencies
[Federal Register Volume 75, Number 222 (Thursday, November 18, 2010)]
[Notices]
[Pages 70728-70729]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-29057]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-16-000]
Florida Gas Transmission Company, LLC; Notice of Application
November 10, 2010.
Take notice that on October 28, 2010, Florida Gas Transmission
Company, LLC (FGT), 5444 Westheimer Road, Houston, Texas 77056, filed
in Docket No. CP11-16-000, an application, pursuant to section 7(c) of
the Natural Gas Act (NGA), as amended, and Parts 157 of the Federal
Energy Regulatory Commission's (Commission) Regulations, to construct,
own, operate and maintain natural gas transmission facilities (Miami
Mainline Loop Project). Specifically, FGT proposes to construct, own
and operate approximately 3 miles of 24-inch pipeline loop and install
a pig receiver at Compressor Station No. 22, all of which are located
in Miami-Dade County, Florida. The total estimated cost for the
proposed Miami Mainline Loop Project is $35.4 million, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing may also be viewed on the Web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Stephen Veatch, Senior Director of Certificates & Tariffs, Florida Gas
Transmission Company, LLC, 5444 Westheimer Road, Houston, Texas, 77056,
or call (713) 989-2024, or fax (713) 989-1158, or by e-mail
Stephen.Veatch@sug.com.
Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public
[[Page 70729]]
record (eLibrary) for this proceeding; or issue a Notice of Schedule
for Environmental Review. If a Notice of Schedule for Environmental
Review is issued, it will indicate, among other milestones, the
anticipated date for the Commission staff's issuance of the final
environmental impact statement (FEIS) or EA for this proposal. The
filing of the EA in the Commission's public record for this proceeding
or the issuance of a Notice of Schedule for Environmental Review will
serve to notify Federal and State agencies of the timing for the
completion of all necessary reviews, and the subsequent need to
complete all Federal authorizations within 90 days of the date of
issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: December 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29057 Filed 11-17-10; 8:45 am]